Robert Flinn
ac4li2@r.postjobfree.com
LinkedIn h ttps://www.linkedin.com/in/rob-flinn-323a68157
Work History
Industrial Monitoring Technician
City of Lima 2005 - PRESENT
● Independently collect industrial samples
● Managing schedule and equipment, from 30+ customers i.e. PepsiCo, Joint Systems Manufacturing Center, Proctor & Gamble and Ford Motor Company
● Analyze samples for strength of pollutants leads to a billing number for the industry.
● Testing include pH, Oxygen depletion (both BOD & COD), solids & ammonia concentration.
● Collaborated with the Pretreatment Supervisor in management of the Pretreatment Program.
● Trained the most recent supervisor in pretreatment collection.
● Run daily tests on in-plant samples and record results in our OP10 plant computer system.
● Collaborate with plant management on digester feed rate control.
● Completed volatile acid & alkalinity tests on digester samples.
● Job shadowed the Operator in plant operation and in the use of the computer control system to maintain total plant performance.
● Assist with overflow sample collection of the sewer system at request of the Off-Shift Operator which monitors the sewer systems effect on the environment.
● Current OEPA class 3 Wastewater Operator’s License. Water treatment operator 2005-2006
CTL Engineering Field Technician
April 2004-Dec 2005
● I began in the lab testing concrete and mortar specimens, from many different construction sites, for ultimate strength.
● Soil specimens were tested for characteristics, the results used by engineers for building advisement.
● Moved to field technician, making the concrete and mortar specimens at construction sites.
● Performed concrete slump tests.
● Completed soil compaction tests granting construction personnel permission to add the next layer of soil.
● Verification of re-bar size and configuration based off of construction blueprints. Amcast Industrial X-ray Technician
March 1997-February 2003
● Mold casting tech of aluminum automotive suspension parts.
● Melt furnace operator and delivery.
● Batch heat treating and quenching the parts to harden them in 6 different furnaces.
● XRay of parts to ensure voids were small enough to be passed according to the quality control plan.
● Xray electrical connections were assured.
● Xray view qualities were checked with a guage.
Production Associate Honda of America Adecco October 1995-February 1997
● Delivery of parts from semis to most sections of Engine assembly line 3.
● Tow motor (licensed, minor training).
● Temporary 14 month contract that was extended by Honda. ManBeck Nurseries
June 1994-October 1995
● Manual tree and plant trimming for large wholesale nursery.
● Assisted in digging and root ball development of various plants for both on-site storage and off-site sale.
Nuclear Engineer DC Cook Plant
I&M Power AEP System
June 1987- August 1992
● Advisor to operations on reactor core adjustments.
● In 1989, I became Unit 1 nuclear engineering lead. During next 2 fuel cycles, Unit 1 attained record runs at full power.
● Performed core power density tests throughout core life and end of life power ramp down guidance.
● Engineering procedure development for startup and ramp up to full power.
● Coordinated with various other groups to meet safety and stay at power requirements.
● Coordinated storage of spent fuel during scheduled plant shutdown.
● Power plant generated 2,100 megawatts of electrical power. Education
1992-1993
University of Dayton Masters Engineering/Industrial Management (not completed) 1983-1987
University of Cincinnati Bachelors of Science Nuclear Engineering