Resume

Sign in

Foreman Plant

Location:
Vereeniging, GP, South Africa
Posted:
May 16, 2018

Contact this candidate

CONCOR ROADS AND EARTHWORKS JULLY **** TO MAY ****

POSITION SECTION LEADER

SITE KHUMANI IRONE OR MINE

RESPONSIBLE FOR

conducting toolbox talk.. in charge of load and haul team,layer works, responsible for health and safey on site, doing paper work, foreman s report, daily costing, machines inspection and sign check list for all plant on my section. Bulk Excavations and restricted excavation inspections. Doing quality inspection when the client comes to side.. responsible for environment on side. Constructing platforms for steel structure.. and railway line platforms.

CONCOR ROADS AND EARTHWORKS

JUNE 2007 TO MAY 2008

POSITION JUNIOR FOREMAN

SITE N12 CHRISTIANA NW

RESPOSIBLE FOR

constructing N12 high way from bluemhoff to Christiana.. roads layer works, reinforce and shuttering for wing wall, and head wall.. installing culvert pipes and storm water pipe line subsoil drain.. responsible for signing of excavation inspection forms to all excavation on site... incharge of bulk excavation and load and haul team..

ROSHCON ROADS AND EARTHWORKS

JUNE 2008 TO FEBRUARY 2010

POSITION JUNIOR FOREMAN

SITE BETHAL COAL MINE MP

RESPONSIBLE FOR

weekly planning for my 4 team leaders that were reporting to me.. load and haul team. Stabilizing using lime and cement. Site finishing trimming high slopes and roads shoulder.. priming and asphalt roads.. building ash dam at komati power station... doing dam wall, subsoil drains.

STEFANUTTI STOCKS ROADS AND EARTHWORKS

MARCH 2010 TO SEPTEMBER 2010

POSITION EARTHWORKS FOREMAN

SITE FORZANDO COLLERY MINE MP

RESPONSIBLE FOR

reinforcing and shuttering for conveyor plints.. paving. Deep excavation for buildings .. topsoiling to dam wall and hidrauciding. Layer works.. incharge of 4 supervisors.. doing planning for them.. daily costing..daily foreman report... doing quality inspections. Exposing electric cable.. install stormwater pipes.. manholes and for plant inspection on site. Subsoil drain Controlling traffic on site.. working under a huge restricted ares..

OCTOBER 2010 TO FEBRUARY 2011

POSITION EARTHWORKS FOREMAN

SITE...BENSTONE GOLD MINE AT MP

RESPONSIBLE FOR

safety for all my teams on my sections.. conducting toolbox talk at the morning and when the task change during at any time of the day.. layer works.. constructing dam.. subsoil drain.. paving slurry catch dams.. site finishing... concrete slaps.. culvert pipes... had 4 teams and supervisors were reporting to me..

MARCH TO OCTOBER 2011

POSITON EARTHWORKS FOREMAN

SITE MAFUBE COLLERY MINE MP

RESPONSIBLE FOR

3 supervisors.. constructing roads and platforms for steel structures.. concrete plints and slaps...

NOVEMBER 2011 TO APRIL 2012

POSITION EARTHWORKS FOREMAN

SITE BRITS FERROCHROME MINE NW

RESPONSIBLE FOR

constructing ash dam and slurry catch dam.. subsoil drain... Dam wall.. gravel roads and manholes and installation of pipes and bankfilling... load and haul team...

MAY TO AUGUST 2012

POSITION EARTHWORKS FOREMAN

SITE KZN POWER STATION

RESPONSIBLE FOR

roads layer works.. roadbed.. fill .. lower selected.. upper selected... Subbase.. base ... and asphalt... Will wall for curlvet pipes..

SEPTEMBER 2012 UP PRESENT / NOW

POSITION EARTHWORKS FOREMAN

SITE KUSILE POWER STATION MP

RESPONSIBLE FOR

topsoiling dams slopes and V drains... land scaping... paving.. deep excavation for underground building and for potable water pipes.. concrete slaps... all roads layer works... managing topsoil stock pile ... dump sites haul roads... ash dams ... constructing station dirty dams... bulk backfilling ... managing site plant...



Contact this candidate