CURRICULUM VITAE

N.DEENADHAYALAN. B.E

QA/QC-ENGINEER / INSPECTOR

ac45k5@r.postjobfree.com

Mobile: 009**-*********; 0091-948-***-****

EDUCATIONAL QUALIFICATION:

Bachelor of Engineering – 1st Class (72 2005-2009)(EEE) TECHNICAL QUALIFICATION:

* BGAS-CSWIP Painting Inspector.

* CSWIP 3.1 Welding Inspector.

* ISO Internal QMS & EMS Auditor Training Course. (ISO-9001 & 14001)

* ASNT LEVEL-II (PT, UT, RT, MPT, RTFI).

* Galvanizing Inspection Course (American Galvanizing Association).

* Training in the Validation of Welding Equipment (EN50504, 2008)

* STRUM-IS Evaluation (structural steel management software)-Training.

* Advanced Diploma in Java Programming (A-grade).

* Languages, Web Tools : Basic Internet, windows Live, outlook

* Database : MS- office, Open office.

* Operating System : Windows7/xp/vista.

EXPERIENCE SUMMARY:

TOTAL EXPERIENCE : 7+ years

CAREER HISTORY in KSA:

Company : ALBAWARDI STEEL INDUSTRIES

ARAMCO /ROYAL COMISSION APPROVED VENDOR.

Designation : QA/QC-ENGINEER / INSPECTOR

Company Profile : Manufacturing and supply of Heavy structural steel / miscellaneous steel for oil & Gas, Petrochemical, Structural Buildings... Duration : June-2012 to till date

Experience : 4+ Years

MAJOR PROJECTS HANDLED (Structural):

SL. NO PROJECT CONTRACTOR CLIENT

1 TANK FARM PLAT FORM

JUBAIL EXPORT REFINERY

DAYIM PUNJ LLOYD SATORP

2 EA PROJECT,SIPCHEM/JUBAIL MIKANG SIPCHEM

Page 2 of 6

3 CHANNEL LINER AL DOSSARY MAADEN ALUMINUM

4 WIRE & CABLE COMPUNDING PLANT POSCO ENGINEERING SIPCHEM 5 PIPE RACK;

SITE DEVELOPEMNENT OF DOWNSTREAM

INDUSTRIES PHASE-1;

INFRASTRUCTURE OF JUBAIL-2

AZMEEL;

BARGASH;

KHONAINI;

CCCC

RCJY

6 SADARA MIXED FEED CRACKER DAELIM SADARA

7

YANBU EXPORT REFINERY PROJECT

WASIT GAS PLANT SRU & UTILITIES

SK ENGINEERING & CONTRACTING SAUDI ARAMCO

8 SHAYBAH GAS TREATMENT(PKG#1) SAMSUNG ENGINEERING CO SAUDI ARAMCO 9 JAZAN REFINERY PROJECT PETROFAC; JGC; HYUNDAI; SKEC SAUDI ARAMCO 10 MIDYAN GAS PROCESSING FACILITIES, KSA LARSON TUBRO ARABIA SAUDI ARAMCO DUTIES AND RESPONSIBILITIES AS QA/QC-ENGINEER:

Responsible and reporting to the QA/QC- Manager.

Reviewing Contract Documents, standards, client specification related to project.

Preparation of the Project Specific Quality Plan, Inspection and test plans, check-sheets and related procedures.

Responsible for all aspects related to Project quality assurance and quality control

Implementing the QA/QC procedure during whole process of fabrication up to delivery to site.

Verify all inspection is carried out as per approved ITP or project specifications / client requirements.

Following up with Project and Production team that the work done as per the Project Specification, ITP, Procedures & Method Statement.

Witness in WPS & PQR, Qualifying the welder and monitoring their test card renewal.

Co-ordinate with QC-Inspector to Carrying out concern inspection of materials fabricated and Prepare reports.

Identifying and issuing of non-conformity as observed during inspection

To check all repairs are perform correctly and non-destructive tests are regularly repeated and keep a report file for all non-destructive tests. Page 3 of 6

Coordinating with client and sub-contractors throughout the various phases of the contract. Daily shop inspection and periodical sub con inspection.

Completion of necessary documentation to verify the work performed. Ensuring that inspection requests are implemented. Ensuring that all test reports are verified to meet the contract requirements.

Acting as point of contact, Monitoring and coordinating with supervisors, monitor and control the project on day-to-day basis through its period of execution to ensure an quality, economical and timely completion of the project with safety precaution and without compromising on quality and also notify the Project Manager and the Client in case of any variations.

Reviewing the Materials and Reports (MTC, Dimensional, Welding visual, NDT and coating reports) before raising the Inspection Request to client as per ITP.

Coordinating and arranging Third Party/client personnel for inspection.

To ensure all materials delivered to site are inspected and conform to specified requirements.

Issue and administer Non Conformance Reports, verify necessary corrective action taken and ensure follow up.

Report to the Project Manager any deficiencies in the operation of Quality Management & Control System.

Completion of final quality documentation, Manufacturing Record Book in a presentable manner, in accordance with the conditions of contract.

Co-ordinate and conduct Internal Audit as per the QMS & Audit plan given by QMR.

Monitoring the calibration due of all instruments and equipment’s and arrange for calibration if any expiry.

Responsible for overseeing/audits of subcontractor Quality Management systems. CAREER HISTORY IN INDIA:

MRM CONSTRUCTION:

Designation : Site Engineer.

Work scope : Fabrication, Erection, Testing, Commissioning of HVAC Pipe line, Pumps, AHU, Chillers Plant, Fire fighting Pipe line, Booster Pump, Mechanical Work, structural Erection, Valves, Fire Alarm, smoke detector . Duration : June-2009 to May-2012

Total Experience : 3+ Years

Page 4 of 6

PROJECTS HANDLED:

Project : Fire Protection System, TS-II Expansion Project Contractor : UTC FIRE & SECURITY

Client : Neyveli Lignite Corporation Limited, Neyveli Designation : Site Engineer.

Duration : Jan-2011 to May-2012

Experience : 1 Year 5 Months

DUTIES AND RESPONSIBILITIES AS SITE ENGINEER:

Reporting to the Project – Manager.

Responsible in Fabrication, Erection and Commissioning of FIRE FIGHTING SYSTEM (Hydrant System, Spray System and Aragonite System.)

Responsible to assign & monitoring the daily work Activities.

Erection of Booster pumps, valves, monitoring & control Instruments.

Responsible to arrange materials for the work without delay.

Knowledge in reading the whole drawings (fit up, erection...etc.).

Supervising in fit up, welding activities and carried out suitable NDE Test.

Carried out Hydro Test as per client’s specification.

Supervising Knowledge in above ground and underground coating of pipes as per client’s specification.

Supervising in structural steels fabrication, coating & erection.

Do commissioning of all the systems.

Project : HVAC, TS-II Expansion Project

Contractor : ABB LIMITED.

Client : Neyveli Lignite Corporation Limited, Neyveli Designation : Supervisor

Duration : June- 2009 to Jan 2011

Experience : 1 Year 8 Months

DUTIES AND RESPONSIBILITIES AS SUPERVISOR:

Responsible in all work of HVAC IN THERMAL POWER PLANT (mechanical & electrical).

Responsible to assign & monitoring the daily work Activities.

Responsible to arrange materials for the work without delay. Page 5 of 6

Erection of Pipe line, Booster pumps, AHU, cooling tower, Chiller unit pump & valves, monitoring & control Instruments.

Supervising in fit up, welding activities and carried out suitable NDE Test.

Carried out Hydro Test as per client’s specification.

Supervising Knowledge in above ground and underground coating of pipes as per client’s specification.

Supervising in structural steels fabrication, coating & erection.

Do commissioning of all the systems

Responsible for witnessing, verifying, inspecting the work at various inspection points Such as:

Receiving inspection for Raw materials (steel, welding consumables, abrasives, paints, thinners)

Pre-Assembly preparation inspection.

Fit-up and Dimensional inspection.

Visual welding inspection.

Witnessing the welding parameters as per WPS.

Reviewing temperature monitoring of Electrode Ovens.

Witnessing the Non-destructive testing.

Conducting/Reviewing Internal Calibration / validation.

Send Raw materials for Periodical Mechanical & chemical Analysis.

Witness/Reviewing in all Report/Test result in Galvanizing.

Witness/Review in all Report/Test result conducted related to coating.

Handling Client Inspection.

Responsible to submit Final Dossiers.

Standards, Codes, Methods, Specifications etc.

Knowledge in B.S., SSPC, SAUDI ARAMCO, ASME, ASTM, AWS, ISO and implementation of QMS.

INSPECTION INSTRUMENTS USED:

Steel Tapes, Vernier Caliper, Screw Gauge.

Clamp meter, weld gauge, Filler Gauge, Digital Thermometer.

Surface Profile Comparator, Surface Profile Gauge, Testex Tapes.

Whirling Hygrometer, Dew Point / Humidity Calculating Disc, Digital dew Point gauge.

Temperature Gauge – Magnetic, Digital.

Page 6 of 6

WFT Gauge / Comb Gauge, Eccentric Wheel.

DFT Gauge – Electronic – Ferrous, Non – Ferrous and Dual.

Holiday Detector – Wet Sponge Type and Spring Rings and Brush Type.

PIG – Gauge, Cross – Hatch Cutter – for Cross Hatch Adhesion Test.

Adhesion Tester / Pull – Off Tester – Hydraulic Type and Tripod Spring Type.

Knife test for Galvanized material.

DECLARATION:

I hereby declared that the above said information is true to the best of my knowledge Thanking you

Yours faithfully

N.DEENADHAYALAN

t*6

c{.-xry t /

v

UKAS

PERSONNEL

CERTIFICATION

Certificate

of Proficiency

CSWIP CERT NO 108173

This is to certify that:

N Deenadhayalan

Date of birth 4 October 1987

has demonstrated proficiency as a BGAS-CSWIP Painting Inspector Grade 2 in accordance with CSWIP requirements published in Document BGAS- CSWIP-BG-22-12, 1st Edition, October 2015 and amendments in force on the examination date.

Date of issue 23 June 2016

Date of expiry 21 April2021

sisned t$Jl f,'-

(For CSWIP)

SIGNATURE OF HOLDE

(Person named above) Date

NEW EMPLOYERS SHOULD ALWAYS ASK TO SEE THE CERTIFICATE HOLDER'S TWI CERTIFICATION LTD IDENTITY CARD. AND VERIFY CERTIFICATE VALIDITYAT WWW.CSWIP.COM PLEASE READ THE NOTES OVERLEAF

Photocopies are unauthorised by

TWlCertification Ltd

lssued by:

TWI Certification Ltd, Granta Park, GreatAbington, Cambridge CB21 6AL, UK The use of the UKAS Accreditation Mark indicates accreditation in iesoect of those activities covered bv Accreditation Certificate No. 025 This certificate is the property ofTWl Certification Ltd and must be surrendered on request I

t6i

.-€

*

Certificate

of Proficiency

BS Eru ISO 17637:2011 Non-destructive testing of welds, visual testing of fusion-welded joints.

CSWIP CERT NO 112406

This is to certify that:

N Deenadhayalan

Date of birth 4 October 1987

has demonstrated proficiency in fusion welding inspection as a Welding Inspector in accordance with CSWIP requirements published in Document CSWIP-Wl-6-92, 13th Edition July 2015 and amendments in force on the examination date.

Date of issue 30 November 2016

Date of expiry 14 October 2021

/"\ /'

Signed t 'L€Lu'.'

(For CSWIP)

SIGNATURE OF HOLDE

(Person named above) Date

NEW EMPLOYERS SHOULD ALWAYS ASK TO SEE THE CERTIFICATE HOLDER'S TWI CERTIFICATION LTD IDENTIW CARD. AND VERIFY CERTIFICATE VALIDITYAT WWW.CSWIP.COM PLEASE READ THE NOTES OVERLEAF

Photocopies are unauthorised by

TWlCertification Ltd

lssued by:

TWI Certification Ltd, Granta Park, GreatAbington, Cambridge CB21 6AL, UK The use of the UKAS Accreditation Mark indicates accreditation iniespect of those'activities covered by Accreditation Certificate No. 025 This certificate is the property ofTWl Certification Ltd and must be surrendered on request I

N DEENADHAYALAN

WELDING INSPECTOR

Expiry Date: 14 10 2021

TWI Certification Ltd

Granta Park, Gt Abington

Cambridge, CE21 6AL UK

Tol: +44 (0) 1223 O99OO0

fhls cerat is tt e Noperly of TM Cadfftca4on Lld and hust be surrehderad q demand. il Is not vatid wilhout the ofilciat Cswlp ceftfice;":

- - - - "' '" *'"

-J

dl

TWI TWI lndia Pvt.Ltd.

No78 Chamiers Rd,

Nandanam,

Chennai,

6000 1 8

lndia

RECORD OF VISION TESTS

EX07 doc 2 (rev 3)

Name of individual tested: fV, DE E N R Di-t R y r). ri r..t Address: P(7 il-:, D,')fiPrnn -? i4 ll

lqg/l

Telephone:,;r1c1bb '\hL3sgAti' Dateof Birth: E':D'il oc-t ltlttl Email: .r h Emplo

0v\pl'yv\t'lq1 tlmc^(,t,rrn

BRiJnFr,t Sr.--Lir Tr,/Dr/JjAlL

j

Ihese /esfs meet the requirements of EA/ /SO 9712, NAS 410, EN 4719 and SNT-TC-IA Ihese fesfs are suitable for BGAS, PCN and CSWIP examinations. Near Vision Acuity

To be carried out for all candidates.

Individual shall be capable of reading N4 Times New Roman or Jaeger Jl on a standard reading test plate at a distance of not less than 30 cm unaided or corrected in at least one eye. UNCORRECTED V CORRECTED N IS NOT ABLE tr

Colour Perception

To be carried out on candidates who are using colour perception in in the testing e.g. NDT, Welding inspection, Painting etc. Colour perception shall be assessed by the lshihara 24 plate test. Individual shall be able to distinguish contrast between the colours used in the NDT method concerned as specified by the employer. lf misreading any of the first 17 plates is detected during the lshihara test, a fufther "trade test" is to be carried. The candidate's employer shall be informed where any colour deficiency is recorded ACCEPT REJECT tr

Shades of Grey Perception

To be carried out on candidates who are conducting tests using shades of grey e.g. Radiographic interpretation and TOFD etc. In specific cases the individual shall be able to differentiate shades of grey used in the NDT method

(e.9. radiography). lf any difficulty is observed, during this test, a further "trade test" is to be carried. Any observed difficulty shall be reported to the employer.

ACCEPT REJECT tr

Details of Medically

Organisation:

lfrmrl-

Name:

Recognised Person

S Teet,

Telephone number:

*1ta S3 Ca \4 36I

Registration or licence number:

Ea't rN ft'\

Date of test:

2E"o>,2.eil

fl6 61 .q A

q'yrs

S,

Officialstamp:

ASF! T B€vrNeR

Le.!eL ill

RT, uf /

Mi-r FT

rurc', 2zeJ23

t) {T

Tel: +91(0)444-***-**** Fax: +91 (0)44420.1957 0 E-mail:ac45k5@r.postjobfree.com www.twitraining. com _ €:c*tr>

BMQn

INSPECTION SERVICES

ISO 9OOI :2008

(ERTIFIED ORGANISATION

No : r5, Muthu illam, Abirami Nagar, SIDCO Industrial Estate - Post Madhukarai Main Road, I(urichy, Coimbatore - 2l

E mail : ac45k5@r.postjobfree.com www.brisndt.org

S.No: I FileNo:

Certificate issued to Mr.

SELF SPONSORED

DEENADHAYALAN.N

[a1_s_qqggpsfu lly completed Written and

demonstrated practical examination in

LIQU ID PENETRANT TESTING

Level II accordance with ASNT written Practice Document No. SNT-TC-IA 2011 ed., satisfactory Requirements Mentioned below,

@

This of

M/s.

$

Examination results

Examination

Score

Obtained

Fassinq

Minirntiln

General

82.50

7o.o o/o

Specific

65.UU

7o.o o/o

Practical

t.vu

7o.o o/o

Simple Average

Of.JU

8o.o o/o

Vision Acuity

)2

Color Vision

OK

Note : Vision Acuity Renewol required Annuolly by the ASNT NDT level - lll or by the 0phfiolmologist.

This certificate is issued to enable the employer to certify the individual as per their written practice Based to the requirements of SNT-TC-1A 2011 ed., St*:utLt gsr

Jh t*s"aufi Tfi Ai's,lL+tilt ilNBzT?z 1+- flsctice and further continuous experience and renewal

Candidate Name

MR DFFNADHAYAI AN.N

Certified in LEVEL - II

Certified Method LIQUID PENETRANTTESTING I

Technique N/A

Certification Issued 28-tt-2016 Certification Due 27-tt-2021 Work Experience 6 YEARS ln House Training

16 HRS

Academic Qualification B. E(EEE)

ASNT NDT Level III

CERT. NO: l2 - 0101

a-rD.

r, i t +.. 111.1 rll

^

i.-1.i: rf ia a,-t!r:i

NON.DESTRUCTIVE TESTING PERSONNET CERTIFICATION

RECORD

Nome: DEENADHAYATAN. N

Current Certificoiion Stotus: L_l Troinee f] Levet-t X levet-il f Levet-il Meihod: TIQUID PENETRANI TESTING

Technique: SOTVENT REMOVABLE - COTOR CONTRAST

Recertificotion Due Dote: Mqrch 30, 2018

Quolificotion Exominoiion Results:

This is to certify ihot fhe obove nomed Al Bowordi (BSl) employee hos sotisfoctorily met the quolificotion requirements of Written Prqctice, BSI WP- Revision Ol, qnd certificqtion procedure in occordonce with AsNT cp-, 89 (20,l led.)

(r!_n}

Dote : f{oW Lq - Lo lg

Printed Nome: Senthil Probhu.K Title: ASNT NDT level Xl (20414761 AL BAWARDTSTEEL TNDUSTRTES (BtS).

P.O, Box 112-, Dammam -31411, SaudiArabia