Resume

Sign in

Engineer Project

Location:
Buenos Aires, Buenos Aires, Argentina
Salary:
10,000
Posted:
June 13, 2018

Contact this candidate

Omar Antonio Peley Sandrea

Passport #: *********

USA Tourist Visa

Birth Date and place: July 9, 1969. - Maracaibo, Zulia E-mail: ac5u7d@r.postjobfree.com / ac5u7d@r.postjobfree.com Major in Petroleum Geology

Reservoirs Engineer

T. S. U Geology

CIV: 155780 (Venezuela)

Development Program Reservoirs (PIA)

Mobile Ph.: +52-199*-*******

Home Ph.:+52-993*******

Address:

M. Garcia Barragan. Privada Real del Parque. Casa 4 C.P: 86150 Villahermosa, Tabasco, México

https://www.linkedin.com/in/omar-antonio-peley-sandrea-51946733/ EDUCATION

Magister Division Master's Degree in Petroleum Geology 2002 – 2004 Zulia University

Politécnico Santiago Mariño Industrial Engineer 1995 – 1998 IUT de Maracaibo Geology Technician 1987 - 1990

Languages:

English (fluent)

Spanish (native)

- English 6 levels. CIED Centro Internacional de Educación y Desarrollo

- English 7 levels Centro Electrónico de Idiomas

- English 10 levels. English Town (on line)

- French (basic) CEDIC

WORK EXPERIENCE (27 Years in Oil Industry)

Summary: April 2007 – Present:

Exploration - Operational - Staff Geology Senior. Well Site, Drilling, Geomodeler (Part time Geophysicist). SCHLUMBEGER - Mexico

Static Geology Modeling, population rock properties. PETREL 2013.Structural

Field Reservoir Modeling PETREL

Regional Geology / • Structural Geology / • Geological modeling

Create studies for new oil locations, field locations support geology controller.

Control vertical and directional wells, (Directional Operator) save core, testing, mud logging.

Advises the purchases or dispositions leases based on integrated geological and geophysical information; major contributor to lease sale evaluation efforts.

Supervises geological aspects drilling wells.

Generates detailed reservoir characterizations by incorporating structure interpretations, cross-sections, well log correlations and structural/stratigraphic framework analysis.

Geologist Environmental Projects

• Exploration and Studies of geological sites.

• Generation of static geological models. (Petrel)

• Sequential Stratigraphy.

• Generation of new opportunities and exploratory prospects.

• Paleo environmental models.

• Stratigraphic correlations.

Groundwater sampling, collection of soil samples, installation of monitoring wells, identification and evaluation of sensitive receptors, analysis and interpretation of analytical data, authoring technical reports, move forward sites towards regulatory closure, learning and honing the fundamentals of Data Collection; data validity and Quality Assurance/Quality Control (QA/QC); observation and documentation in support of scientific investigations and engineered solutions.

Drilling unconventional reservoirs. Carbonates Wells. Mexico.

Recommends major areas for future exploration efforts;

Generates/advises about drilling opportunities to management;

Develop geological models from well logs, cross-sections and maps;

Constructs geological maps from well logs and seismic data;

Familiarity with current salt tectonics research, and apply those concepts to geologic and seismic interpretation within complex and challenging environments.

Participates in multidisciplinary team following well drilling operations in order to evaluate results South Mexico, Villa Hermosa, IPM Schlumberger, Well depth (6500 meters) Static Models

The project won the 2010 Schlumberger Chairman’s Award Cost controller Engineer

Knowledge in HSE programs, management systems (ISO 14000, OHSAS 18000, SEMS) Specialties (Advanced Petrol Use):

Operations Geologist (Partial time Geophysicist)

Regional Geology

Reservoir Geologist

Geologist Environmental Projects

Busines Development

Geological Modeling

Exploration Geologist

Industrial Engineer

Project Engineer (Cost Controller)

November 2017 – Currently

Weatherford Laboratories

Geological Business Development

Field and laboratory services, geological services, basic conventional petrophysical services and special tests, reservoir engineering tests, geometry, production fluid analysis, unconventional deposits: Shale GAS - OIL May 2017 – October 2017

Hidro Industrial O & G

Technical manager

• Development of projects, construction, consultancy, development of technologies, sale of products and equipment in the field of environmental engineering

• Contamination of soil, subsoil, and groundwater

• Characterization studies in soils contaminated with hydrocarbons.

• Remediation of sites contaminated by hydrocarbons.

• ISO 14001: 2015. Environmental management systems. Requirements.

• NMX-SAA-14001-IMNC. Environmental Management Systems.

• Internal Regulations of the National Agency for Industrial Safety and Protection

•Environment of the Hydrocarbons Sector (ASEA). SOILS NOM-138-SEMARNAT_SS_2003_Limites Max permissible hydrocarbons in soils

• General criteria for the operation of various types of units (agencies) carrying out the verification (inspection). NMX-EC- 17020-I MNC-2014 (EMA).

October 2016 - April 2017

GOINSA

Senior Geologist:

Static Model and Static Geological Modeling, PETREL2014. PEMEX. Campos Xanab-52, Manik Paraíso, Tabasco. Documents Control, white papers, Schedule, deliverables- Customer (PEMEX) February 2016 – May 2016

GOALS

Geologist:

Static Model and Static Geological Modeling, population rock properties. PETREL2013. PEMEX. Campos Poza Rica and Tres Hermanos. Poza Rica, Veracruz.

October 2015 – January 2016:

Olmeca University. Villahermosa, Tabasco

Associate Professor. Academic Department of Earth Sciences. Subjects: Formations Evaluations (logs), Petrophysics, Reservoir Static Characterization. Supervisor: Engineer Martin Martínez Pedraza ac5u7d@r.postjobfree.com April 2015 – July 2015:

Project – Sales Engineer

Company: CORGLEZ. Ciudad Del Carmen, Campeche

Extensive knowledge in HSE programs, management systems (ISO 14000, OHSAS 18000, SEMS) January 2014 – November 2014. Schlumberger Mexico: Geomodeler:

Static Geological Model. PETREL 2013. (Grids, cells, surfaces) Activo Samaria Luna (PEMEX). Villahermosa, Tabasco. April 2013 – December 2013. Schlumberger Mexico:

Geology (VCD Team integrated. Schlumberger) Paraíso, Tabasco. Roles in Geology activities. Integrate Team. VCD Fields MAY and KUIL Structural Field Reservoir Modeling PETREL

October 2011 – March 2013 Schlumberger Mexico:

Geologist Supervisor.

Supervisor and director of activities for work team:

- 2 Geologists

- 2 Geo mechanics

April 2007 – September 2011 Schlumberger Mexico:

Geologist Supervisor.

Creator of studies for new oil locations, field locations support geology controller Controller of vertical and directional wells save core, testing, mud logging Operational and office Geology Senior.

- Creator of studies for new oil locations, field locations support geology controller

- Controller of vertical and directional wells, save core, testing, mud logging

-Recommends purchase or disposition of leases based on integrated geological and geophysical information; major contributor to lease sale evaluation efforts.

-Supervise geological aspects about drilling wells

- Generate detailed reservoir characterizations by incorporating structured interpretations, cross-sections, well log correlations and structural/stratigraphic framework analysis

- Recommend major areas for future exploration efforts;

- Generate/recommend to management about drilling opportunities

- Familiarity with current salt tectonics research, and applied those concepts to geologic and seismic interpretation within complex and challenging environments.

- Participate in multitasking team following well drilling operations to evaluate results. Mexico South, Villa Hermosa IPM Schlumberger Deep well (6500 meters) Drilling wells in Carbonates Reservoirs. (Mesozoic) It project won the 2010 Chairman’s Award Winner Schlumberger January 2006 – April 2007:

Main Planning Engineer. Oil Project.

(Ehcopek-SA ) Ciudad Ojeda, Zulia

Analyst Project Planner. Microsoft Project. Construction Sequence of activities. Two weeks forecast. Personnel histograms, equipment, materials. Costs Control. Metric calculations. Progress reports, others. (Supervisor role) October 2004 – July 2005:

Project Planner Engineer.

(Petrolago) Boscan Field Perija, Zulia CHEVRONTEXACO Project Planner Analyst. Microsoft Project. Construction Sequence of activities. Two weeks forecast. Personnel histograms, equipment, materials. Costs Control. Metric calculations. Progress reports, others. March 2002 – March 2004 PDVSA Venezuela:

Exploitation Unit Reservoirs Geologist Bachaquero, Lago. Geologist. Reservoirs Geologist in “Bachaquero Lago”. Knowledge media in operations of drills, practices and stops of wells taking of samples in settlings of pipelines. (Maracaibo Lake, Venezuela). Horizontals, multilateral wells. November 2001 – February 2002 (temporary allocation) PDVSA Venezuela: Infrastructure Studies Geologist in the Bachaquero Lake unit Operation. Supervision and control in the use and handling of the unit's facilities. Complemented with regular visits to facilities in Maracaibo Lake. Plants, multiple, wells, pipes, valves, etc. May 2000 – October 2001 PDVSA Venezuela:

Management Analyst Engineer in the Exploitation of the Bachaquero Lake unit. Activities Management of the Analysis and Investment Budget Analyst of Bachaquero Lake unit. November 1998 – April 2000 PDVSA Venezuela:

Integrated Exploitation Studies Geologist of the Bachaquero Lake unit. Geologist of the Intercampos SMS area in the development of the static model carried out as a group among personal PDVSA and BEICIP FRANLAB. - Study and characterization of the “The Shadow” area in the Intercampos wells BA- 2405, BA-2406, BA-2407, BA-2409. Applications Management at LANDMARK. Active Participation (next to Asdrúbal Sandia) in the elaboration process of the series of maps of the Intercampos area of the Integrated Studies (K, Sw, I Am Vsh, ANP, Structural, other) ZIMAP - STRATWORKS - Member (5 months working with the team for the endorsement of practices in the Integrated Studies [Maracaibo]) Known team companions: Pedro Mendoza, Dawn Pineda, Carlos Courts February 1998 – October 1998 PDVSA Venezuela:

T. S. OR in Geology/Engineer. Industrial Transfers Engineer to Reservoirs. Regular Reservoirs Student of the Integral Training Project of III Reservoirs. CIED Maracaibo - Specialization in the Deposits area as one of the geologists on the final team. Project carried out in the Deposits of MARAVEN, LTD (LAGOMAR) Levels I-V English CIED PDVSA. Positioned as 1 of 20 inside the final qualified of the PIA III group. Known team Companions: Urbina J. / Vine E. / Cinfuentes J. U. E. Bachaquero Lago PDVSA

March 1991 – January 1998 PDVSA Venezuela

T. S. OR in Main Assistant Geology of Geologist in the Organization of Geology (LAGOVEN, LTD) - Management of reports in the Technical Applications of Geology (MARK IV) as structural sections, Boards, maps, reports of Production other. - Elaboration, structural correlation of sections. Support to the geologists in the elaboration of the Prior Studies of Locating - Support in the annual revisions of the geological maps carried out by the section of maps of the Organization of Geology Lagoven, LTD. (symbol, I color, failures) - Technical geologist of the team of study that originated the discovery of the deposit C-7-X.14 Eoceno, Bachaquero South Exploratory well: BA-2015 November 1990 – March 1991 PDVSA Venezuela:

T. S. OR in Geology Teacher of professional practices in field and laboratory in the University Institute of Technology of Maracaibo (hired) – History of Geology Professor - Geotechnics Professor - General Geology Professor - Petroleum Geology Professor

TRAINING (interests areas)

Institute – Organization Location Course Date Duration Entidad Mexicana de Acreditación

(EMA)

Ciudad de México Taller para Unidades de

Verificacion NMX-EC-

17020-IMNC-2014

May

2017

16 horas

SCHLUMBERGER Villahermosa Prevención y Pega de

Tuberias

Julio

2011

24 horas

SCHLUMBERGER

Villahermosa

Mexico

PETREL G&G 2010

Basic Course

Jan

2010

40 hours

SMITH Tabasco, Mexico Drilling technologies 2009 16 hours Entrenamiento Schlumberger

Mexico

Mexico Sur

16 Schlumberger

induction courses

2007 120 hours

DESCA Adiestramiento Maracaibo Microsoft Project 200*-****-** hours DESCA Adiestramiento Maracaibo

Microsoft Excel 2003 –

Advanced level

2006 16 hours

ATESI La Cañada Drilling. Safe procedures 2004 8 hours CEDIC Maracaibo French (basic) 2003 20 hours

CIED

La Puerta Trujillo

Schulumberger

Identification of records

by outliers

2002 40 hours

CIED Tamare Edo. Zulia

Introduction to

exploration and

production processes

2001 40 hours

CIED Maracaibo Edo. Zulia Financial vision 2001 40 hours CIED Maracaibo Edo. Zulia

Analysis and evaluation

of the performance of

processes I

2001 16 hours

CIED Maracaibo Edo. Zulia

CIED

Comprehensive program

of training in reservoir

engineering PIA III

1998

(11

months) it

includes 1

month of

intensive

English

CIED Caracas

CIED Geological maps

1997 40 hours

CIED Caracas

CIED Geoframe geology

1997 40 hours

CENTRO ELECTRÓNICO DE

IDIOMAS

Maracaibo, Zulia Basic English 1997 1 mes

LANDMARK

Ciudad Ojeda Landmark

Learning stratworks 3.0

1996 40 hours

LANDMARK

Ciudad Ojeda

Z- MAP for interpreters

1996 24 hours

Landmark

WESTERN ATLAS

LOGGING SERVICE

Tamare, Zulia

Western Atlas

Advanced topics of

analysis and records

1995 25 hours

CEPET Maracaibo, Zulia

Sedimentology of

production

1994 40 hours

CEPET

Maracaibo, Zulia

Sampling, handling, and

conventional analysis of

nuclear specialties

1993 24 hours

MARAVEN Ciudad Ojeda, Zulia

Profile interpretation

1993 40 hours

LAGOVEN Maracaibo, Zulia

Geology Techniques

Application

1991 40 hours

CEPET Maracaibo, Zulia

Applied geology to

drilling processes

1991 40 hours



Contact this candidate