Resume

Sign in

Engineering Plant

Location:
Houston, Texas, United States
Salary:
30.00 to 40,00 an hour
Posted:
February 01, 2018

Contact this candidate

Resume:

LAWRENCE K. NIKEL

**** **** *****, ***** *****

281-***-****

SUMMARY Offers vast experience in-house and fieldwork with chemical, petroleum gas processing, polymer production, fertilizers, and environmental industries like Oily Water Sewer. Principal Piping Designer. Three (3) years overseas work, extensive years in Engineering Design. Responsibilities have included drawing, checking, punch-out line list in the field, built models of plants and 3D models, survey work, photography work in plant, equipment layout and unit layout, assisted squad boss and close work with clients. Pipeline pump stations work, and helped in gathering information for estimating new work. (Checking)

On time and has a flawless attendance record.

PROGRAMS CADWorx coade, PDS & PDMS and INTERGRAPH, MICROSTATION,MICROSOFT - WordPerfect, WINDOWS,,Facet, FlexCad- AutoCAD 2D 14, Plantview. Links Aventail, Checking ISO’s and get Issued For Construction packages ready.

EMPLOYMENT HISTORY

2006- present Wood Group(Mustang) Engineering, Houston, Texas now Lubrizol Deer Park, Texas. seven years Deer Park total ten years

CHS Canada, Marathon all work done was on PDS which I produced.

Working on Lubrizol in Deer Park doing Autocad 14 and CadWorx.

Navis Works. P&ID revisions out of Vault.

2003-2006 CDI Engineering, BEAUMONT/HOUSTEN, TEXAS

GRIFFIN/DUPONT,HOUSTON,TEXAS, Draw Iso’s on Cad in V8,

Micro-Station, PDMS operator

Put packages for construction together. Plot plans, mechanical drawings,

piping plans drawing and Isometrics.

DUPONT,La Porte,Texas, Corn herbicide job in Lanate quick change out

spools and pipe designed so one batch product is in production, then changed to another fast and dropping spools to another, so production is down for a short period of time. Each were color coded to match the correct batch being produced.

ATOFINA, Beaumont, Texas, Checked Iso’s and Plan Drawings in twenty-six days

Dupont Plant, Nashville, Tennessee: Packages made for shut down to estimate hours and material.

Dupont Plant, La Porte, Texas: Drew iso’s for a corn herbicide project.

Griffin/Dupont Plant, Houston, Texas: Herbicide project revamp complete plant.

2003 ENGLOBAL Corporation, BEAUMONT, TEXAS

BASF Port Arthur, Worked fast track to complete 500 ISO’S for construction

And field checked lines to make sure it was constructed per P&ID’S and

ISO’S. In 10 days ready for construction.

ATOFINA Port Arthur, checked a new compressor and the attaching

Equipment and Iso’s (150), Plans and P&ID’s checked

2002-2003 Taylor & Hill Inc.-Houston, Texas

BP Chemical Plant, Freeport, Texas

Dow Chemical Plant, Freeport, texas

Iso’s produced for construction on small revamp jobs

1975-1983- FLUOR DANIEL, INC., Houston, Texas

2002 For Union Carbide Corporation, Arco Oil & Gas, Aramco Company, Saudi Arabia Houston and Overseas,Texaco Chemical Company,Cheveron,Marathon

Fluor used Autocad & PDS making ISO’s for issue for construction, Field Trips Requires

1984-2002 off and on Jacobs Engineering Group Inc. Houston, Texas

Lyndell Citgo Refinery-Pasadena, Texas Field Support

Hovensa Refinery- St Croix, Virgin Island Field Support

Hawaii Oil Refinery-Ohau, Hawaii Island Field Support

Citgo Refinery- Lake Charles, Louisiana Revamp Piping

City Services Poly-Plant-Lake Charles, Louisiana Estimate on

Start-up of plant after years of complete shutdown

Used Autocad and PDS

EDUCATION Horn Drafting Cad Center/ CadWorx and using program

Houston Community College / San Jacinto College / Massey Business College, Architectural Drafting /Interfaith Training and Employment Project(member of SPED),BES ENGINEERING INC./ PIPE STRESS ANALYSIS AND SUPPORT DESIGN, PDS & PDMS Trained, worked with Altris and Docmentum

At Bp to retrieve drawings to work with. Used Auto cad 2000i revised P&ID’s,

Plans, made Iso’s, retrieved information from the field and designed from the information.



Contact this candidate