PROFESSIONAL SUMMARY
SKILLS
WORK HISTORY
SHAWN
MEAGHER
*** ********* ****, **********, ** 27545 (C) 919-***-**** ac4h7s@r.postjobfree.com I have been involved in the Bridge Construction industry for the past 20 plus years. I thoroughly enjoy working in this field, with the only draw back that it is brutal on my body as a whole. I would like to stay in this type of work, but move on to a different role as a Transportation technician, or CEI. I will bring with me my years of Construction experiences to better your company.
Safety procedures knowledge
Works well independently
Basic math and measuring aptitude
Valid North Carolina driver\'s license
Capable of heavy lifting
Able to read Blueprints
Know how to shoot
grade
Aerial work platform certified
Level II
Certified Erosion and Sediment Control/Storm
water Site Manager
APRIL 1997-JANUARY 1999
Piledriver Balfour Beatty Construction Jacksonville, FL I was hired to work on the land crew installing over 120 concrete caissons. I was then trained to use a concrete pump similar to a pump truck so that we did not need to sub out that part of the installation process. As part of my responsibilities, I was trained on how to use ICE pile hammers, ICE vibratory hammers, CAT front end loaders, and 80\\' aerial basket lifts. Once we had completed the caissons that we could access, I was switched to the crew setting 25 ton precast column segments. Also, I worked on pouring 8 massive footers in the river, ranging from 900 yards to 1250 yards of concrete. I was injured on the job and could not continue with this line of work for a time. It was at this time that I moved to North Carolina, to be closer to my parents.
EDUCATION
JANUARY 1999-MAY 1999
Forklift Operator Body Shop Inc Wake Forest, NC Upon arriving in North Carolina, I was hired to drive a forklift to transfer the contents of an old warehouse to a new warehouse that the company had built. Completed daily forklift safety checklists.
Wrapped pallets in plastic wrap and attached merchandise tags. Maneuvered forklift safely in congested and confined areas. Loaded, transported and stacked materials.
JUNE 1999-CURRENT
Foreman, Bridge Construction Sanford Contractors Inc Sanford, NC I was hired as a Skilled laborer to work on The American Tobacco Trail in Durham, NC. Once that job was completed, I transferred to a different crew in Raleigh, NC. working on a bridge in east Raleigh to connect New Hope rd. to Jones Sausage rd. As a team member of that particular crew I was promoted to Lead Man in the spring of 2002. In Sept. of 2009 I was promoted to Foreman on a new crew. I have held that position since then.
Mixed porridge of catch basins and poured and sawed off concrete and asphalt. Consistently assumed additional responsibilities and worked extended hours to meet project deadlines.
Loaded and unloaded building materials used for construction. Operated equipment such as pile hammers and heavy equipment. I have worked on various projects over the 18 plus years at Sanford Contractors, such as A flyover bridge on the US-70 bypass. H-pile in each footer, with 72" columns and Hammer head caps. Also constructing the false work to support the 8\' steel girders. The 3 Bridges at exit 309 on I-40 for the US-70 Bypass. with massive concrete footers that had to be heated for 7 days to cure properly. 72" columns and hammer head caps. With rip rap slopes on one end and concrete slope protection on the other. Various bridge replacements projects as well as Design Build Projects. I have Driven steel H-pile, 20" concrete pile, and 18" and 20" galvanized steel pile over the years. Also have worked along side sub contracted companies to install concrete caissons when required as per the contract. I know how to read Blueprints, as well as shoot grade. 1990
GED:
Framingham High School, Framingham, MA