Resume

Sign in

Engineer Project

Location:
Doha, Doha, Qatar
Posted:
April 29, 2018

Contact this candidate

Resume:

Ahmed El Shaer

Doha, Qatar

Mokattam, Cairo Egypt

009**-********

009**-********

ac5aaa@r.postjobfree.com

Nationality : Egyptian

Married, have 3 children

ABOUT ME

I’m 14 yrs experienced Electrical

MEP Manager with diversified

expertise in all kind of building

projects (Hospitals, Hotels,

High Rise buildings, Commercial &

Retail, Governmental building

with Reputable firms in region and

participated in No of Mega

landmark projects had been

executed in the region.

I’m looking to develop my career

path with reputable organization

in my field of experience where I

can help and developed in same

time

SKILLS

WORK

Dialux, Calculux

Ecodial, Docwin

MS Office

ETAP, REVIT

Mgmt softwares

PERSONAL

COMMUNICATION

ORGANIZATION

TEAM PLAYER

CREATIVITY

COORDINATION

Ahmed Abdelazim Ahmed Hassan El Shaer

MEP Manager

Certified PMP. 2158343

IET Member with MIET No : 110*******

BEng of Electrical Power Engineering 2004, Good Grade 2.3 Grade A Certified Electrical Eng in MME Qatar, KSA Eng Committee and Egyptian Syndicate.

processing for CEng certification from Engineering Council. SUMMARY

With 14 years of experience in design and construction management phases in MENA construction field from preliminary design stage up to final tender issuing for contractors’ bidding with full technical & financial management to meet stakeholders’ requirement in many Mega projects with different municipalities :

With full awareness of related international Codes “ NFPA, BS, IEE, IES, CIBSE, ASHRAE, IEC,EIT..” and related local codes “ KAHRAMAA, DEWA, ADEWA, SEC, Egyptian Code

Carry out the design review all project’s technical docs and performing the necessary value engineering studies to control and optimize the projects budget with keeping the Client satisfaction.

Reviewing proposal tender, Prequalification and Contractors bidding prior to installation to ensure its compliance to Client, Authorities and Codes requirements

Reviewing Construction time schedule, following up its progress as per Program and carry out necessary correction actions

Reviewing the Contractor’s shop dwg, calcs, mat submittals, RFI’s, and method statements for approval prior to installation

Ensuring the proper coordination between MEP systems and with other disciplines and proper communication with all stakeholders.

Enhancing the projects sustainability with utilizing the new sustainability technology in the project within the budget.

Evaluation of Contractor’s claims of variations to control the project changes log and its impact on time and budget.

Reviewing Risk register, PMP plan, project logs for proper project monitoring & controlling as per project baseline and budget.

Keeping proper communication with all project’s stakeholders with proper proactive PIS circulation to control the SPI and CPI of the project as planned.

Reviewing monthly progress report and payment certificate for approval and project control.

Supervising MEP team daily activities of site and material inspections as per codes and projects specs.

ensuring the project quality management along the project lifecycle.

Carrying out the project T&C and snagging before handover.

Performing the necessary communications with local authorities for approval of buildings’ systems and getting the building completion certificate and operation permit before closing.

PROFESSIONAL EXPERIENCE

(Jul 2014 – Present)

KEO INTERNATIONAL CONSULTANTS – Qatar,

Working as MEP Site Manager in PM/CM Division of the following projects Executed in Qatar: SIDRA MEDICAL & RESEARCH CENTER 2014: Site construction management for the medical city hospitals and clinics, staff housing, admin buildings with total capacity of 550 beds) Doha Qatar. ”Health care” BURJ MARINA TOWER Part time: Office building of (B+G+5P+37 floors) with 215m height and 115,000sq m, Lusail City. ”Commercial”

MALL of QATAR – 2015 2017: The biggest mall in Qatar of plot area of 200,000 m2 and built up area of 490,000sq m.

”Retail ”

QP DISTRICT – 2017 2018: The final T&C of QP HQ buildings with its Datacenter, DCP and 75 MW HV/MV substation over 7 hectares plot are and 540,000 sqm built up area (common 3Bs+G+P1 and 9 towers office buildings varies between 18 47 storeys and 1 Hotel). ”Commercial”

(Feb 2011– Jun2014)

SAUDI BIN LADEN GROUP – KSA

Working as Senior MEP Engineer with following duties for both of Electromechanical system: Reviewing design tender docs with our designer according to standards and Engineer specs.

Preparing shop dwgs, Combined coordinated E&M dwgs, Method Statements, Material submittals, RFI for all MEP systems.

Preparing installation work schedules weekly & monthly with other planning and other disciplines for controlling the schedule as per project program baseline.

Conduct procurement with suppliers and specialized sub contractors and control their scope as per project scope baseline.

Supervising daily site activities of installation and inspection of E&M systems.

Preparing the installation progress reports to monitor the project progress to the program.

Cost Estimation for Change requests and control project cost with Sub contractors within the budget.

Testing and commissioning all MEP systems with the Engineer and clearing snag list.

Preparing the project Closure report with all handover documents and project filing to the PMO. KING ABDULLAH FIANACIAL SISTRICT PACK 2 2011 2013: consists of six midrise Mixed use buildings up to 21 storeys with its basements and utilities rooms with 186,000 sqm built up area. ”Commercial - Riyadh” KING FAISAL SPECIALIST HOSPITAL 2014: with capacity of 500 bed, outpatients’ clinics and utilities with built up area of 260,000 sq m. ”Health care - Jeddah ”

(Oct 2008– Jan2011)

OBAYASHI –KAJIMA – YAPI MERKEZI JV Of Dubai Metro Dubai Working as Former MEP Engineer with the main EPC contractor of DUBAI METRO PROJECT which Consists of 2 lines (Red, Green) 49 elevated and underground stations with following duties:

Reviewing design tender docs with the design Consultant “ATKINS” according to standards and Project specs.

Preparing materials submittals, shop dwgs, combined coordination E&M dwgs, method Statements, ITRs, RFIs of all MEP systems.

Preparing installation work schedules weekly & monthly as per project program and site coordination with other stakeholders.

Attending all coordination/technical/progress meetings with concerned stakeholders (Authorities, the Project Engineer, JV Partner “Rail Contractor”, Sub Contractors).

Ensuring the work progress in the qualified procedures to meet the quality control plans and Client satisfactory.

Controlling the project schedule and budget in my scope area with sub contractors as per project scope and schedule baselines.

Performing Cost Estimation of variation orders and control project cost with Sub contractors.

Preparing the monthly progress report incorporating all necessary information in dashboard with main milestones situation in regards to project program.

Participating in preparing the project monthly invoice with the QS, Contracts team.

Coordination with daily site activities of installation and inspection of E&M systems.

Preparing Method statements of T&C of all MEP systems and witnessing the test with the Engineer.

Clearing the project snag list to achieve the project deliverables successfully.

Performing the project closing of the project to the Operator with all As built dwgs, manuals, warranty certificates.

(Aug 2004– Sep2008)

SIEMENS EGYPT – Buildings Divsion

Working as Electrical Engineer for Turnkey MEP works with following duties:

Reviewing design tender and preparing detailed working dwgs, Calcs, Site MEP coordinated dwgs

Preparing installation weekly & monthly schedules according to site conditions and project planning

Supervising and handling installation of site daily activities for all elec systems power & L.C

Raising necessary RFIs and variation requests to consultants for approval

Handling site inspection with consultants for all Elec & L.c systems according to ITPs Arabi Bank Gomhoria Branch – 2004 2005: Installation of all Electrical & ELV systems with built up area of 8,200sq m.”Commercial - Cairo”

DANDY MEGA MALL CARREFOUR – 2005 2006: Installation of all Electrical & ELV systems with built up area of 45,000sq m.”Commercial - Giza”

MINA HOUSE OBEROI – 2006 2007: installation with full renovation of all Electrical & ELV systems of 180 room 5* hotel in Cairo – Egypt “HOSPITALITY”

HSBC SMART VILLAGE – 2008: installation of all Electrical & ELV systems in B+G+4 floors and built up area of 17,000 sq m “Administrative”

COURSES

PMP training course in EEA “ Egyptian Engineers Association” 36 hrs in Riyadh KSA. LEED trend and technology in future construction field workshop 12 hrs in Riyadh KSA. English Conversation Course 108 hours of conversation course in Cairo – Egypt. Ecodial training workshop – 24 hrs in Cairo – Egypt and Riyadh – KSA. Docwin training workshop – 15 hrs in Riyadh – KSA, 10 hours in Qatar. Dialux training workshop – 10 hrs in Cairo – Egypt.



Contact this candidate