MUHAMMAD AYUB MALOOK

Email: ac47r8@r.postjobfree.com

Qatar : +974-********

Mobile: +92-331-******* Home: +92-543-******

OBJECTIVE:

To work in a competitive environment that effectively utilizes my analytical, interpersonal, leadership and organizational skills to conceive and achieve solutions. The solutions which help the organization in not only meeting its targets, but also allowing it to grow, thereby, enhancing my own skills as an individual and as a key player in the organization's development. A position in an international, professional organization where I will be able to utilize the knowledge & skills gained from experience during my professional carrier. An experienced team player with excellent communication and interpersonal skills who has the ability to work independently under pressure can lead, motivate and influence others and can train and monitor subordinates.

EXPERIENCE:

19 Years Mechanical Piping Supervision of Oil & Gas fabrication, pipe spool erection, steam tracing, copper tubing, stainless tubing, pipe support fabrication & installation, underground piping fire hydrant installation, fire protection piping installations, existing piping markings for demolition at refinery and most of all hydro testing.(Work with up to 400 Manpower Leading Take Responsibility)

Installation of Cold Boxes, Compressors Columns, vessels, skid mounted equipments, Turbines, air cooled exchangers, and bulk Storage tanks.

Low temperature piping C/S, SS header, C/S instrument air piping, other C/s process lines. Sizes from to 72 .

C/S Piping for intack air, cleaned air, seal gas pip. Sizes 12 to 24 .

Product lines 24 direct Gass supply to client.

RO water GRP 32 and Sea water from sea GRP 62 .

Watcon Engineering Feb, 2017 to March 2018

Designation: Site Superintendent

Project : Balloki Power Plant 1223 mw

RESPONSIBILITIES:

Supervise construction of all Hess facilities and joining pipelines, from breaking ground to start up.

Strategically place equipment, tools and materials for efficient, convenient access.

Keep daily reports of progress for client, and communicate progress through weekly call in meetings.

Keep daily time logs and tracking of man hours.

Keep an accurate weld map, complete with necessary NDE information, as well as hydro test

Communicate with client to identify and implement any changes to construction plans (iso's, P&ID's, etc.)

Coordinate delivery of equipment and materials so they arrive on site as needed; issue P.O.'s when needed.

Keep employees motivated; moving forward as efficiently as safely possible so that deadlines are met.

Coordinate subcontractors like cranes, concrete, painters, etc. so that they do not interfere with other

Al Hassan Engineering Oman Jan, 2015 to Jan, 2017

Designation: Senior Piping Supervisor E 3 (equal to superintendent)

Project : SNCP PDO Site Qarn alam

RESPONSIBILITIES:

Applies the final, procedures approved by the client

Ensures observance of the project specifications

Ensures that safety and quality standards are respected

Prepares and co-ordinates the detailed programmes for the correct management of the works of one s specific responsibility

Supports the Superintendent in solving technical and management problems encountered in the area of responsibility

Manages direct and sub-contracted work

Manages human and technical resources, indicating any needs and surplus in good time

Ensures that production quality and quantity standards are observed

Ensures that safety standards are observed and guarantee the quality of the work

Assists with the hand-over of completed works

Measures the works carried out with the Works Director and sub-contractors representatives

Assists with the demob of the site (shipment of material and equipment, solution of any outstanding questions)

EKL Limited (Hyundai) Pakistan march 20 2014 to Dec 2014

Designation: Piping Engineer

Project: Attock Refinery Limited Pakistan

RESPONSIBILITIES:

Managing construction activities, ensuring the scope of work is achieved in accordance with contract requirements and timeframe, and in compliance with specifications and standards established.

Coordinating the activities of specialty supervisors ensuring that priority disputes are resolved.

Cooperating closely with the Safety team to ensure that HSE standards are maintained and that safety issues are monitored and addressed by the site supervision team.

Ensuring that the quality of work carried out complies with HSE standards.

Monitoring and reporting, in conjunction with specialty supervisors, technical progress.

Participating in construction meetings with clients.

Reviewing and commenting on documentation (technical reports, specifications, procedures, drawings, etc) ensuring implementation of established procedures and good engineering practice.

Reviewing and evaluating any change proposals / requests, ensuring appropriate technical support is provided in decision making.

Providing within the Construction Site Team, for studies and activities, a point of direct contact and liaison with various design institutes, interested parties, and approvals and regulatory authorities.

Lease with Client & Invoiced for estimation of job.

Producing and follow up of Technical Quarry Request to Client & Engineering.

Progress S Curve Planned vs. Actual.

Arabian Bemco KSA Dec 2012 to Dec 2013

Designation: Piping Superintendent

Project: Riyadh Power Plant

RESPONSIBILITIES:

Managing construction activities, ensuring the scope of work is achieved in accordance with contract requirements and timeframe, and in compliance with specifications and standards established.

Coordinating the activities of specialty supervisors ensuring that priority disputes are resolved.

Cooperating closely with the Safety team to ensure that HSE standards are maintained and that safety issues are monitored and addressed by the site supervision team.

Ensuring that the quality of work carried out complies with HSE standards.

Monitoring and reporting, in conjunction with specialty supervisors, technical progress.

Participating in construction meetings with clients.

Reviewing and commenting on documentation (technical reports, specifications, procedures, drawings, etc) ensuring implementation of established procedures and good engineering practice.

Reviewing and evaluating any change proposals / requests, ensuring appropriate technical support is provided in decision making.

Providing within the Construction Site Team, for studies and activities, a point of direct contact and liaison with various design institutes, interested parties, and approvals and regulatory authorities.

Lease with Client & Invoiced for estimation of job.

Producing and follow up of Technical Quarry Request to Client & Engineering.

Progress S Curve Planned vs. Actual.

JK / Shell - Qatar September, 2009 to Dec, 2012

Designation: Piping Supervisor

Project: Shell Pearl GTL (Ras Laffan)

RESPONSIBILITIES:

To study the isometric drawing received from the clients and to identify the pipe lines and carry out the inspection work.

Check flow direction arrows on valves; verify that they are properly identified and valves are installed in accordance with flow direction.

Supervise and Inspection of cold and hot insulation, cladding on piping and equipments.

Line check to verify the use of correct material fittings, valves, and supports, prior to hydro test and prepare punch list for incomplete works, check and closing after the work is done.

Checking ISO-DWG as accuracy of representation, dimensions, orientation, materials, technical data etc. in quantity and quality.

Pre-commissioning, commissioning, Air Blowing & Steam Blowing activities.

Coordinating the activities of specialty supervisors ensuring that priority disputes are resolved.

Cooperating closely with the Safety team to ensure that HSE standards are maintained and that safety issues are monitored and addressed by the site supervision team.

Ensuring that the quality of work carried out complies with HSE standards.

Participating in construction meetings with contractors.

CCIC-Qatar June, 2008 to September, 2009

Designation: Piping Foreman

Project: Ras Gas Onshore Expansion

RESPONSIBILITIES:

Ensuring that Quality Control.

Approving requistion for stock items.

Ensuring that the quality of work carried out complies with HSE standards.

Issuance the Material Request, Stock items and Non-Stock items.

Complete Supervision of Pipe and Valve Fabrication, Welding & Erection.

Producing and Maintaining Micro plan and Manpower requirement plan.

Maintaining and updating records of all relevant Production documents.

Producing sketches with details dimensions and instructions to enable all work of a program to be carried out.

Established Daily/Weekly/Monthly Reporting System.

Producing and follow up of Technical Quarry Request to Client & Engineering.

Progress S Curve Planned vs. Actual.

Maintaining a complete record of all initial and final inspection complete with materials usage drawing and testing results.

CBI Constructors SA - Angola December, 2005 to May, 2008

Designation: Piping Foreman

Project Angola: Cabinda Gas Plant

Supervising structural steel and pressure pipe tradesmen for construction project in the oil & gas industry.

Manage staff with the help of leadhands.Manage work in progress and related reporting.

Inspecting completed work and ensuring that it meets all company and industry standards.

Review hours coasted to jobs for the efficiency, production and budgets.

Organize multiple jobs in the shop.

Ensure good housekeeping is maintained and safety program is followed.

Organize equipment, shop personel, and work load to meet work requirements.

Ensure that all tasks are completed efficiently, effectively and safely.

Ensure that the all equipments are fire proofed near the sulfur area.

CCIC - Oman November, 2003 to January, 2005

Designation: Piping Foreman

Project Oman: Oman India Fertilizer

RESPONSIBILITIES:

Inspecting field sites to observe and evaluate condition and operability of facilities and structures, and to collect field survey data and measurements.

Conducting tool box meetings at site before starting the job, checking QA/QC at site & conducting meetings.

Cooperating closely with the Safety team to ensure that HSE standards are maintained and that safety issues are monitored and addressed by the site supervision team.

Ensuring that the quality of work carried out complies with HSE standards.

Expediting with material control function material delivery, distribution and availability in accordance with planned activities, ensuring Contracts & Procurement are notified to purchase lost or missing material.

Checking if the piping drawings and equipment as specified, meet the project requirements, standards and rules as per industry best practice.

Checking ISO-DWG as accuracy of representation, dimensions, orientation, materials, technical data etc. in quantity and quality.

Checking P&ID and isometric drawings, proposing for a new revision when necessary.

Established Daily/Weekly/Monthly Reporting System.

Pakistan Refinery Limited - Pakistan March, 1997 to October, 2003

Designation: Mechanical Foreman

RESPONSIBILITIES:

Complete Supervision of Mechinical Febrication, Erection & Welding.

Pipe & Instrument installation & modification.

ACCOMPLISHMENTS:

Outstanding Performance as a Piping Supervisor (GTL Project) Qatar

Safe work Certificate (Ras Gas) Qatar

Safety Man of the Month (Dodsal & Co. LLc) Oman

Best What if Award (Dodsal & Co. LLc) Oman

Incident & Injury Free (Q-Chem Project) Qatar

EDUCATION:

1993 1996 Sargodha, Pakistan

DIPLOMA IN ASSOCIATE ENGINEERING (Mechanical)

Mechanical Engineering

Physics and Mathematics Subsidiary

Punjab Board of Technical Education

1990 1992 Sargodha, Pakistan

SECONDRY CERTIFICATE

Mathematics Main with Physics and Chemistry Subsidiary

Board of Intermediate & Secondary Education

COMPUTER Skills:

M.S Office

Internet/Email

M.S Windows

TRAINING:

The Leadership Supervisor Program (Institute of Leadership & Management - Qatar)

Liquid Penetrant Testing Level-II (JP Technical Institute for NDT Qatar)

Radiographic Testing Level-II (JP Technical Institute for NDT Qatar)

Magnetic Particle Testing Level-II (JP Technical Institute for NDT Qatar)

Fire Fitting (GTL Qatar)

Permit to work (GTL Qatar)

Risk Assessment, J.S.A (GTL Qatar)

IFR (Initial Fire Response) (From National Training Institute Oman)

HSE Tools and Skills (From National Training Institute Oman)

Coaching Mentoring and Performance Assessment Training (From National Training Institute Oman)

Safety Leadership for Front line Supervisor Training (From National Training Institute Oman)

Fire Warden Training (From National Training Institute Oman)

First Aid Training (CPR and AED) (From National Training Institute Oman)

H2S Awareness and Escape Training ( From National Training Institute Oman)

Attended IIF Training (Ccic Cb&I Dadsal Jk Al Hassan )

PERSONAL DETAILS:

Present Address : Dhok Gujjar, P.O Ara, Tehsil Choa Saiden Shah

: District Chakwal Punjab Pakistan.

Date of Birth : 26/02/1977

Passport No : AV1139412

Passport Expiry : 2016

Status : Married

Driving License : Qatar LTV

I hereby declare that the above statements are true and correct to the best of my knowledge and belief.