Post Job Free
Sign in

Manager Maintenance

Location:
Roanoke, VA
Posted:
May 10, 2018

Contact this candidate

Resume:

Thomas E. Cook

*********.****@*****.***

276-***-****

SUMMARY

Goal-oriented manager with 20 years of manufacturing experience and expertise in maintenance systems and the know-how to improve equipment reliability and production efficiencies. Extensive experience transitioning maintenance departments from reactive to proactive through system development and setup.

Project Management

Budget Management

SAP Maintenance

Preventive Maintenance program

Controls and Automation Specialty

Employee Development

Continuous Improvement

Cross-functional Team Building

Inventory Control

HACCP Certified

ISO 14001,18001, 9001, 22001 certified facility

PROFESSIONAL EXPERIENCE

Hanes Brands, Martinsville, Virginia 2017 – Present

Maintenance Engineering Supervisor

Responsible for Maintenance operations across 4 shifts which in tells planning work overseeing execution and following up after completion. Outside of Maintenance operations I served as a Project Manager for both Capital projects and in-house projects.

Managed 14 employees across 4 shifts

Assisted with setup and implementation of an Inhouse Computer based PM program

Functioned as a Project Manager

Worked with other areas to build interdepartmental relations

COCA-COLA BOTTLING COMPANY CONSOLIDATED, Roanoke, Virginia 2005 – 2017

Production Manager, 2015-2017

Responsible for all facets of product production while ensuring product was produced safely and met all Food Safety and Food Quality Standards. Provided team leadership and coordinated production, quality and maintenance departments to ensure effective execution of production schedules in a timely manner.

Acted as interim Plant Manager while the person in that role was on medical leave (December 2016-May 2017)

Developed supervisors and team members through coaching and team building

Continuous Improvement Program Owner

Material and Product Integrity Program Owner

Improved can line performance from 50 – 60% efficiency to 75 – 85% efficiency by changing line controls and product flow as well as working with operators to determine issues and drive correction

Functioned as Project Manager and trained the Maintenance Manager in project management

Trained and developed a new Maintenance Manager for the Roanoke Facility

Participated on the Transformation Team as a Deployment Lead, transitioning 3 new facilities and training Maintenance staff

Maintenance Manager, 2010-2015

Provided direction for facility upkeep and asset protection and equipment upkeep for a 26 million case a year high speed production facility while ensuring that product was produced in a safe, timely manner.

Managed departmental budget of $1.9 million

Functioned as onsite administrator for the SAP Maintenance program

Directed maintenance activities for a team of 3 supervisors and 18 multi-craft mechanics,

electricians, controls technicians, and clerical employees

Functioned as Project Manager for all projects under $5 million dollars

Increased Maintenance Completion Rates to 98% completion on Preventive Maintenance

Reduced the corrective work order backlog from 13 pages to 1 page

HACCP and Food Safety Team Member

Served as Incident Management and Crisis Resolution Coordinator

Instituted a Continuous Rebuild program that reduced downtime by 288 hours annually

Served as a Maintenance Systems Steering Committee member for the company

Trained and developed other Maintenance Managers

Manufacturing Supervisor – Maintenance, 2009-2010

Supervised a staff of 18 personnel across 4 shifts including planners and schedulers.

Served on the local team to implement SAP Maintenance

Developed Preventive Maintenance plans for all facility equipment

Established automated rebuild schedules within SAP and setup MRP to order parts for rebuilds

Introduced Lean principles and a 5S layout to the maintenance department.

Designed and Implemented an Automation Network, 98% of all PLC and HMI equipment was networked

Continued to provide Controls and Automation support for PLCs and HMIs

Controls Technician, 2005-2009

Provided a higher tier troubleshoot level to maintenance personnel and work with plant management to complete projects with the goal of improving production output, quality, efficiency or reducing cost

Successfully developed and implemented multiple applications for example:

o Production monitoring system

oConveyor lubricant delivery system

oVision application for Rejecting defective closures

Software systems used RSLogix 5, 500, 5000; Studio 5000; Factory Talk View Studio; RSView 32; various drive programing systems

SARA LEE - EDEN YARNS, Eden, North Carolina 1996 – 2005

Lead Electrician / Maintenance Supervisor, 1999-2005

Provided leadership and support to a team of 11 electricians, HVAC personnel and general maintenance employees in addition to managing vendors and contractors and providing a higher tier support to the facility personnel.

Developed a program to reduce cost around motor and circuit board repairs that saved over $200,000 in the first year

Invited to serve on a corporate level committee to reduce maintenance cost

Successfully managed and completed several projects for PLC and control system upgrades

Developed and installed machine choke monitors that reduced weekly downtime on Truetzschler MPMs by several hours.

Developed a Preventive Maintenance program for Truetzschler Cards that reduced weekly downtime by several hours across 120 machines and reduced DC motor repair costs.

EDUCATION/TRAININGS

Associate of Applied Science in Industrial Electronics Technology

Patrick Henry Community College, Martinsville, Virginia



Contact this candidate