Resume

Sign in

Project Manager Construction

Location:
Minneapolis, Minnesota, 55438, United States
Salary:
140,000.00
Posted:
February 12, 2018

Contact this candidate

Daniel J. Caouette

***** ****** ****, ***********, ** 55438 (C) 612-***-**** ac4f13@r.postjobfree.com

ACCOMPLISHED ENGINEERING AND CONSTRUCTION PROJECT MANAGER

Effective organizer and problem solver with an established track record for on-time project scheduling. Proven ability to utilize Design, Engineering and Construction trades from contract negotiations to final closeout procedures. Successful with Change of Management protocols with outstanding strategic vision, leadership, communication and organizational skills. Positive and proactive approach to managing multiple trades and disciplines and have exceeded company goals and expectations.

CONSTRUCTION SITE REPRESENTATIVE

3M Cottage Grove Chemical facility, Cottage Grove, MN (June 2017 - Present)

Construction Site Representative in charge of building construction/maintenance for chemical process infrastructure equipment, building structures, road repair, waste water treatment facility, piping, associated process kettles as well as tank farm. Conduct daily coordination, scheduling and scoping in support of, building maintenance supervisors, design and chemical engineers, multiple contractors, security and 3M executive management for over 25 buildings and tank farm vessels.

CONSTRUCTION SUPERINTENDANT/PROJECT MANAGER

The Samuels Group, Wausau, WI (November 2016 – June 2017)

(Four Points Sheraton Hotel Construction Project Manager and Site Superintendent for a design-build renovation project for two hotel towers in Peoria, IL, consisting of a 6 story stack, and a 9 story stack with 323 guest suites, a water park, two banquet rooms, 1 ball room and common area, Restaurant, new 4000 amp switch gear replacement and hotel administrative offices, in charge of managing daily construction issues and coordinating construction trades, conducting weekly owners meeting as well as weekly progress meeting with trades, generating meeting minutes, buying out contracts, approving daily Work Tickets for T&M work, generating and submitting Change Order Requests to Ownership, issuing Change Orders to construction trades, updating project schedule as required.

CONSTRUCTION MANAGER

LVH Entertainment Systems, Hudson, WI (November 2015 – November 2016)

(Chatfield HS, Abilene HS, Pelican Rapids HS, Storm Lake Hs, Washington HS, Zimmerman HS, Royalton HS, Rogers HS – Budgets ranging from 1.5 million to 4 million ea.). Construction Project Manager, Electrical Controls PM and field installer in charge of managing and coordinating the entire design theatre rigging CD phase, material procurement, generating PO’s, facilitating shop drawing and product data sheets, organizing material shipments, coordinating multiple construction trades, A&E firm, Theatre Consultant and multiple specialty product vendors. Initiate RFI and Change Order processes, final punch list, end user training and O&M closeout document protocols for theatrical stage rigging, electrical lighting controls and AV projects located throughout the US.

CONSTRUCTION MANAGER

Vertical Limit, Wanamingo MN (October 2014 – November 2015)

Verizon- $6,000,000.00 budget - 4 Way RX Construction. Project manager in charge of wireless technology infrastructure and cell tower construction including placement of cell tower shelters, concrete foundations, antennas, radio frequency coaxial and fiber optics involving 350 tower sites in 10 States. Telecom provider clients range from AT&T, Verizon, T-Mobile and Sprint throughout the US.

CONSTRUCTION PROJECT MANAGER

Division 21 Inc., St. Paul, MN (December 2012-October 2014):

Veterans Administration- $10,000,000.00 budget - 4 level Parking Ramp. Project manager responsible for the construction of the 4 level, 570 stall, parking ramp construction project in Minneapolis, MN. Reroute existing 13.8 KVA redundant main power feed from main power plant building to hospital. Reroute underground chilled, potable and storm/sewer lines. Storm Water Management certified through the University of Minnesota certified and OSHA 30 accredited.

CHS-$4,000,000.00 budget - Liquid/Dry fertilizer facility- Mooreton, ND. Construction Project Manager In charge of budgeting and erection of a 48,500- square foot, 15,000 ton facility in conjunction with SMA, CHS Agricultural facilities and Van Sickle Engineering.

CONSTRUCTION MANAGER/OWNER/Carpenter

C&C General Contracting, Otsego, MN (February 2008-Dec 2012):

Owner/Manager and carpenter; Accountable to market, propose, manage and construct light commercial and residential construction projects. High percentage of client project awards based on customer needs detailed drawing packages and comprehensive project scope documentation. Provide direct labor for new and remodel construction projects.

PROJECT MANAGER

AMEC Industrial Americas, Minneapolis, MN (October 2002-February 2008):

Responsibl

3M-Budget $7,000.000.00 270 Pharmaceutical project Maplewood, MN -. Project manager In charge of 24 month, 15,000 square foot animal lab including quarantine rooms, grossing labs, Necropsy rooms, transgenic labs equipment washer room (clean and dirty), refrigerator room, pump room, welding room and a mezzanine to support a 25,000 CFM AHU.

Cargill- -$2,000,000.00 budget- Foam Testing Lab, Plymouth, MN. Project Manager responsible for demolition and construction of an 18,500 square foot research & development wet Laboratory and office Bio-Based polyol foam testing facility consisting of H3, TDI dispensing tank and distribution system (closed), liquid chemical storage rooms, Primary and secondary liquid containment pits, five wet labs with 100% make up air, 12, 9’-0’ bench top exhaust hoods and ovens, burning and cooling rooms, roof top mechanical room supporting 3, 14,000 lb. carbon absorbers, scrubbers, structural exhaust stack, two 25,000 cfm RTU lab make up plenums, office area, reception area, break room and toilet rooms Design & construction support in conjunction with McGough construction, Industrial electric and Metropolitan Mechanical Contractors Inc. (MMC).

Filmtec-DOW-$110,000,000.00 budget- Water Osmosis process, Warehouse and Office facility project located Edina, MN Project Manager for 300,000 square foot building. Design, Engineering & construction in conjunction with CDI and Eagan Mechanical

Filmtec-DOW-$7,000,000.00 budget- Warehouse and Office facility located Edina, MN. Project Manager in charge of construction/renovation of an existing 250,000 sq, ft building. Construction in conjunction with Eagan construction.

US Government-$35,000,000.00 budget-Grand Forks Air force Base Demolition project. Managed the demolition construction document phase for an 850 Housing unit, road and curbing, above and below ground, plumbing, sewer, mechanical, water tower, pump station and electrical utility infrastructure demolition project.

State of Iowa- $900,000.00 budget-Maximum Security Prison ISP Inmate housing facility upgrade project. Project Manager responsible for mechanical water pressure, air exchange and shower upgrade (2007).

Midwest Center for Wind Energy, Hendricks, Minnesota. Project manager In charge of field coordination for construction of two, 230’ tall wind energy turbines in conjunction with Northern Alternative, Total Construction and Gamesa Eolica.

PROJECT MANAGER

The Benham Group, Saint Paul, MN (July 1997-October 2002):

State of Iowa-$2,000,000.00 budget-Security Management systems (SMS) project- Des Moines, Iowa. Project manager responsible for the engineering, design and construction phases to accommodate the implementation of new card access readers, motion detectors, cameras and security access permissions for the State of Iowa capital complex buildings and Terrace Hill Governor’s mansion location.

3M-$1,000,000.00 budget- Building 270, 6th floor conference room remodel, Maplewood, MN. Project Manager responsible for the remodeling of a conference room facility, which included the installation of audio/visual equipment. (2002).

3M- $750,000.00 budget-Building 260 Pharmaceutical project. Project Manager responsible for the engineering design and construction of a 4,500 square feet lab and office space located in building 260 on the 3M corporate campus in Maplewood, MN.

Lead Designer/coordinator

Setter, Leach and Lindstrom, Minneapolis, MN (December 1996-December 1997

Fairview Lakes Regional Medical Center-$35,000,000.00 budget-Wyoming, MN. Coordinated disciplines and developed contract documents for this 180 bed, hospital project on I-35 north of Minneapolis.

PRODUCT DEVELOPMENT COORDINATOR

Nordquist Sign Company, Minneapolis MN (October 1996-December 1996):

PROJECT CAPTAIN

Opus Architects and Engineers, Inc., Minnetonka, MN (January 1996-October 1996):

Designer, OPUS, Centenial Promenade, Denver, CO. Developed and coordinated contract documents for this strip retail development.

Designer, The Shops at Promenade, Eagan, MN. Developed contract documents for this 20,000 sf strip retail development (Opus Corporation).

Designer, Topeka retail, Topeka, KS. Developed contract documents for a strip retail development which includes a Kohl’s department store, Sears HomePlace outlet and Barnes & Noble bookstore.

Designer, 7th Level Office Building, Richardson, TX. Developed contract documents for this 58,000 sf speculative office building.

Designer, Corporate Center Office Building, Phoenix, AZ. Developed contract documents on a spec office building by Opus Corporation.

PROJECT CAPTAIN

John B. Goodman Company, Minnetonka, MN (October 1994-January 1996):

AutoCad designer, coordinator and finish carpenter for 3 story Inn On Westport assisted living facility located in Sioux Falls, SD,

DESIGNER

Miles Homes, Inc., Plymouth, MN (March 1990-October 1994):

Generated detailed residential construction documents for prefabricated R1 occupancies. Cad technician Responsible for design and production of plans for precut homes. Developed code review and structural engineering/snow load analyses. Architectural design and engineering support for residential family dwelling from schematic development to final working drawings, provide code study with respect to life, safety and egress requirements for residential occupancies throughout the united states.

DESIGNER

Regis Corporation, Edina, MN (January 1987-March 1990):

Designer/Drafter, REGIS CORPORATION, Edina, MN. Generated construction documents for Regis Tenant improvement bid packages (Regis Hair Salons, Master Cuts, Saks Fifth Avenue, Essanelle). Coordinated tenant finish out documents with mall tenant coordinators, Project Managers, mall managers, architects, developers and contractors.

Minneapolis Community College, Minneapolis, MN AA Degree

OSHA 30 Certified

Storm Water Management certified

Skilled carpenter



Contact this candidate