Resume

Sign in

Project Construction

Location:
Doha, Doha, Qatar
Salary:
16000 QR
Posted:
September 19, 2018

Contact this candidate

Resume:

*-******** : Quantity Surveyor

*-***********:

Marital Status : Single

Date of Birth : 15/11/1982

Nationality : Egyptian

Email Address : ac63k7@r.postjobfree.com

Nationality : Egyptian

Contact No. : +974********

Driving license : Issued from Qatar, United Arab Emirates and Arab Republic of Egypt.

3-Summary of Work Experience :

I am a Quantity Surveyor with Ten years work experience at GCC (UAE & QATAR) through various Infrastructure and Roads Projects with all related MEP, Building Works.

4-Education:

-Bachelor of Science with Honours in Commercial Management and Quantity Surveying from London South Bank University – Faculty of Architecture and Built Environment (Accredited by Chartered Institute of Building-CIOB) - CIOB Membership Number: 2023321

-Higher National Diploma Level 5 (HND) in Quantity Surveying and Construction Economics from Edexcel International - Pearson Education Limited UK.

- Bachelor of Commerce from Alexandria University - Faculty of commerce

5- Trainings Attended:

1. AutoCAD Program / Arab Academy for Science and Technology. (Certified by Autodesk)

2. Primavera Program / Arab Academy for Science and Technology.

6- Computer Background:

Microsoft Office 2013, Internet Applications, AutoCAD 2017, Primavera P6.

7- Foreign Language Capabilities: Arabic (Native Language), English.

8- Work Experience Details

8.01 Name of Employer : NBHH Group (UAE & QATAR)

Title : Quantity Surveyor

Period : April 2008 till Present

Duties & Responsibilities:

1- Quantity take-off, Recapitulation of BOQ.

2 - Preparation of Payment applications.

3- Valuation of Variations/new rates and preparation of BOQ to get certified from Consultant.

4- Prepare and Monitor the Project Financial Budget, Project update reports, and project cash flow forecasts as requested by Management.

5- Rate analysis of the work items.

6- Reconciliation of Materials.

7- Cost valuation of the project.

8- Updating progress report in Weekly and Monthly basis.

9- Monthly financial reports and project cash-flow charts.

10- Floating inquiries /Technical RFI during Pre & Post Stage for BOQ items, drawings, relevant work spec to subcontractors and analyse returned offers to ensure compliance with contract specification and at optimized cost.

11- Prepare Subcontracts Agreements, Main Contract Documents, Bill of Quantities with incorporating drawings and specifications based on the company standard format of contracts documents.

12-Verify sub-contractor’s payments and Supplier’s Invoices.

13- Preparation of claims for Extension of time. Quantify variations as per revised drawings, specifications and follow-up with consultants, subcontractors, project managers.

14- Tender studies and cost valuation for bidding of the projects.

15-Advice and solve the contractual issues.

16- Knowledge and practice in following FIDIC, JCT, CESMM-3 and SMM7 for the projects

17- Prepare project close out documentation such as but not limited to close out report, statement of final account, others.

8.01.1 Name of Employer : Nael Bin Harmal Hydroexport Qatar

Location : Doha, Qatar

Period : From October 2012 Till Present

Projects:

1 - Project Name: GEC-Doha West- DW003 Roads & Infrastructure in West Muaither (Al-Manaseer) Phase 01 (Project Ongoing)

Client : ASHGHAL

Consultant : ATKINS

Contract Amount : 598,000,000 QR

From: September 2016 to date

Project description:

Construction of 35KM 300mm to 600mm diameter VC Storm Water Pipe line in Trench and Micro-tunneling method with related Gullies and Manholes, Construction of Sewerage Manholes on Existing Network with New House connection pipeline and chambers, Road Crossing Ducts, Potable Water Network, Street lighting Network, Electrical, Telecommunication and QNBN Network with all related Chambers, Irrigation Network, Landscaping, 30Km Interlock and Asphalt Roads.

2 – Project Name: Logistics Village Qatar Infrastructure Development Phase V

Client : Gulf Warehousing Company

Consultant : Gulf Engineering and Industrial Consultancy

Contract Amount : 50,000,000 QR

From: January 2015 To: September 2016

Project description:

Construction of Interlock tiled roads for about 60000m2, Supply and installation of water pipes, Irrigation, Firefighting and storm Drainage, Main Sewerage Network with related House connections, STP and TSE complete structure along with Electro-mechanical equipment, MEP works, Two Fire Fighting Pump Rooms with all related MEP works and four above ground water tanks, Supply and installation of street lighting poles and cabling.

3 - Project Name: Logistics Village Qatar Infrastructure Development Phase IV

Client : Gulf Warehousing Company

Consultant : Gulf Engineering and Industrial Consultancy

Contract Amount : 31,000,000 QR

From : June 2013 To : January 2015

Project description:

Construction of Interlock tiled roads for about 3300m, Supply and installation of water pipes, Firefighting and storm Drainage Networks,Sewerage house connections to Proposed Septic Tanks, Supply and installation of street lighting poles and cabling, construction of four above ground steel tanks including associated pumps and electro-mechanical works, Construction of seven Guard Houses at Project Entrance.

4 - Project Name: DOHA & RAYYAN SEWERAGE HBK & ABU HAMOUR AREA SEWERAGE

Client : ASHGHAL

Consultant : COWI

Contract Amount : 135,000,000 QR

From: October 2012 To: June 2013

Project description:

Construction of 40KM 150mm to 500mm diameter VC Sewer Pipe line in Trench and 400mm to 1000mm diameter RC Sewer Pipe line via Micro-tunneling method and the related Manholes, all related House connections.

8.01.2 Name of Employer : Nael Construction & Contracting LLC

Location : Dubai, UAE

Period : From April 2008 To January 2012

Projects:

1 - Project Name: Al Ghadeer Development – Roads and Infrastructure Works

Client : Sorouh Real State PJSC

Consultant : Dorsch Consult

Contract Amount : 215,000,000 DHS

From : February 2010 To: January 2012

Project description:

Alghadeer Development, Roads and Infrastructure Works – Phase 1 consist of different services.

The scope of work as the following:-

Earth Works, Services ducts, Main Sewerage network and House Connections, Strom Water Drainage Works, Irrigation and Fire Fighting Network, Potable Water works, Electrical distribution, Substation works networks, Roads works, Street Lighting Works, Detention Pond, Irrigation Tank and Pump Station, Sewerage Pump Station, Potable Water Reservoir and Pump Station

2 - Project Name: Palm Jebel Ali Fronds Right - Roads and infrastructure

Client : Nakheel PJSC

Consultant : Parsons

Contract Amount : 815,000,000 DHS

From: September 2009 To: February 2010

Project description:

Construction of underground utilities such as water, storm water drainage, sewerage Network and House connections, irrigation, firefighting services, electrical and telecommunication services including manholes, chambers and all other relevant structures of the utilities complete in all respect, Construction of roads, retaining wall and street lighting works.

3 - Project Name: Dubai Metro Project –Utility Relocation and Protection Works

Client : Roads and Transport Authority - RTA

Consultant : Llewelyn Davies

Contract Amount : 1,000,000,000 DHS

From: April 2008 To: September 2009

Project description:

1- Relocation and protection of existing underground pipes of diameters start from 100mm to 1400mm for various kind of utilities such as Water, Sewerage, Storm water Drainage, Irrigation etc. including construction of manholes, chambers and connection to existing networks. Installation of pipe works for the project has been done by conventional methods of open trenches as well as by NDRC Methods.

2-Relocation and protection of existing underground cables and ducts for Electricity and Etisalat works. Installation of Cables and Ducts works has been done through open trenched and by HDD Method.

4 - Project Name: DS 130 Pump Station and its Rising Mains

Client : Dubai municipality

Consultant : Parsons

Contract Amount :65,000,000 DHS

From: April 2008 To: September 2009

Project description:

1-Construction of 1300mm diameter Twin Rising Mains (8300m-long) and 1400mm Single Rising Main (1100m-long) including construction of various type of Valve chambers and fittings along with the Interconnections of existing Networks.

Construction of pipe works for the project has been done by Conventional methods of open trenches as well as by NDRC Methods.

2- Construction of Sewage Pumping Station 'H' has been done by accommodating the following facilities:

Mechanical screen chamber, Wet well, Chemical odor control system room, Transformer rooms, Stand-by generating room, Accommodation building, Boundary wall and fence, Main storage fuel tank

5 - Project Name : 902/1 Improvement of Emirates Road Stage2-Phase1

Client : Roads and Transport Authority - RTA

Consultant : Wilbur Smith Associates

Contract Amount : 75,000,000 DHS

From: April 2008 To: September 2009

Project description:

1 - Construction / Relocation and protection of underground utilities for various kind of utilities such as Water, Sewerage, Storm water Drainage, Irrigation etc. including construction of manholes, chambers and connection to existing networks.

2 - Installation / Laying of Cables, ducts for Electrical and Telecommunication underground utilities including construction of manholes and chambers for relevant utility and also protection of the same.

3 - Street Lighting Works

6 - Project Name : R881/3A Comprehensive improvement of the Parallel Roads - Contract 3A

Client : Roads and Transport Authority - RTA

Consultant : Parsons

Contract Amount : 50,000,000 DHS

From: April 2008 To: September 2009

Project description:

1 - Construction / Relocation and protection of underground utilities for various kinds of utilities such as Water, Sewerage, and Storm water Drainage, Irrigation etc. including construction of manholes, chambers and connection to existing networks.

2 - Installation / Laying of Cables, ducts for Electrical and Telecommunication underground utilities including construction of manholes and chambers for relevant utility and also protection of the same.

7 - Project Name : DS-129 Main Irrigation Lines

Client : Dubai municipality

Consultant : Parsons

Contract Amount : 10,000,000 DHS

From: April 2008 To: September 2009

Project Description:

Construction of 1400mm diameter GRP Irrigation Main Pipe Line (12000m-long) including construction of various types of Valve chambers and fittings along with the Interconnections of existing Networks.

Construction of pipe works for the project has to be done by Conventional methods of open trenches as well as by NDRC Methods

8 - Project Name : DS-126 Main Irrigation lines for Sheikh Zayed Road

Client : Dubai municipality

Consultant : Parsons

Contract Amount : 14,000,000 DHS

From: April 2008 To: September 2009

Project Description:

Construction of 1200mm, 1400mm & 1600mm diameter GRP Irrigation Main Pipe Lines (4000m-long) including construction of various type of Valve chambers and fittings along with the Interconnections of existing Networks. Construction of pipe works for the project has to be done by Conventional methods of open trenches as well as by NDRC Methods.



Contact this candidate