CURRICULUM VITAE

PERSONAL DATA

Name : Raniel B. Madelo

Position : Piping Supervisor

Date of Birth : November 20,1965

Place of Birth : San Jose Medina Misamis Oriental

Civil Status : Married

Sex : Male

Languages Spoken : English and Tagalog

Mobile Phone : +639********* / +639*********

E-mail Address : *******@*****.***

WORK EXPERIENCES:

Company : DAELIM-PETROFAC JOINT VENTURES

Project : SOHAR REFINERY IMPROVEMENT PROJECT

Address : Falaj Al-Qabail P.O. Box 537, 322 Sohar Sultamate Of Oman

Position : Piping Supervisor

Date : May 14,2016 – March 30, 2017

Proponent : Oman Oil Refineries & Petroleum Industries Company (ORPIC)

Reason for leaving : Project Completion

SCOPE OF WORK

Prepare daily reports of work progress and manpower utilization.

Prepare weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints and the remaining work front with the material available.

Co-coordinate with the sub contractors to achieve the targets and schedule set by the planning.

Conduct the safety walk through in the site in co-ordination with the safety department on weekly basis.

Supervision of all piping works and ensures safety and quality standards of all client.

Inspection and approval of all the QA/QC submittals of the subcontractor.

To study the isometric drawing received from the clients and to identify the pipe lines and carry out the inspection work.

Check flow direction arrows on valves: verify that they are properly identified and valves are installed in accordance with the piping drawings and the pipe support details.

Monitoring the QA/QC Documentation of the subcontractors and ensure that all activities are incorporated to their system on daily basis and can be traced according to our requirements.

Line check to verify the use of correct material fittings, punch list for incomplete works, check and closing after the work is done.

Issue the work permits ensuring SHE requirements.

Company : DAELIM SAUDI ARABIA CO. LTD.

Project : Saudi Elastomer Project

Address : AL Jubail Kingdom of Saudi Arabia

Position : Piping Supervisor

Date : May 19,2014 – May 19,2015

Proponent : AL Jubail Petrochemical Co.(KEMYA)

Reason for leaving : Project Completion

SCOPE OF WORK

Prepare all necessary documents needed in construction works

Praparation of underground piping

Praparing test packages for gravity test and hyro test

Line checking completed under ground piping

Supervise of sub constructors

Company : DAELIM SAUDI ARABIA CO. LTD.

Project : (YASREF ) Yanbu Aramco Sinopec Refining Co.

Address : Yanbu City, Kingdom Of Saudi Arabia

Position : Piping Supervisor

Date : May 31,2013 – March 31,2014

Proponent : Aramco

Reason for leaving : Project Completion

SCOPE OF WORK :

Prepare all necessary documents needed in construction works

Supervise all the installation of all types of piping works

Inspection of all pipe line completion

Company : DAELIM SAUDI ARABIA CO. LTD.

Project : (JERP) Jubail Export Refinery Project 2B

Address : Jubail, Industrial City

Position : Piping Supervisor

Date : February 19, 2011 –May 31,2013

Proponent (SATORP) Saudi Aramco Total Refinery &

Petrochemical Company

Reason for leaving : Project Completion

SCOPE OF WORK :

Prepare all necessary documents needed in construction works

Prepare test package for line checking

Coordination with sub constractors

Inspection of pipe line completion

Company : CHIYODA TECHNIP JOINT VENTURE

Project : Qatar gas 3 & 4 LNG Onshore Projects

Address : Doha, Qatar

Position : Piping Supervisor

Date : April 26, 2009 - March 30, 2010

Proponent : Qatar Gas / ConocoPhillips / Shell (QCS)

Reason for leaving : Project Completion

SCOPE OF WORK :

Prepare all necessary documents needed in construction works.

Line checking and punch clearing test packages.

Check test pack piping system equipped with vent at highest point and

drain at lowest points.

Confirm flange alignment, parallelism bolt torquing and tensioning.

Confirm all lines installed are vertical / level / slope as per iso

Installation of correct permanent gaskets confirmed.

Fabricate & install 90 tones of pipe supports.

NDT Inspection

Hydrotesting

Understanding P&ID

Company : TOYO ENGINEERING CORP.

Project : Yanbu National Petrochemical Company (YANSAB)

Ethylene Oxide / Ethylene Glycol project.

Address : Yanbu, Saudi Arabia

Position : Piping Supervisor

Date : July 04,2007 – January 31, 2009

Proponent : Foster wheler

Reason for leaving : Project Completion

SCOPE OF WORK:

Prepare all necessary documents needed in supervising construction works.

These includes isometric drawings, piping plot plan.

Supervise the installation of all types of piping works.

Prepare test package for line checking.

Monitor daily activities on site and coordinate with design engineer any changes needed in the working drawing due to actual on site. prepare FRI if required.

Company : TOYO ENGINEERING CORP.

Project : South Pars Gas Field Development Phase 6, 7 & 8

Address : P.O. Box 75391-193, Assluyeh, Busher Province, Iran

Position : Piping Supervisor

Date : December 17, 2005 – June 02,2007

Reason for leaving : Project Completion

SCOPE OF WORK:

Supervises the Hydrostatic and Pneumatic test of various pipes

Line checking and Punch clearing test packages

Coordinates with the construction, QA/QC and pre-commissioning groups

Company : EXTENDED STEEL FE INC.

Project : Bulacan Paper Mill

Address : Bo. Osorio, Trece Martires City

Position : Piping Supervisor

Date : March 18, 2005 – November 20, 2005

Reason for leaving : Project Completion

SCOPE OF WORK:

Supervises the fit-ups and completion of various sizes of pipes for steam line

Inspection during erection and transporting of pipe from finish mill to SILO

Company : EEI CORPORATION

Project : Kalayaan Pump Storage Power Plant II

Address : CBK, Kalayaan, Laguna

Position : Piping Inspector

Proponent : IMPSA

Date : October 1, 2003 to August 29, 2004

Reason for Leaving : Project Completion

SCOPE OF WORK:

Inspection of all various sizes of pipes for dewatering system, oil and air lines.

Inspection during Alignment of pumps drive motors at waste water treatment

Inspection during Erection of 4 unit pressurized tank for lube oil supply.

Company : TOYO ENGINEERING CORP.

Project : Petrokemya Polyethylene Project

Address : Kingdom of Saudi Arabia

Position : Piping Supervisor

Proponent : PKPE

Date : November 15, 2002 to September 14, 2003

Reason for Leaving : Project Completion

SCOPE OF WORK:

Supervise Inspection of Piping Line Completion

Checking of Latest Isometric, Supports and P& ID

QC Coordination during Piping Pressurizing

Coordination with Construction Team.

Company : EEI CORPORATION

Project : San Roque Multipurpose Project

Address : San Roque San Manuel, Pangasinan

Position : Mechanical Foreman

Proponent : ABB-ALSTOM

Date : February 5, 2001 to August 30, 2002

Reason for Leaving : Project Completion

SCOPE OF WORK:

Erection /Assembly 6 units radial gate

Erection of trunion base arm 12 units

Coordination of pipes for tellus oil, for cervomotors 12 units.

Company : EEI CORPORATION

Project : CME-PEG Cement Plant Project

Address : Bo. Bigte, Norzagaray, Bulacan

Position : Mechanical Foreman

Date : July 25, 2000 to December 22, 2000

Reason for leaving : Project Completion

SCOPE OF WORK:

Lay-out, cutting and fit-up all cement plant accessories.

Erection / installation of conveyor briges.

Company : EEI CORPORATION

Project : RCBC Plaza

Address : Ayala Ave., Makati City

Position : Mechanical Fitter

Proponent : Mitsubishi Heavy Industries (MHI)

Date : November 4, 1999 to July 21, 2000

Reason for Leaving : Project Completion

SCOPE OF WORK:

Alignment of 7 units 2000 kW diesel generator

Alignment/ installation of mufflers or genset

Erection/ installation of expansion join for mufflers of diesel generator

Run testing, commissioning

Fet-up various size of pipe for steam, chemical and air lines.

Start-up commissioning work

Company : EEI CORPORATION

Address : Sta. Maria Bauan, Batangas City

Position : Mechanical Fitter

Project : Fabrication Shop

Date : February 22, 1997 to March 12, 1999

Reason for leaving : Project Completion

SCOPE OF WORK:

Assembly of fit-up of any kind of pressurized tank or non pressured tank.

HIGHEST EDUCATIONAL ATTAINMENT

College : Cagayan Capitol College

Course : Bachelor of Science in Mechanical Engineer

Date Graduated : March 1985 / Under board

SEMINARS ATTENDED

Total Quality Management March 1999

(EEI Corporation)

PTW Training course August 2009

PMC Training course September 2009



Contact this candidate