Post Job Free

Resume

Sign in

Landscape Architect / Project Engineer

Location:
Al Ain, Abu Dhabi Emirate, United Arab Emirates
Salary:
15000
Posted:
June 28, 2018

Contact this candidate

Resume:

EDUCATION

B.Sc. in Agricultural Engineering

NWFP University of Engineering & Technology Peshawar Pakistan

REGISTRATIONS / CERTIFICATIONS

Pakistan Engineering Council of Engineers 1989.

UAE Equivalent Certificates 1999.

COMPUTER SKILLS

Primavera planning (P6).

MS office 2003, 2007.

AutoCAD.

Photo Shop.

PQP (Estidama) & MS Project.

Prepare Irrigation, Landscape and Infrastructure Design and (BOQ).

MS- Office, MS Excel, Power point and Usage of Internet.

LANGUAGE

English, Arabic, Urdu, and Hindi (Read, Write and Speak.

E-mail:

m.lele_2020@ hotmail.com

m.qasim_4@ yahoo.com.

DATE OF BIRTH

29 August 1965

CURRICULAM VITAE

Qasim Hassan Mohammad Hashim

MOBILE +971********* m.lele_2020@ hotmail.com m.qasim_4@ yahoo.com

Position: Apply for Landscape Architect.

EXPERIENCE PROFILE

(Infrastructure/civil works /Road /Pipeline/Utilities/Wastewater/Electromechanical /

Irrigation /Storm Water/Sewerage/Potable Water/Landscape/Agriculture)

I have more than 24Years experience out of this 18 year in UAE, in the field of Design and Construction & Supervising of Infrastructure works to achieve and maintain required operation and maintenance, construction accordance with the Contract Documents. I worked on many infrastructure projects including this entire mentioned field. (Landscaping, Irrigation, civil works, Utilities, Wastewater, Electromechanical, Storm Water, Sewerage, Potable Water, Agriculture and water distribution projects and Pipeline Network System).

I have extensive experience with in all related activities including all infrastructure project. Review Contractor's submissions, Provide all necessary site direction and site instructions, Prepare progress report, Supervise site inspection staff, Supervising the day to day activities, chairing weekly meetings, following the design review, supervising the review and approval of the materials and shop drawings, preparing progress reports, addressing all enquiries by the contractor.

Develop conceptual soft and hard landscape designs independently from which detailed design drawings and technical specifications are prepared. Specifications of work, cost estimates and time schedules. Responsible to implement the project quality plan and quality procedures and productivity related to all site irrigation works in accordance with program of work on construction site.

Provides technical guidance to CAD designer/drafters and technical staff. Provides regular reports and presentations to Senior Management and Client Personnel as they needed.

Design of all irrigation system and prepare Automatic irrigation system and supervise the installation of Drip line, pop-up spray sprinkler, Bubbler irrigation system, experience in the field of agricultural extension, Good Agricultural Practices, prepare extension messages for farm workers.

Prepare tender specification and make tender Estimation & calculation (B.O.Q) Project management preparation of Irrigation, Landscape and infrastructure project.

REEM AL BAWADI Landscaping Contracting Company AL AIN UAE

August 2016 up to date.

Project: Infrastructure, Landscape and Irrigation.

Project Role: Design Engineer Landscaping / Project Engineer Infrastructure.

Prepared technical data for the work as given in the contract documents.

Monitor daily activities on site and supervise also.

Responsible for overall field Supervision and construction activities of earthworks, sub-grade, sub-base etc.

Attend daily and weekly meetings to review project status.

Prepares all necessary shop drawings, submittals etc prepares all irrigation material orders and ensures all material deliveries are on schedule.

Prepared specification and (B.O.Q) for the project.

DEWAN ARCHITECT ENGINEERA DUBAI UAE

October 2015 up to July 2016.

Project: LAPITA HOTEL - 4008 and REVER PARK - 4007 PROJECT (RD&E)

Project Role: LANDSCAPE ARCHITECT / PROJECT LANDSCAPE ARCHITECT.

Checked contractor shop drawing as per IFC drawing for approval.

Checked material submittal as per specification.

Checked technical submittal as per contract specification.

Review shop drawing as per IFC drawing of all infrastructure activates.

Checked Method statement as per approved methodology.

Closing the site issues RFI.

Closing the site issues and MS, Coordinate as per the approved shop drawing.

Checked WIR as per the contract document and approved shop Drawing.

Monitor daily activities on site and supervise properly. Establishes internal weekly meetings to review project status. Prepares all necessary shop drawings and technical submittals.

Prepared daily site activities report, site instruction report and all correspondence letters and submit to the concerned Sr. Resident Engineer on site office. Monthly meeting with client and weekly meeting with contractor regarding to discuss site progress and problem. Monitor all site staff. Attend weekly meeting of safety regarding different safety Activity.

Establishes internal daily meetings to review project status with contractor.

Establishes internal daily, weekly meetings to review project status.

I am responsible to checked soft landscape, hardscape and irrigation design drawing and prepared shop drawing, all material submittal, technical submittal etc. (of sewerage, gully, manhole, paving work, cycle tracks, footpaths, walkways, Landscape & Irrigation works, Landscape lighting, Handicap, Signage, water feature, Shad of car parking, BBQ, & natural wade stream, fountain, hardscape and play equipments etc full package of infrastructure).

Project: DPR (LAPITA HOTEL and REVER PARK(RD&E)DUBAI) UAE

Al DHABI LLC Contracting Company Abu Dhabi UAE

October 2014 up to September 2015.

Project: Infrastructure, Civil, Mechanical, Landscape and Irrigation.

Project Role: Senior Technical Engineer Infrastructure/Technical Manager Infrastructure.

Coordination of the technical site construction detail,

Coordinate According to the shop drawing.

Closing the site issues, and discus all NCR, SOR, TS, WIR, MIR.

Closing the site issues RFI and MS.

Manage all team to Monitor daily activities on site and supervise.

Checked WIR according to the contract document and approved shop drawing.

I am involves leading a large site supervision team in Abu Dhabi, from site inception to completion of the project which involve cycle tracks, road works, footpaths, walkways, Landscape & Irrigation works, Landscape lighting, Handicap, Signage, water feature, Shad of car parking, BBQ, & natural wade stream etc.

In order to achieve durable road sub-grade should be strong.

Sub-grade is provided by digging up the sub-soil and the level of the sub-grade and the total thickness of the pavement from the finished level of the road pavement, road prepared properly as per contract specification.

Preparation of sub-grade, Preparation of sub-base, Preparation of base.

Preparation of wearing course, Preparation of shoulders, Opening to traffic.

Design irrigation and Landscape project and prepared AS BUILT Drawings.

Attend daily and weekly meetings to review project status.

Prepares all necessary shop drawings and technical submittals.

Project: MUSHRIF CENTRAL PARK Abu Dhabi UAE

BARARI LLC Company Abu Dhabi UAE

April 2013 up-September 2014.

Project: Infrastructure, Forest, Landscape and Irrigation.

Project Role: Infrastructure Site Supervision Manager

Prepared technical data for the work as given in the contract documents. Coordination of the technical designs and their practical site construction detail, according to the design drawing.

Closing all the RFI, coordinate with site team, to close the site issues, NCR, SOR,TS,SDS,WIR,MIR,RFI and MS.

Review and approve sub contractors shop drawings as per IFC drawings and closed RFI. Manage all team to update all the drawings as per the site condition.

Monitor daily activities on site and supervise also. Checked sub-contractor WIR according to the contract document and approved shop drawings. Establishes internal weekly meetings to review project status.

Responsible for overall field Supervision and construction activities of earthworks, sub-grade, sub-base, concrete and asphalt, sewerage, storm water drainages, irrigation works, Landscaping works, potable water kerb stones, crush barriers, road signs, pavement marking and protection of existing services.

Supervise Well maintenance and cleaning activity on monthly basis and coordinate with related technical staff in weekly meeting.

Supervising the day to day activities, weekly meetings, supervising the review and approval of the materials and shop drawings, preparing progress reports, addressing all enquiries by the contractor, Lead a team of civil, mechanical, electrical inspectors, land surveyors, quantity surveyor and document controllers.

Coordination of the technical designs and their practical site construction detail, according to the design. The existing pumping station will be demolished and a new pumping station will be built for better irrigation water supply.

Project: Landscape Al Rouda Palace Extension project SHEIWIABA Area AL AIN UAE

Consultant Dorsch Holding GmbH DC Abu Dhabi UAE.

July 2010 to March 2013 in Dorsch Grupp.

Project: Construction of Infrastructure and Operation & . Maintenance (Infrastructure, Landscape, Sewerage, Wastewater and Irrigation Project) in YAS ISLAND Abu Dhabi & Dubai Road

Project Role: Resident Engineer (RE) (Infrastructure, Landscape and Irrigation)

Responsible for overall field construction supervision of the contractor’s works, coordination and documentation and PRFD requirements and standards.

Ensure that the contractor’s works are monitored and controlled in accordance with design drawing, specifications and contract documents. Supervise site inspection staff and surveyors and review their daily reports. Monitor assigned staff and implement on site procedures to assist them performing their work efficiently, give final approval to works and arrange handover.

Review shop drawing as per IFC drawing of all infrastructure activates.

Prepared technical data for the work as given in the contract documents and

Clearance between existing services and pipelines to be constructed shall be in accordance with the regulation of the respective Authority. Prepared the installation of GRP pipes in various sizes for drain pipe lines. Checked all contractor activity during construction, Excavation of pipe line, trenches, laying gravel, laying artificial turf, Excavation of tree pits, laying pipe and ducts and leveling and compaction for artificial turf according to the approved Design drawing (IFC drawing)and specification.

Checked contractor WIR according to the approved shop drawing and contract document by my site staff. Checked all contractor submittals before started the site work properly and verified by contractor the existing irrigation demand and verified shop drawing with dimension, Checked all civil works, MEP work, detail of main pipe line, lateral pipes line, typical connection, wiring diagram including conduits pull boxes, sizing and calculation and details for Drip line, Bubbler & Sprinkler Irrigation system.

Checked and prepared HDPE pipe installation by automatic BUTT FUSION MACHINE & backfilling with soft sandy soil free of Lumps. Excellent skills in site supervision, coordination and execution of the project. Completed Dorsch Group Consultant basic HSE courses and workshops. Ability of working independently as well as team member. Supervision of soft, hard Landscaping and Irrigation including other services identification, trial trenches formations, and snag list preparation. Artificial turf and finishing work supervision irrigation, F.fighting tanks. Reviewing irrigation, civil, Landscape shop drawings to insure its compliance with IFC design drawing, reviewing material, document submittal to ensure execution of work as per specification, manufacturer recommendations.

Senior Team Leader to manage a team to response on daily bases to the site issues, assist in site inspection, closing all the RFI, coordinate with site team, to close the site issues, coordinate with other design team to close the RFI, review and approve sub contractors shop drawings and RFI. Manage his team to update all the drawings as per the site condition. Monitor daily activities on site.

Monitoring the realization and inspecting the construction of landscape designs to ensure compliance with plans, specifications of work, cost estimates and time schedules. Provides input to performance reviews and develop plans for subordinates. Establishes internal weekly meetings to review project status and formulate action items.

Responsible for overall field Supervision and construction activities of earthworks, concrete, sewerage, storm water drainages, irrigation works, Landscaping works, pavement marking and protection of existing services.

Project: Landscape Interchange and Free WayYAS ISLAND Abu Dhabi & Dubai Road.

IMECO LLC Company Abu Dhabi UAE

January 2007 to June 2010 in IMECO LLC.

Project: Operation and Maintenance Landscape, Irrigation and

Infrastructure Project.

Project Role: Senior Project Engineer.

Supervising the site activities of Infrastructure (Sewerage & Drainage Network System Irrigation, Landscape and potable Water) to achieve and maintain required construction, operation and maintenance in accordance with the contract documents (approved shop drawings and specifications).

Innovative techniques for master planning and soft and hard landscape architectural design for residential places. Principles and practices of landscape architecture, including knowledge of plant materials and planting design, develop conceptual soft and hard landscape designs independently from which detailed design drawings and prepared technical specifications of work, cost

Estimates and time schedules.

Responsible to implement the project quality plan and quality procedures and productivity related to all site landscape, irrigation and infrastructure works in accordance with program of work on construction site. Provides regular reports and presentations to Senior Management and Client as they needed.

Provides technical guidance to CAD Designer, Drafters, and lower-level Engineers working on the same project. Prepares and reviews of irrigation design system and calculate hydraulic calculation and head loose for the Irrigation System.

Prepares all necessary shop drawings, submittals etc prepares all irrigation material orders and ensures all material deliveries are on schedule.

Prepared by (CMMS) daily work report and daily progress report. Attend weekly meeting of safety regarding different safety activity. Day-to-day management of the consultant reporting to the project Manager and other senior operations Manager. Prepare Asset survey of irrigation and Landscaping Civil, electromechanical project.

Supervise site activates, well maintenance, well cleaning, and use well water for irrigation purposes.

Well maintenance activates and cleaning schedule coordinates with technical staff on daily basis.

HDPE potable water pipe line installed and welded by BUTT FUSION procedure. Prepared and Installation of this project in Transco Marfa Consultant Linde Engineering Middle East L.L.C and client Elixier-II contracting IMECO construction of Nitrogen Plant. To guide the contractor staff regarding practical O&M matters and principles of plant protection. Observe site safety measures and other O&M operations.

To advice the contractor staff engaged in plant protection section to use different methods [chemical, biological and mechanical] against insect attack and diseases infestation. Identification and treatment of insect pest and pest control of date palms and fruits trees.

Knowledge of the application of Good Agricultural Practices. Ability to prepare extension messages of organic and Inorganic fertilizers for farm workers.

Use of pesticides and insecticides, nematocides with safety measures and principles. Transplantation and maintenance of date palms Identification of pest and diseases suggestions for treatment.

Project: Operation and Maintenance Landscape, Irrigation and Infrastructure Project in Western Region Abu Dhabi.

Al Ain Municipality (Agricultural Department Al Ain) UAE

February 1998 to December 2006.

Project: Landscape, Irrigation and Infrastructure Project.

Project Role: Irrigation Design Engineer.

Design of pop-up spray sprinkler irrigation system. Design of Drip line, Bubbler irrigation system, and install automatic irrigation satellite system.

Design and prepare Automatic irrigation system in different Location to install solenoid valve for Automatic irrigation System. Design and select BOOSTER PUMP for the design area.

Calculate hydraulic calculation and head looses and discharge for the required Irrigation system. Design of Agriculture Farms for irrigation (Drip line, Bubbler irrigation System and Sprinkler irrigation system).

Design of Riser sprinkler irrigation system. (For Jat / Rodhas). Supervise the installation of pipe lines for irrigation purposes. Supervise the connection of DUCTILE IRON pipelines and fitting. Supervise the connection of GRP pipelines and fitting. Supervise the connection of pipelines from water tank to

Agriculture Farms, the Connection of pipe lines from well to water tank.

Prepare tender specification for major pipe lines & local Agriculture farms. Prepare and make tender Estimation & calculation for major Pipe lines and local agriculture farms.

Prepare Landscape Design, Estimation (B.O.Q), calculation and Specification. Knowledge and practical work experience in the field of Agricultural extension and farmer training and development issues. Knowledge of the application of Good Agricultural Practices.

Extensive knowledge of master planning, design and documentation of water supply and irrigation system in arid and tropical climates. Detail design of IRRIGATION SYSTEM for commercial places, Parks and villas.

Project: JAHLI Park & Town Center Landscape and Irrigation project Al Ain City UAE

Agriculture Department NWFP Peshawar Pakistan On Farm water Management.

August 1993 to September 1997.

Project: Water Management and Irrigation Channel Project.

Project Role: Sub-Divisional Officer/Water Management Officer.

Preparation of contract drawings, specifications, and other materials suitable for procurement and construction purposes. Review proposed irrigation systems and materials for local compliance, quality and suitability to local conditions. Understands all related codes and their application to the project; and manages the interface with local agencies to coordinate design standards usage and monthly approvals’ process.

Designing of water courses for agricultural land for irrigation water. Designing of water channels for irrigation purposes. Preparation of Land leveling and prepared Estimation. Design Landscape plot and make Calculation for Landscape project.

Prepared (B.O.Q) for all Landscape & Irrigation works. Prepared specification of Irrigation and Landscape project. Practical work experience in the field of agricultural extension and farmer training and development relationships.

Knowledge of the application of Good Agricultural Practices. Ability to prepare extension messages for farm workers, and farm owners and other concerned training and program on site. Manage office work, daily report, lead Forman and supervisor on site. Use of pesticides and insecticides for deferent plants infection.



Contact this candidate