Yolanda Dangerfield Cell phone - 832-***-****
Objective:
To work for an energetic company where my skills can be utilized to a higher level.
Experience:
**/****-**/**** ** Aero Energy Houston, TX
Lead Materials Planning & Execution Specialist
*SMI reduction by 20% for TM2500 product line
Partnered with both engineering and manufacturing teams to successfully reapply on hand material on units being manufactured. Resulting in a 20% reduction of SMI and a $2.8MM cost savings for TM2500 units. There were some parts that we used As-Is and others that had to be modified in house or sent to vendors for conversion.
*Material and Engineering Alignment of Processes
Worked with this cross-functional planning team to ensure complete engineering process alignment. The team focused on parts attribute ownership, definition, functional roles/responsibility, item activation and change management process. Throughout the work-out the team used the lean methodology by removing multiple manual steps and consolidating task approvals, but still ensuring alignment to the overall design.
*Implemented Project Improvements
Implemented and tracked 5 Projects totaling over $11MM.
Engine Conversion – Partnered with the Aviation engineering team to develop plan to convert two on hand engines and reapply them which realized a savings of $10MM.
Gen8 Phase 4 update - This new update used new parts and revisions. With buy in from engineering and manufacturing teams, I successfully reapplied existing material and realized savings of over $1MM. There were no major changes to the design of components required.
Bellmouth Seal – Existing components had safety issues that were found in the field that required replacement with a new seal. Managed the process of replacing the needed seal in 49 units for both domestic and international markets.
*Implementation of Gen8 TM2500
Products & Services/Technology/Simplification
Participated, tracked and managed the changes that came across to Manufacturing during the Gen8 Phase 4 update. Worked with engineering, manufacturing and sourcing daily to monitor changes. There were over $500K of conversions implemented on units already in process to update the different electrical assemblies to the current engineering revision.
02/2001 -02/2008 GE Aero Energy Houston, TX
Configuration Control Specialist
Manage standard engineering bills of materials, job configurations and drawings for LM6000, LM2500, LMS100 and PGT units in Oracle ERP and Matrix One.
Assisted engineering using Oracle to resolve part issues potentially impacting future jobs scheduled for manufacturing.
Provided support for sourcing and manufacturing with any part issue problems that affect Material Requisition Planning (MRP).
Managed inventory and focused on eliminating and preventing excess and inactive materials.
Supported and assisted on numerous Lean and Six Sigma Workouts focused on reducing cycle times and improve quality.
Managed all bills of material issues relating to units in the Title Transfer process. Assured that parts not required were removed and parts not being delivered in a timely matter were moved to ECA; affecting MRP, Inventory and Engineering.
Assisted the IT department on the creation of reports focused on inventory management.
06/2000 – 02/2001 S & S Energy Houston, TX
Production Planner
Managed and updated the production schedule to ensure all units processed through manufacturing were accurately and on time.
Initiated the opening and closing of work orders in Oracle ERP to ensure a clean Title Transfer of each Scheduled unit.
Assisted in establishing shortages for production from the Heavy Fabrication team through the final shipment process. This process reduced shortages by 45%.
12/1998 – 06/2000 S & S Energy Houston, TX
MRP Planner
Managed the cleanup of false demands, allowing the business to react faster in buying parts and ensured order accuracy.
Created Requisitions in Oracle ERP for demand of all parts being purchased by Sourcing.
Assisted the sourcing team in the purchasing of components negatively impacting manufacturing.
01/1997 – 12/1998 Stewart & Stevenson Houston, TX
Document Control Specialist
Maintained job specific, standard drawings/documents and transmittal of drawing outside and within the company.
Distributed drawing /documents to customers and vendors.
Managed the material list for required material and reference drawings per standard product line.
Education:
Bainbridge High School, 1991
U.S. Army 06/1991 – 06/1996
GE Power Systems - Green Belt Certified
Chemical Processing - Lee College