Post Job Free

Resume

Sign in

Manager Engineering

Location:
Bangalore, Karnataka, India
Posted:
September 15, 2018

Contact this candidate

Resume:

G. K. GUPTA

***, ******* *****, **** ****, Kota-*24009

E-mail: ac6180@r.postjobfree.com

Mobile: +91-811*******, 968-***-****

SENERIOR PROFESSIONAL

Extensive experience in executing full life- cycle development project; ramping -up project within time, budget & quality parameter, as per project management & best practice guidelines, targeting assignments in:

Project Management/Plant Operation/Project Engineering

PROFILE SUMMARY

Multi-faceted professional with nearly 22Yr. 2 Month of experience in:

~ Project Management ~Design & Engineering ~Plant Operations

~Erection & Commissioning ~Process Enhancement ~C&I Engineering

Proficient in expediting project activities & overseeing complete project management cycle entailing requirement gathering and final execution of projects.

Preparing & presenting various weekly / monthly MIS reports pertaining to process and productivity

Responsible for engineering. i.e finalisation of project according to specifications

Expertise in planning & gathering the requirements of new projects, areas of criticality and taking inputs from teams

Completing pre-tender obligations like submitting pre-qualifications, study of contractual conditions, project cost analysis

Monitoring contract payments, schedule and contract administration requirements as per specifications.

Excellent interpersonal, communication and organizational skills in team management and planning

ORGANISATIONAL EXPERIENCES

Since Oct 95 Grasim Industries Limited, Jodhpur ( White Cement Division)

Growth Path

Oct 95 to Dec 2005 Graduate Engineer Trainee, Engineer, Sr. Engineer Asst. Manager

Since Jan 2006 Jindal Power Limited, O P Jindal Super Thermal Power Plant

Growth Path (Project 4x250 MW and 4x600 MW)

Jan 2006 to May2015 Deputy Manager, Manager, Sr. Manager, Asst. General Manager,

Deputy General Manager, Sr. Deputy General Manager, General Manager

Since June 2015 Head –(Electrical &Instrumentation) Jindal Steel and Power Limited

To Till today Project Phase -1B

ACADEMIC DETAIL

Year 1995 B. E. Electronic Instrumentation & Control from Engineering College Kota

(Rajasthan Technical University) with First Division

Year 2014 PG Diploma in Project Management From I2P2M affiliated with George Washington University.

TECHNICAL SKILL DETAIL

Experience:-

Presently I am working with Jindal Steel and Power Limited in 2MTPA coke oven & By product project as General Manager (Head of Electrical & Instrumentation). I have successfully commissioned the 2 Nos. Coke Oven Batteries and it By product Plant. Also During my stay in Jindal Power Limited I have successfully commissioned the all four units of 250MW and all four units of 600MW ( BTG and BOP) and I was working as General Manager ( Head – Control and Instrumentation)

Total Experience:- 21 Year 9 Month

Jindal Steel Power Limited (Project Phase-1B)

(June 2015 to till date)

Current Responsibility:-

Detail Engineering, Erection and commissioning of 2MTPA Recovery Coke Oven and By Product Plant

1.Erection and commissioning of 2 Nos. coke Oven Battery and its associated Electrical and Instrumentation.

2.Erection and commissioning of By Product plant and its associated Electrical and Instrumentation

Jindal Power Limited (4 X 250 MW Phase-I&II and 4x600 MW Phase-III)

(Jan 2006 to May 2015)

Current Responsibility:-

Detail Engineering, Erection and commissioning of 4x600 MW ( from Jan 2009 to till date )

Boiler & auxiliaries, Turbine & Auxiliaries and Station C&I

1.Finalization of technical specification of BTG and station C&I.

2.Review and study of Bidding documents of BTG and station C&I and finalize the same with best engineering solution and scope of work.

3.Preparation for KOM with BHEL on various agenda points.

4.Finalize the L-1 schedule of BTG and station C&I.

5.Finalize L-2 network of various BHEL Units.

6.Finalization and approve the Drive control Philosophy, cable scope diagram, P&Id’s of Boiler and Turbine, Basic scope diagrams, Logics of Turbine and its auxiliaries, Boiler and its auxiliaries logics, TG Floor plans, Boiler floor plans, Location of Boiler and Turbine Instruments racks and JB’S, and other drawings data sheets.

7.Finalization of Location and Sizing Control room, Control Equipment Room, Engineering room, UPS & batteries Room, SWAS room and other panel room.

8.Finalization of Plant DCS configuration and architecture.

9.Finalization of Interface scheme between DCS and other PLC’s.

10.Detail engineering of Cables and cable Tray routine.

11.Detail Engineering, Erection and commissioning of complete Boiler & its auxiliaries, Steam Turbine & its auxiliaries and generator instrumentation.

BOP in Project 4x600MW

1.Finalization of technical specification of various BOP packages like WTP, River water Intake system, Raw water pumping system, CW & ACW pumping and piping system, Coal handling plant, Ash handling plant, Fuel oil unloading system, Compressed air system, Mill Reject system and Misc. Instruments Package.

2.Review and detail study of bidding documents of various bidders and prepare comparative statements and select technically best one.

3.Finalization of Control room and Panel Room of BOP packages.

4.Finalization of Drive Interface Scheme, UPS Scheme, PLC configuration etc.

5.Detail Engineering, Erection and commissioning of complete BOP packages (CHP, AHP, WTP, CPU, Raw water Pumps, River Water Pumps CW and ACW systems, Fire detection &protection system, Mill Reject system Etc.)

Detail Engineering, Erection and commissioning of 4x250 MW ( from Jan 2006 to Dec 2008)

Station (C & I) :-

1.Erection and commissioning of max DNA Distributed Digital Control Monitoring and Information System (DCS) and Complete Networking system.

2.Detail Engineering of Cable scheduling, Termination details for HT & LT feeders to DCS, Cable Tray routine, data communication between BOP PLC’s to DCS,

3.Electronic Earthing Scheme for DCS and other electronic Instruments.

Boiler and Its Auxiliaries Control and Instrumentation:-

Detail Engineering, Erection and Commissioning

ID, FD, PA fan Control 2) Air Pre-heater Control, Bowl Mills and its Lub. oil control system, Soot Blowers control, Secondary Air damper control.(SADC), FSSS (Furnace Safeguard Supervisory System), Coal and Oil Elevation Interlock and Protection, Fuel Oil System, Steam and Water Circuit Instrumentation, Checking of Boiler and Auxiliaries. Protection and Logics

Steam Turbine and its Auxiliaries control and Instrumentation:-

Detail Engineering, Erection and commissioning: -

Turbine Lub Oil system, Generator Seal oil system, Generator Seal oil system, Turbine control Oil system, EHTC, LPBP and HPBP, TCI, Generator Instrumentation, Condensate Extraction system Instrumentation, BFP’S and Feed water Instrumentation, Condenser Vacuum system Instrumentation, Main Steam, CRH and HRH Instrumentation, ATRS, ATT, Checking of Turbine Protection System.

Grasim Industries Limited ( White Cement division )

(Oct 1995 – Dec 2005)

Cement Project

Experience

1.Erection and commissioning of Various type of DC and AC Drives of ABB L&T and Siemens, Various type Weigh Feeders Like of S&J and Transweigh (Germany), Pet coke firing system, Loss and Weight system, Bin weighing system, Pet coke conveying system, Dust (Ash) handling system (Densveyor dust handling system), Allen Bradley PLC SLC 500 Series, Chloride By pass Bag house (Thermax), Soot Blowers for cleaning of Air heater Tube cleaning with Allen Bradley PLC. (BHEL), TCS Loop Duct, 2 x 25 KVA UPS of Tata Libert, complete Plant Instrumentation of Kiln and Raw Mill Section.

2.Erection and commissioning of MAX DNA DCS for complete Plant automation

Hands on Experience on Detail Engineering of automated Cement plant which included preparation of control schemes of complete plant ( Raw mill, Kiln, Dryer and clinker Transport), Instrumentation Loop s diagrams, material Indenting and procurement, Project Planning,Detailing and scheduling, cable Scheduling and wiring detailing, analyzing of block interlocking of process equipment supplier, checking and approval of control drawing of various panels preparation of complete plant I/O list data base, Pre- commissioning check the all the drive and plant equipment and all Plant control groups, Final commissioning of White cement plant.

3.Erection and Commissioning QCX System (FLS)

Installation of New Win – XRF software for X-Ray analyzer.(ARL), Calibration of Different Programmes QCX, Installation of New Raw Mix control system of FLS Automation, Blend Expert System for Raw Mix control.

Personal Briefs

Date of Birth - 10th Jan 1971

Sex - Male

Marital Status :- Married

Computer MS-Office

Literacy Window -98, Window – XP, MS - Project, SAP

Present G.K.Gupta

Address General Manager (Electrical & Instrumentation)

Jindal steel and Power Limited

Project (Recovery type coke Oven and By product Plant)

Angul,

Odisha

Current Salary Rs.32.00 Lakhs/Year

Expected Salary Negotiable



Contact this candidate