Resume

Sign in

Engineer Project

Location:
Richmond, Texas, United States
Salary:
100000 USD
Posted:
February 14, 2018

Contact this candidate

Profile:

Mechanical engineer with ** years of experience in Pipeline, Piping, Project management of Oil & Gas Projects and Industrial manufacturing.

Lead and operate as a part of a team of engineers and designers in carrying out Conceptual, Front End and detailed engineering work; responsible for all associated tasks such as Route Assessment, 3D Modelling(PDMS), Material selection, Preparing the specifications/ data sheets, Stress Analysis, Equipment layout. Piping layout, FEED, Coordination and providing all necessary technical information for procurement during detailed engineering and working within budgeted man hours.

Experience in using some international Codes & Standards like API, ASTM, ASME B31 (B31.3, B31.4, and B31.8), SARAMCO STD and familiar by 49 CFR 192& 195.

Experience:

09/2017-Till now JACOBS, KSA

Sr. Pipeline Engineer

07/2015-04/2017 Wood Group, KSA

Sr. Pipeline Engineer

Job Description:

●Overall administration of Pipeline Engineering group

●Ensure that all Piping / Pipeline Engineers work to project procedures, specifications and standards, good engineering practices and techniques, and any project-specific requirements

●Act as single point interface between Piping / Pipeline Group, project design and engineering services and oversee & review Piping / Pipeline work executed in other offices.

●Participate in local Hazard and Operability (HAZOP)

●Participate in key customer reviews and meetings as required

●Participate in value engineering and value improvement workshops with customer.

●Provide input to Piping Manager regarding Piping / Pipeline Engineering procedures and work practices as appropriate

●Develop close working relationships between all engineering group members, Project Managers, projects team and EPC staff to ensure a consistent approach and effective resolution of issues

●Participate in the Pipeline Route study during the project Front End Design.

●Reviewing the drawings prepared by the engineers (i.e. Plot Plan, General Arrangements, Isometrics, Alignment Sheets, Crossing Details (Open Cut, HDD, Thrust boring), Hydrostatic Diagrams, Pipeline Schematic Diagram, etc.)

●Preparing PDI (Population Density Index) Report, Class Location and block valve stations.

●Performing and reviewing the stress analysis.

●Reviewing the Calculations prepared by the engineers (i.e. Highway crossing, W. THK, Buoyancy calc., Elastic bend cal., Upheaval Buckling, Hot tap calc. etc.).

●Reviewing the Piping Specification, Valve Data Sheets, MTO, Material Requisitions and Vendor Drawings.

●Reviewing the 3D Model prepared by the designers and efficient in using PDMS

●Provide resolutions for the site queries raised by the EPC CONTRACTOR.

●Provide Man-hours estimation for the projects in proposal stage.

●Controlling the project budget by preparing the proper staffing plan, providing the project weekly progress and issuing the design change notice to the project manager.

●Maintaining the company Quality Procedure (Reviewing the Deliverables, Attending ABR and Package Check).

Projects

●Master Gas Loop-1 (EWG-2)- CAT

Project Brief: Detailed design for EWG-2 56”, 600#, 310 KM from KM-916 to EWPS#7 and from EWPS#11 to Yanbu with all associated facilities scrapers, Mainline Valve Stations and Burn Pits.

●Oily Water Disposal System-JGC

Project Brief: Conceptual and detailed design for 6” RTR Pipeline, 150#, 15KM from Al-Mu’ajiz Terminal (AMT) to Marafiq Pipeline.

●14” Fuel gas Pipeline- ARAMCO

Project Brief: Conceptual and detailed design for 14”, 600#, 1.5 KM from HUG-1 Pipeline to Hawiyah Gas Plant (HGP) with all associated facilities Scarper Launcher/ Receiver and Burn Pit.

02/2014 – 05/2015 JACOBS, KSA

Project Engineer

Job Description:

●Effectively coordinate with the client for the project requirements and clarify reviews, approvals, proposals, status and responses and maintain excellent relationship with client and parties involved.

●Prepare project proposals, staffing-hours and cost estimations.

●Manage subcontracts to vendors and other companies.

●Manage changes, identifying variations in a timely manner. Ensures close out of every punch item.

●Ensuring that work undertaken is in compliance with safety, quality and environment.

●Manage multidiscipline design project that included interdisciplinary coordination, information flow from client to disciplines, scope and change order management.

●Conduct ‘lessons learned’ presentations to management of selected projects.

●Planning, monitoring and reporting of project resources and finances.

●Prepare weekly and monthly reports, progress monitoring and updates.

●Ensure all design submissions are reviewed and responded to within set timescales.

Projects

●EWO (Engineering Work Order)- ARAMCO

Project Brief: A program of miscellaneous small and medium caps i.e. replacing of manual drain system by Automatic system at Riyadh Refinery, SIS Sheets for Riyadh Bulk Plant, Relocate Dhahran Jet A-1 Pipeline, etc.

06/2012 – 02/2014 JACOBS, KSA

Piping and Pipeline Lead Engineer

Projects

●Arabiyah Hasbah Onshore Facilities- SAIPEM

Project Brief: 4 Trunklines, 36”, 1500#, 30 KM parallel starting from Onshore to WGP (Wasit Gas Plant) including the associated scraper launchers and receivers.

●MPP (Maintain Potential Project)- ARAMCO

Project Brief: A program of miscellaneous small projects of Pipelines design, Scrapers Launchers, Receivers, Flowlines, Well Head piping and Tie-Ins.

●SP-2 Project- DPL

Project Brief: 2 Seawater P/Ls Supply and Return Line each line is 15 Km starts from YASREF to Yanbu Refinery and Butane P/L starts from Yanbu to Yasref Refinery.

●Upgrade Sulfur handling facility)- ARAMCO

Project Brief: Feed Engineering for extension of the existing sulfur handling facility at Berri Gas Plant including a new Boiler, Compressor, Pelletizer and Process pumps.

10/2011 – 05/2012 SCEC (Saudi Consolidated Engineering Company-Khatib& Alami)

Piping and Pipeline Design Engineer

Projects

●AH Crude Oil & Sales Gas- Petrojet

Project Brief: 2 Crude Oil Pipelines and Sales Gas P/L run parallel from launcher to receiver, associated Metering Skid and Filtration system.

●Shaybah NGL Interconnecting pipelines- FMQ

Project Brief: 12 Gas P/Ls run from various GOSPs to Shybah NGL with various lengths also, delivering lean gas to GSOP-2 and GOSP-4.

02/2008 – 09/2011 PETROJET

Piping and Pipeline engineer

Job Description:

●Preparing Plot Plan.

●Reviewing the Alignment sheets.

●Preparing 3D Model by using PDMS.

●Preparing General Arrangement drawings and Isometrics.

●Stress Analysis by using CEASER II.

●Preparing the Wall THK calculations, MTO and Data Sheets.

Projects

●EPC for 48” Hassi R’mel-Skikda-El Kala P/L (Lot1)- SONATRACH (Algeria)

Project Brief: 48” Gas Pipeline (Lot1) 270Km with 3 intermediate stations (PC1, PC2, PC3), 13 sectionalizing valve rooms.

●8” Agiba gas Pipeline from Meliha to Khalda Salam Station-Agiba

Project Brief: 13 Km Pipeline and all associated facilities (Launcher and Receiver)

●20” Entisar Elsareer Gas pipeline-Libya

Project Brief: 36” Gas Pipeline 187 Km with 5 intermediate sectionalizing valve rooms and 1 gas reduction station for providing Elsareer electrical station by Natural Gas

●JAD-N1X, 6" Kalbasha 1X and Kalbasha 2X trunk lines and Ras Kaney Flow lines - Khalda Petroleum Co.

Project Brief: 3 flow lines from the well head to the manifold at Tarek station

●Al Tube Station- ALTUBE

Project Brief: A tank farm contains 10 tanks, circulation pumps, shipping pumps, Loading pumps and Loading arms

●Sumed Phase 4 Storage Tanks- SUMED CO.

Project Brief: An extension for the existing station contains 6 tanks and shipping pumps.

02/2007 – 08/2008 PETROJET

Piping Material Procurement Engineer

Job Description:

●Preparing the specification for the required material.

●Preparing the MRQ (Material Requisition).

●Corresponding to the suppliers with the technical clarifications.

●Preparing Technical Bid Evaluation.

●Reviewing the Purchasing Order (P.O) and Performa Invoice.

●Reviewing the vendor print.

●Material Cost estimation for projects in proposal stage.

Projects

●APC Plant and Production Expansion Projects (Phase Two-Cold Crystallization Plant and Compaction Plant)- Arab Potash Company Ltd. - Jordan

●EPC for Dehydrator and Desalter vessels-GPC

●EPC for Strategic Gas Transmission Project (SGTP)-Qatar Petroleum – Qatar

●Description: Two new 36” Gas Pipeline from (Station V) in Ras Laffan to (Station S) in Masaieed with 6 block valve stations.

●EPC of Launcher and Receiver (Jordan)-Fajr Co.

●EPC of Tarek station utility network-Khalda Petroleum Co.

●EPC of the E-LAB project.

02-2005 to 02-2007 EASROC (Egyptian American Steel Rolling Co.)

Maintenance Engineer

Job Description:

●Working as Shift Engineer looking after all mechanical problems (Mechanical and utility) in the mill.

●Carrying out break down analysis and providing a solution.

●Executing all preventive jobs independently and break down jobs.

●Executing shut down jobs.

●Attending the daily meeting with the Maintenance GM to discuss the problems occurred during the shift.

EDUCATION & TRAINING

●Project Management Preparation (PRMG)

●ASME B31.8, 31.4 and 31.3

●Valve Sizing, Types & selection

●Advanced Caesar II

●PDMS Training

●Introduction to leadership and management skills

●Bachelors of Mech. Power Engineering-2004 (Grade: Good)-Ain Shams University

SOFTWARE SKILLS:

●PDMS

●SP3D (Fair)

●Caesar II

●AutoCAD (2D)

●Pipe Net

●Google Earth Pro.(Fair)

●ArcGIS(Fair)

●Civil 3D(Fair)

●MicroStation V8i(Fair)

PERSONAL

DATA

●E-Mail: ac4gx2@r.postjobfree.com:ac4gx2@r.postjobfree.com

●Languages: - Arabic (mother tongue)

-English (fluent writing & Reading)

●USA Work Permit: Eligible to work in USA (Green Card F32)



Contact this candidate