CAREER SUMMARY:

Piping Engineer with an experience of 7+ years in Oil & Gas, Petrochemical Sector. Presently working with GS E & C India Pvt. Ltd. Good exposure to Piping design & Stress Analysis (using CAESAR II) of lines connected to Heat exchangers, Pressure vessels, Columns, Turbines, Pumps, Air Coolers, storage tanks, Rack Piping, etc. Handling project related activities and co-ordination with other disciplines. SELECTED ACHIEVEMENTS:

Awarded by “KAIZEN APPRECIATION” certificate during Inplant training At

“ASB INTERNATIONAL PVT.LTD.”

SOFTWARE EXPOSURE:

CAESAR-II 5.30, PDS, Navis works freedom 2013, AUTO CAD 2014, PRO-E, ANSYS, and PRIMAVERA, FE BEND, NOZZLE PRO.

PROFESSIONAL EXPERIENCE:

1) GS E&C Mumbai (Feb.2014 -Till date)

Project: LIWA PLASTICS INDUSTRIES COMPLEX (LPIC) - ORPIC -OMAN Size of Project:

After LPIC, plastics production will be increased by 1 million tonnes, giving Orpic a total of 1.4 million tonnes of polyethylene and polypropylene production by 2019.

Job Responsibilities:

Stress Analysis of critical lines connected to Turbine, Vessels, Columns, Vacuum Tower, Air Coolers, cod box, Flare lines & Rack Lines.

Design of pipe supports and Civil and structural loading calculation.

Calculations for -Flange leakage check, trunnion check, PSV force.

Stress analysis of gas pipelines connected to pig launcher& receivers.

Analysis of thermoplastic material 18” water transportation header by code ISO 14692.

Selection of anchor thrust blocks based on failure of pipeline in stresses.

Buoyancy calculations for buried pipe.

Piping, equipment and support modelling using PDS. Project: IRAQ KARBALA REFINERY PROJECT

Size of Project:

Engineering, procurement and construction works for the planned 140,000 barrels per day (bpd) refinery.

Job Responsibilities:

Stress Analysis of critical lines connected to Turbine, Pressure Vessels, Columns, Vaccum Tower, Pumps, Air Coolers, storage tanks, & Rack Lines using CAESAR-II.

Stress analysis of transfer lines in CDU plant.

Review and design of pipe supports.

Develop and maintains the critical line list.

Performed Trunnion Calculation, & PSV force calculation.

Interdepartmental coordination.

Civil loading calculation.

Familiar with ASME B 31.3, API 610, API 617, API 650, API 661, NEMA SM23. 2) UHDE India Pvt. Ltd. (May2013-Jan-2014)

Project: BAGFAS (Bandirma, Turkey)

Description of Project:

The project comprises a 1,195 ton-per-day plant for the production of nitric acid, which is then processed into either granulated calcium ammonium nitrate (CAN) fertilizer (2,000 tons per day) or ammonium nitrate (AN) fertilizer (1,550 tons per day).

Job Responsibilities:

Preparation of critical line list.

Done static analysis for lines connected to Turbines, Pumps, Storage Tanks, Columns, Heat exchangers and Pressure Vessels for occasional loads like

Wind, Seismic, and Snow.

Stress analysis of jacketed lines, Steam lines.

Flange Leakage Calculations.

Preparation of support load data.

Review and design of pipe supports.

Civil loading calculation.

3) Sistech Consultants (July-2012- April 2013)

Petrofac Engineering India Ltd. (On Deputation)

Project: EPC CPF PHASE-1 AT BADRA OIL FIELD

Client: GAZPROM NEFT

Description of Project:

The project consists of building and installation of a pump station, oil storage facilities, and oil metering station, and other required equipment to begin producing oil at Badra with daily production reaching 170,000 barrels.

Job Responsibilities:

Modeling and Stress analysis of piping connected to Pump, Heat exchanger, Colum, Pressure vessels, Tanks.

Modeling and Stress analysis of underground GRE lines.

Special support design Documentation of all of systems. Projects handled at Sistech

Project: PETROBRAS P-58 & P-62 Units (FPSO Project) Client: TECHNIP KT

Description of Project

The units will produce oil at the Norte do Parque das Baleias and Roncador fields, respectively, and will be moored in water depths ranging between 4,593 and 5,249 feet to peak oil production to reach 473,000 bopd.

Job Responsibilities:

Worked as a Piping Stress Engineer

Modelling and stress analysis of stress critical lines connected to equipments like pump, exchangers, Tank, vessels, columns, PSV lines

Documentation of all lines analyzed.

Project: EVONIK Me 5

Client: JACOBS Engineering

Description of Project

The project consists of engineering, procurement and construction management (EPCM) services for a new methionine production complex at Jurong Island, Singapore to produce 150,000 metric tons per annum of amino acid DL-methionine.

Job Responsibilities:

Worked as a Piping Stress Engineer

Modeling and Analysis Documentation of stress critical lines connected to equipments like pump, exchangers, Tank, vessels, columns, steam lines.

Documentation of all lines analyzed.

4) Pipetech consultants Pvt. Ltd. (August-2011 – June-2012) Project: WET FLARE PROJECT

Client: Petrokon

Description of Project:

The project consisted of flare lines and PSV lines. Job Responsibilities:

Worked as a Piping Stress Engineer

Modelling of lines connected to equipments pump, exchangers, Tank, vessels, columns, PSV lines as per Iso’s. And Documentation of all lines analyzed.

Preparation of CAESAR II Reports.

5) Das Offshore Engg. Pvt. Ltd. ( Nov. 2010 – July 2011) Project: SHP / SHG

Client: ONGC

Description of Project:

Supply, Erection and Commissioning of Piping Modifications at SHP/SHG/SI - 5/ II Platforms Transportation of free gas to SHG Platform on turnkey basis

Job Responsibilities:

Worked as Jr. Engineer in Projects Department.

Costing and Estimation of entire project for bidding.

Co-ordination with all departments for Finalizing MTO and deciding scope of the project.

Attending Bid and project queries meetings at ONGC and contractors. Worked as INPLANT TRAINEE for 6 months at “ASB INTERNATIONAL PVT.LTD” from Nov.2009 to April 2010 on

1) TOOL LIFE MONITORING

2) STANDARD TOOL LIST OF DEVELOPING PARTS

Has designed various projects for clients in AUTO-CAD & PRO-E Softwares. HOBBIES:

Trekking, Travelling, Playing Cricket, Football, Basketball, Kabaddi. ACADEMIC DETAILS:

PASSPORT DETAILS:

Nationality : India

Passport No. : J4318806

Birth Place : Dombivli, Dist: Thane

Date of Issue : 23-12-2010

Date of Expiry : 22-12-2020

I hereby assure that the information given above is correct and to the best of my knowledge.

Date: SWAPNIL SHANKAR PABALE

Examination School/College

Board

Year of

Passing

Marks

%

S.S.C.

R.V.Nerurkar

High school

Dombivli

Pune board Mumbai

division March - 2003 80.00 %

H.S.C.

R.V.Nerurkar

Jr.college

Dombivli

Pune board Mumbai

division Feb – 2005 73.83 %

B.E.(PRODUCTION)

Shivajirao S.

Jondhale college

of Engg.

Mumbai University

June - 2010 75.55 %

PIPING

ENGINEERING

Suvidya

Institute

Technology

Suvidya

Institute Technology October- 2010 1st CLASS

ME -MECHANICAL

(CAD/CAM &

ROBOTICS)

K.J. Somaiya

College Of

Engineering

Mumbai University

July - 2013 67.53%



Contact this candidate