HVAC Installation, Commissioning & Maintenance.Procurement & Material

Location:
Astana, 020000, Kazakhstan
Salary:
1200000
Posted:
April 24, 2018

Contact this candidate

Resume:

HVAC and Piping Engineer

Email: ac48j1@r.postjobfree.com 1 Mobile: +770********, +770********

HVAC Installation, Commissioning & Maintenance.

Electrical & Instrumentation Works.

Quality Assurance & Quality Control.

Piping/Structural Fabrication & Erection.

Rotating Equipment Installations.

Procurement & Material Management.

Construction Projects Coordination.

Mechanical Completions & Commissioning.

Projects Completions & Handover.

Well Versed with DW144, DW-143, SMACNA, ASTM, AWS, and ASHRAE SNiP & Gost standards.

AutoCAD

HVAC Installation, Commissioning & Maintenance:

Inspect HVAC equipment foundations and supervise inspection of layouts and installations of HVAC equipment such as chillers, AHUs, remote condenser, Cooling towers, chemical filters, Filters, Louvers, Scrubbers, VAV's, chilled water pumps, Air stacks, Non Return damper, fire and blast dampers, fresh Air Units, Exhaust units, capacitor bank, duct work, chilled water piping instrumentation, Valves, humidifier, pneumatic manifold, actuators, volume control dampers Heaters insulation of piping, Cladding of piping, installation of instrumentation piping Skid Compressor system etc.

Inspect Packaged and Split AC's, Pumps, Fan Chillers, Coolant Piping, Refrigerant Piping, Hangers, and Supports, including all ductwork to ensure compliance with the design.

Prepare non-conformance and surveillance reports applicable to Piping/ Mechanicals, HVAC installation work.

Supervising the contractor in the compilation of the handover and test packs together with all as-built documentation.

Responsible for QA/QC procedures and the Quality Plan are implemented during inspection activities Witnessed hydrostatic tests on valves (body and seat), pipe spools, piping, pipelines and pneumatic tests on pipes support, reinforcement pads.

A Dynamic professional with 20 plus

years of Experience in oil and gas

projects: QA/QC, Piping, HVAC Erection

& Maintenance, Procurement & Material

Management, Instrumentation, Ducting,

Electrical Works, Mechanical, plumbing,

Completions, Pre-Commissioning,

Commissioning, Projects Coordination &

Handover, Start-Up & Maintenance.

Mohammed Irfan Ansari

HVAC, Piping, Electrical, Instrumentation, Engineer Material, Construction & Projects Coordination.

Mobile: +770********

Kazakh Residence: 740*********

Email: ac48j1@r.postjobfree.com

ac48j1@r.postjobfree.com

Residence Address: Avangard, Street 3,

Building 33, Quarter 45,

Atyrau- 060001.

The Republic of Kazakhstan.

Languages: English, Urdu, Russian.

Skills

Work Experience

HVAC and Piping Engineer

Email: ac48j1@r.postjobfree.com 2 Mobile: +770********, +770********

Understanding of ISO 9001, DW-144, DW-143, SMACNA, ASTM. AWS, ASHRAE, Snip ROK 4.02-42-2006. SNiP RoK 4.02-05-2001, Ghost, SNiP 2.04.14-88 etc. Quality system requirements and implementation.

Support vendors commissioning of the HVAC systems in the warehouse.

Raise technical queries when the installation does not meet the Project specifications.

Support Supplier Quality Surveillance team and witness system completions activities for HVAC equipment.

Support vendors commissioning of the HVAC systems in the warehouse.

Delivering mechanical and HVAC, vendor packages to the fabrication and construction work sites that meet cost, schedule and, quality requirements.

Review of Project specification and P&ID s Handling all piping technical queries and investigating all field pipe work-related problems, including the drawing of field sketches when necessary.

Functional expertise in handling the production operations with key focus on bottom line profitability by ensuring optimal utilization of resources.

Experienced in managing the office activities like manpower recruiting, managing accounts, managing office staff their daily activities (monitoring) etc.to ensure the preparation and submission of Mechanical Completion Certificates and Package’s (MCC) to COMPANY is as per Contract, plan schedule, Regulatory Authority (GOST, GGTN) and that all Certification Documents (Engineering/ Procurement/ QA/QC) are Traceable and complies with Project Specification.

Ensure the Productivity and Quality are maintained by subordinates. Monitoring the daily work activities of Sub Contractor and updating Sub Contractor Progress Reports Assist Design Department in solving Piping Modification and Technical Problems in the Field.

Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements.

Responsible for counter checking by Isometric/Piping plan for the Chilled water spools erected in the correct location and orientation.

Preparation of “AS BUILT” drawing, Preparation of field piping system test packages, including system limit on P&ID and piping Isometric.

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.

Responsible for line checking after the hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

Ensure that all punch list items are resolved; client handover is satisfactorily concluded and that there is no prolongation of the project.

Installation, testing, pre-commissioning, commissioning & operation of Heating, Ventilation & Air Conditioning Systems comprising of Chillers, Ducting, Heaters, Humidifiers, Air Handling Equipment, HVAC, LC & LS Lines, Copper piping, Vasda piping system, chilled water piping, insulation of piping, insulation (Piping and Ducting) Cladding of piping, installation of instrumentation (Non-indicating pressure transmitter, Flow Switches, Flow Meters, pressure & DP pressure switches, Automatic Controls, Temperature and Pressure Sensors, Temperature switches, Pressure and Temperature transmitters) etc. Estimation of resources required for installation in the form of manpower, machinery & materials.

Preparation of weekly & monthly report and submit to Department Manager for the same.

Responsible fabrication of Galvanized and Stainless-Steel Ducts and equipment’s in factory supervises Technical work of employs, inspection, Quality.

Preparation of schedules for installation of HVAC systems including identification & mobilization of identified resources.

Equipment, Compressors, Cooling Towers, AHU, FCU, piping and control systems & Ducting work. Ensures that all records of the works carried out are maintained.

Modification of drawings ducting, chilled water pipelines, copper lines, Instrumental piping & tubing.

Installation, insulation, and testing of ductwork, AHU, Extractor fans, chillers, Instrumental Pneumatic Air system, chilled water pipes lines, potable water line, Humidifiers, Drain lines etc.

Ensures storage & preservation of equipment / materials as per the recommendation of manufacturers/ Contract specifications through Preservation Supervisor/ Warehouse. HVAC and Piping Engineer

Email: ac48j1@r.postjobfree.com 3 Mobile: +770********, +770********

Installation of the pneumatic air system, Skid Compressor system, actuator, valve extractor fans, fire dampers, fire

& Gas damper and blast dampers etc.

Testing pneumatic lines, chilled water pipes line, vesda lines. Hydro testing Low condenses & Low steam pipelines of the heating system.

Commissioning and pre-Commissioning of Piping Systems, HVAC system, Start-up, final work down and Handover.

Installation and Maintenance of chillers, like York Reciprocating System, Carrier (GTN Carrier, GT, GB, GTN, Flow- tronic, Pro-Dialog), Trane (reciprocating, and Screw Compressor), SKM, Caliref and Maguey Reciprocating System.

Maintenance of chillers Plant, chilled water pumps, A.H.U, F.C.U., Fresh air unit, Exhaust Fan, Ventilation, & Pressurizing pumps and shutdown work.

Take over and Hand over building projects with clients and Companies. Maintenance of chiller plant and

Worked on the palaces Installation and Commissioning of Chillers, F.C.U., A.H.U, Chilled water pumps, Exhaust fans, Solar system, Hot water system Humidifiers, and V.A.V system. Electrical & Instrumentation Works:

Termination & Installation of Electrical Panels, Cable Pulling, and instrumentation cables High & Low Voltage Chillers, A.H.U. F.C.U. and V.A.V. Systems etc.

B.M.S. System Installation & Commissioning, Panels, Wiring (Switches, Sensors) For Chillers, A.H.U. F.C.U. and V.A.V. Systems etc.

Installation of Instrumental cubic panels (fire & gas, telecommunication, DCS, ESD Marshalling, power distribution etc. In SIS buildings).

Witness all HVAC tests including verification and calibration of electrical instrumentation and safety devices.

Maintenance of Commercial Buildings for Electro-Mechanical works.

Verify that the works are completed to the agreed schedule.

Reviews spare parts requirements for critical electrical equipment.

Execute assigned work and deliver documentation within the project schedule.

Maintenance, Installation, and Modification of Capacitor Bank of different types. Quality Assurance & Quality Control:

Implement of QA/QC procedure and test Inspection Plan for the project.

Ensure that the work is done as per approved Construction drawings, Specifications, and Standards.

Responsible for the Quality Control Plan, Procedure and Test, Inspection Plan for HVAC and MECHANICAL.

Responsible for QA/QC monitoring witnessing on installation, HVAC Equipment and Welding of above ground Process Piping.

Responsible for QA/QC reviewing of NDT reports such RT, PMI, PWHT, DPT, and MT etc.

Responsible for QA/QC procedures and the Quality Plan are implemented during inspection activities Witnessed hydrostatic tests on valves (body and seat), pipe spools, piping, pipelines and pneumatic tests on pipes support, reinforcement pads.

Understanding of ISO 9001, DW-144, DW-143, SMACNA, ASTM. AWS, ASHRAE, Snip ROK 4.02-42-2006. SNiP RoK 4.02-05-2001, Ghost, SNiP 2.04.14-88 etc. Quality system requirements and implementation.

Review of Project specification and P&ID s Handling all piping technical queries and investigating all field pipe work-related problems, including the drawing of field sketches when necessary.

Daily surveillance activities include welding consumables, welding equipment, and inspection equipment, mechanical inspection activities in rotating equipment, HVAC Installation, non-rotating equipment levelling

/alignment, Non-Destructive Testing Inspection and supervision associated with Quality Control in Construction activities.

Monitoring all fitting/welding activities performed in the project including piping and supports piping.

Review of pressure test/Hydro test packages of line in accordance with P&ID and Isometric drawings. HVAC and Piping Engineer

Email: ac48j1@r.postjobfree.com 4 Mobile: +770********, +770******** Piping/Structural Fabrication & Erection:

Responsible for pipeline planning, screening of pipeline project opportunities, route selection, and feasibility.

Review of Project specification and P&ID s.

Handling all piping technical queries and investigating all field pipe work-related problems, including the drawing of field sketches when necessary

Coordinating with Engineering and Construction and liaise with the Client on detail engineering requirements.

Develop Construction Engineering Technology in line with Company Policy and Procedures.

Raising MTO(s) for all materials required to additional materials for hydro test etc.

Responsible for Piping erection operations and pipe support installation in accordance with schedule, Procedures, Specifications, Priorities and Availability of Construction Drawings.

Ensure the Productivity and Quality are maintained by subordinates. Coordinate with other Disciplines on site.

Preparation of “AS BUILT” drawings.

Assist Design Department in solving Piping Modification and Technical Problems in the field.

Provide technical answers to Engineering Queries raised up by the sub-contractor confirming design drawings and standard requirements.

Responsible for counter checking by Isometric/Piping plan for the spools erected in the correct location, orientation, alignment, and plumpness.

Carrying out the final P&ID check of installed piping systems in the module.

Responsible for carrying out Mechanical Clearance, Conducting Hydro and Pneumatic tests, fulfilling commissioning and Pre-Commissioning requirements for the project.

Responsible for line checking after the hydro test to complete the post punch list prior to sign-off the test packages before signing the completion of piping / mechanical.

Ensure that hydro test reinstatement is to be done as per procedure. Rotating Equipment Installations:

Supervision of Fabrication, erection, installation, and commissioning of equipment’s (Static and Rotary),

Fabrication, Erection & Alignment of Structures (Equipment Supports, Pipe Racks), Piping (Process, Utility, Water), Static & Rotary Equipment.

Inspection of equipment’s & piping at all stage.

Preparation of installation quality checks reports as per standard.

Commissioning and handover of equipment’s, piping systems along with the reports to commissioning department.

Follow drawings, Equipment’s, Layout, Piping Isometrics & P & ID etc.

Preparation of progress reports for Piping, Structural, Equipment, Painting, Insulation etc.

Preparation of Bill of Materials/Material takes off, manpower requirement. Procurement & Material Management:

Managing procurement activities starting from the proposal stage through to post contract award.

Preparing recommendations to project review committee, monitoring EPC schedules, procurement status reporting, directing, supervising and administrating complete procurement cycle.

Developed and Implemented proactive procurement strategies, policies, procedures and systems from the viewpoint of cost, schedule and quality controls for all procurement stages of purchasing, expediting, test & inspection and transportation.

Prepared/Compiled Vendors Lists for EPC contracts and arranged for their approval by PM and client as per contract conditions and level of authority.

HVAC and Piping Engineer

Email: ac48j1@r.postjobfree.com 5 Mobile: +770********, +770********

Established purchasing, expediting and transportation control procedures. Utilizing RFI (Request for Information), RFP (Request for Proposal) and RFQ (Request for Quote) techniques to identify, select and engage with suppliers to ensure competitive market advantage.

Ensuring availability of cost-effective material on time, taking obsolescence and cost into consideration.

Coordinating with QA/QC for Planning, organizing, controlling test and inspection activities as per project objectives.

Monitoring and reporting progress against the procurement plan.

The competence and performance of all assigned procurement department personnel, within man-hour and cost budgets.

Developing and managing vendor relationships.

Construction Projects Coordination:

Provide all necessary support to the Area Construction manager in the proper planning and coordination of activities.

Ensure the coordination and the surveillance of the works in the area of the project assigned to him, including the work of any subcontractor.

Ensure the implementation of progress monitoring and cost of all items concerning the construction activities, and compare to planned durations, budgets and productivities Consolidate data from all the constructors in order to manage the work schedule.

Keep detailed records of all activities and events that occur in work areas (daily site report updates).

Implement the Project Quality Documentation for all construction activities.

Enforce the observance of the Health and Safety Management Plan and Environmental Plan.

Enforce training of all individuals acting on the field on HSE requirements.

Coordinate construction activities are undertaken by subcontractors. Monitor and report on progress.

Assign work activities and daily tasks to site engineers, inspectors etc. monitor workflow, review and evaluate work products.

Mechanical Completions & Commissioning:

Plans, develops, coordinates, and directs Testing & Commissioning activities within a discipline for the assigned project(s). Provides Testing & Commissioning supervision or assistance at the job site of certain projects as assigned.

Supervises, coordinates, and reviews the work of assigned engineers, estimate staffing needs and schedules, and assigns work to meet completion dates.

Preparation of system testing and turnover documentation including System scoping documents, test records, test procedures and other similar required documents;

Supervise and direct subcontractor personnel as required to support commissioning activities (i.e.: HVAC balancing, fire protection commissioning, etc.). Plan work with the subcontractors and monitor it and control it in accordance with the terms of the contract to stay within the budget and schedule constraints. Report and document subcontractor work activities on a daily basis in accordance with applicable procedures;

Prepare system preoperational test procedures for assigned systems. Complete testing per the Project Standard Test and Commissioning Procedures (STCP) and Standard Work Process Procedures (SWPP), pre-op procedures and other specific procedures which may be required to be prepared in this position. Complete all test records, data sheets, etc. to fully document testing activities; HVAC and Piping Engineer

Email: ac48j1@r.postjobfree.com 6 Mobile: +770********, +770********

Compliance with all HSE policies and processes and HSE performance criteria.

Assist in the delivery of milestone zero – No LTI

Contribute to the issuance of STOP observations

Reporting of near misses

Participate where required on HSE shop visits.

Assist in monitoring HSE compliance (PPE, Equipment, etc.) as part of Quality surveillance and audit activities.

Report areas of concern to Company HSE personnel. Country : Kazakhstan Atyrau, Tenigaz, Aktau.

Project : Eskene West Railway Project, TCO, ERSAI, OPPB, Renco. Company : NSG

Designation : Senior QA / QC Engineer of Projects

Country : Kazakhstan Astana

Project : Abu Dhabi Plaza / Expo 2017 /and Astana city Company : ZalStroyServicePlus

Designation : Site Engineer

Country : Kazakhstan Astana

Project : Abu Dhabi Plaza and Astana City

Company : ACCM01

Designation : HVAC & Piping Department In-charge

Country : Kazakhstan Atyrau

Project : (Eskene West) Kashagan Field Development Project Company : RENCO - KAT CONSTUCTIONS LLP

Designation : Supervisor / Instrumentation / Piping / Ducting/ HAVC Country : India Mumbai

Project : Maintenance, Installation and Erection

Company : CLASSIC COOLING SYSTEMS

Designation : HVAC Pipping Site Engineer

Country : United Arab Emirates Abu Dhabi, Dubai.

Project : Maintenance and Projects

Company : AL- JADEED CONTRACT ENGINEERINCOMPANY

Designation : HVAC Supervisor / Installation Department In charge Country : Saudi Arabia Riyadh

Project : Installation / Maintenance

Company : AL-OWAIDHA GROUP OF CO. Pvt. Ltd. (Saudi Arabia) Designation : HVAC Piping / Ducting/ Engineer.

HSE:

Employment History

Oct 2015 to working...

Nov 2014 to Aug 2015

May 2013 to Sep 2014

Sep 2007 to Mar 2008

Mar 2009 to Nov 2012

Apr 2005 to Sep 2007

Apr 2008 to Feb 2009

Oct 2001 to Feb 2005

Nov 2014 to Aug 2015

HVAC and Piping Engineer

Email: ac48j1@r.postjobfree.com 7 Mobile: +770********, +770******** Country : India, Mumbai

Project : Maintenance All Mumbai

Company : SUPER CHILLERS

Designation : Piping / HVAC Project IN-charge

Country : India Mumbai

Project : Hotel Maintenance

Company : Hotel Sea Princess

Designation : Hotel Maintenance IN-charge

Personal Information:

Place Of Birth: : Mumbai India

Nationality : Indian

Date of Birth : 12/06/1974

Passport Details : Pass port No : M 1471880

Issued Date : 01 - 09 – 2014 Expire Date : 31 -08 – 2024 Kazakh Residence Card : 740*********

Educational Qualification:

Passed S.S.C. in March 1991 PUNE BOARD.

Technical Qualification:

Passed 2 years I.T.I (National Council for Vocational Training) in 1993 in HABIB TECHNICAL INSTITUTE. (N.C.V.T.).

Passed 1 year N.C.T.V.T. (National Council for Vocational Training) in 1994 in HOTEL SEA PRINCESS.

Passed 3 years Mechanical Diploma in 1997 from The ALIGARH MUSLI M UNIVERSITY. Additional Qualification:

Completed MS Office 95, 97, 2000 & 2003 from SAK COMPUTERS.

Completed Auto Cad 2002 in First Class from SAK COMPUTERS.

Completed Auto Cad 2008 & 2009 In St.Angelo’s Computer Education (ISO 9001:2000 Certified Company) Award Received:

Training in LG. ACADEMY UAE in Dubai for the tropical System.

Training Completed for AGIP KCO Level 2 Signatory to Permit to Work course GEOO.HSE.PR002.000 Revision: A06 at Kashagan in Karbatan Project.

Training Completed for AGIP KCO Level 2 Signatory to Permit to Work course GEOO.HSE.PR002.000 Revision: A07 at Kashagan in Karbatan Project.

Sweet Gas Training.

Possess permit to work for On Shore Eskene West. I wish to join your esteemed organization as QA/QC, Piping, HVAC, Electrical, Instrumentation, Procurement & Material Management, Construction & and third-party inspection for maintenance, and PROJECT CO-ORDINATOR. Thanking You, Yours Respectfully iRFAN

Aug 1994 to Jul 1997

Aug 1993 to Jul 1994



Contact this candidate