Resume

Sign in

Project Manager, Process Desgin Engineer, Chemical Engineer

Location:
Waterloo, Ontario, Canada
Posted:
April 13, 2018

Contact this candidate

Resume:

PROFESSIONAL SUMMARY

Certified PMP professional / Chemical Engineer serving the Energy portfolio, with proven credentials of managing projects and deliver within budget / time for facilities improvements, operations, regulation compliance and expansions in the Energy industry, Oil & Gas Refinery, Upstream Production, Water Treatment and Infrastructure.

SKILLS

Process Package (PFD / P&ID / H&MB / Datasheet)

Refinery & Upstream Operations

Program / Project Management

Engineering / Construction Management

Corporate Planning / Strategic Planning

Standards Conversance (API/ASME/NFPA/OSHA)

Pre-Commissioning & Commissioning

Process Design & Simulation

Process Hazard Analysis (HAZOP facilitation)

Energy & ISO Auditing

Human Resource Management

Mentorship

EXPERIENCE

PROJECT MANAGER • KUWAIT GULF OIL COMPANY (KGOC) • DEC. 2010 – NOV. 2017

Have represented Kuwait for its Assets Management in Oil / Gas production facilities of Neutral Zone between the countries of Kuwait & Saudi Arabia, to ensure its strategic interest such as Joint Operations (JO) Agreement development, Kuwait Sulfur Coordination Committee, Contracts Claims Management Team.

Spearheaded the Team to finalize 2040 Strategy, working with A.T.Kearney, to execute growth & sustainability projects i-e., Enhanced Oil Recovery (EOR), Steam & Water Flood projects.

Program Manager in Projects Review Committee to prioritize & recommend CAPEX budgets for approval of Strategic, Environmental & Economic High-ROI projects annually. Monitor & control approved projects for progress and completion (2017: 18 Major/minor projects $ 400 million).

Project Manager of GHG reduction project (USD 10 Million) to reduce Sour gas flaring & emissions to 50% from 65 % in 18 months, saving USD 16 Million/year to the State by its usage.

Engineering Manager of Pressure Maintenance Plant (PMP) Upgrade Project FEED for Produced Water Treatment to enhance capacity by 25% to 1.2 MMBWPD and meet treated water quality as per new K-EPA regulations for injection/disposal & steam production.

Responsibilities:

Conceived the project, completed conceptual design, selected the option, completed FEED, finalized scope of work and prepared tender document/Request for Quotation (RFQ).

Completed thru’ the Bid-Award cycle and managed the Contract, executed & commissioned safely & successfully under Budget, leading & mentoring a Team of 10 Discipline/Project Engineers from the Company and Contractors Team (85+ members – directly & indirectly).

Ensured safety of personnel in high H2S sour gas atmosphere with training, Standard Operating Procedures (SOP).

During design, prepared Process Design packages including PFD, new & redlining of P&IDs, process datasheet, evaluate vendor details, coordinate with other disciplines for final scope.

Managed the Contract within specifications, handled change orders, reviewed and approved deliverables with respective discipline Engineers, conducted Inspection of materials as per Test-Plan (ITP), coordinated with Operations for shutdown required for hook-up, completed hydrotest and installation of Cathodic protection of pipeline/equipment.

Developed plant start-up and commissioning procedure in coordination with JO Operations Team, created shift-logs formats, solved initial teething problems and stabilized the unit successfully in <90% of scheduled time.

PROCESS ENGR./ENGINEERING MANAGER•CHEVRON-KGOC JOINT OPERATIONS•OCT.2008–DEC. 2010

Projects Handled:

Main Gathering Centre Revamp (brownfield) Front End Engineering Design (FEED) M/s. AMEC, London-UK (20 MMUSD) and Project execution M/s. SKEC-SK (Cost 160 MMUSD).

Central Gas Utilization Project (greenfield) FEED M/s. Worley Parson, Manchester (30 MMUSD). Applied to World Bank as Clean Dev. Mechanism (CDM) project for GHG reduction (CER credits – carbon trading under Kyoto protocol).

Responsibilities:

Complied with Stage-Gate system from KGOC & Chevron (CPDEP) & secured AFE approval.

Finalized estimate, prepared request & obtained Final Investment Decision budget approval.

Managed the Project/Service-Order Management Plan (Cost & Time) approved for the EPMC.

Coordinated with all disciplines (process/mechanical/instrumentation/civil/structural/ electrical), resolved conflicts and ensured deliverables comply quality spec. and schedule.

Handled process equipment such as Floating & fixed roof tanks, separators, desalters, pumps, compressors, heaters, heat exchangers, flares, 3-ph separators during design & installation.

Recruited discipline engineers of PMC, processed Personnel Approval Form and tracked manhour estimates to monitor the Earned Value to control cost/time overrun.

Prepared and compiled Tender document (RFQ) including technical & contractual sections.

Responsible for completing tender cycle to award Contract including Bidders list finalization, Bid evaluation criteria, Technical evaluation, seeking approval from High Tender Committee.

Prepared MIS reports conveying key statistics to Stakeholders & maintained project risk register.

Complied with Operational Excellence (OE) Audits and Health/Environment/Safety (HES) process and procedures, Chevron Human Factor Engg. (HFE)/Safety-In-Design (SID).

Organize and lead Process Hazard Analysis (PHA) studies including HAZOP, QRA, FERA, EIA, PSSR, etc. with SMEs ensuring compliance with requirements of Stage-Gate checklist.

Done Phase-2 process simulation for H&MB, pipeline, flare (HYSYS, Flarenet, Pipenet, OLGA).

Reviewed & selected the contractors team for accomplishment of deliverables in time & quality.

Utilized ERP systems (MAXIMO & CMMS) for all phases of the projects.

SENIOR PROCESS ENGINEER•ORYX-GTL, QATAR (PAN MARITIME-CANADA) • APRIL 2008 – OCT. 2008

Coordinated the technology selection of 30,000 BPD diesel production Gas-To-Liquid (GTL) units in alliance with patent owner SASOL, South Africa.

Prepared Engg. packages & applied MOC on modifications for better performance of the units.

PROCESS ENGINEER•KNPC – MAA REFINERY• JUNE 2002 – APRIL 2008

KNPC-MAA is Asia’s 2nd largest Oil Refinery & Gas Liquefaction complex in which I have played the role of Projects-Process Engineer for the following major projects, from Aug. 2005 to April 2008

Execution: New Oil Pier Project for Crude & LPG Export (Hyundai, SK). Project cost: 345 MMUSD.

FEED: New Acid Gas Removal & Sulfur Production (Worley Parsons, UK). Project cost: 400 MMUSD.

FEED: Ethane Recovery Project (Hyundai, SK). Project cost: 470 MMUSD.

FEED: Fourth Gas Train Project (SKEC, SK), Project cost: 800 MMUSD.

Responsibilities:

Prepared Process Design Engineering Package including PFD, Heat & Mass Balance process simulations, P&IDs, Hydraulic calculations, Equipment selection & process specification, Flare & utilities load summary.

Have carried out design review for the upstream unit documentation for Booster station BS-171, Sour Gas Pipeline Network mechanical datasheet, process control and instrumentation datasheet.

Facilitated HAZOP and HAZID for the FEED packages to have clear scope for execution.

Prepared pre-commissioning / commissioning procedure and executed New Oil Pier including pipeline degreasing, drying, N2 flushing and HC cut-in, stabilization.

Implemented ISO 9001 for the division, coordinated for compliance and conducted audits.

Responsibilities as Refinery Process Engineer- Facilities for FCCU, Gasoil Desulphurization, Gas refrigeration, Acid gas removal, SRU, Tank farm & product loading at sea port (June 2002 to July 2005),

Review and support in CAPEX budget preparation of small and medium projects.

Have done Process Monitoring, Technical support, conducting RCFA, MOC, HAZOP, PSSR, process modification, corrosion monitoring of long distance pipelines.

Carried out evaluation of Molecular Sieve for Gas Dryers of Natural Gas Processing unit of KNPC-MAA Gas Plant and completed replacement for higher efficiency.

Prepared & secured Operating Expenditure budget including assessment catalyst/chemicals. & implementation such as Hydrogen Injection for Tail Gas Treatment unit, to meet the K-EPA spec.

Completed the implementation of EMS (ISO 14001) for the division.

DEPUTY MANAGER•CHENNAI PETROLEUM CORP. LTD.- MADRAS REFINERIES • MAR. 1992 – MAY 2002

Have been groomed in one of the Complex Refineries from Engineer - Operations to Deputy Manager – Process Engineering in Gasoil Desulfurization, FCCU, Sulfur Recovery, Crude dist. units

Project Engineer who commissioned of Grassroot Crude Oil Refinery & associated Sour Gas processing, Power/Utilities including Water Treatment, Steam generation units & Storage Tanks.

Prepared commissioning schedule & SOP, shift supervisors/DCS/field operators shift log.

Trained/mentored operators to Refinery Operations. Conduct annual performance appraisal.

Have conducted study by test run to increase capacity by 20,000 B/D for Crude unit, evaluated the adequacy of the product run down line, draw off nozzles size and implemented modifications.

Have increased the LPG product make (6-8%) by optimizing Stabilizer Reboiler in Crude Unit.

Conducted Root Cause analysis for technical issues of Fluidized Catalyst Cracking Unit, Lube & Wax Unit, Propane Deasphalting Unit to produce Bright Neutral Lube Oil Base Stock.

Increased energy conservation in crude unit by optimizing COT at heater outlet, after studying the quality of crude at site vis-à-vis design crude quality.

Introduced caustic injection at de-salter to reduce overhead chloride content in crude unit, thereby reducing corrosion chemical usage by 25% in overhead system.

As Engineer-R&D, developed alternate methodology for evaluation of Attrition resistance of FCCU catalyst and part of the zeolite catalyst development research & extraction pilot plants.

Executed Lube-oil extraction Pilot Plant for the successful testing chemical technologies.

ENGINEER TRAINEE•NUCLEAR POWER CORPORATION, RAWATBATA, INDIA• DEC. 1991 –MAR. 1992

Familiarization of Design standards, Operations Procedure and safety of Nuclear Industry.

ENGINEER R&D•GHARDA CHEMICALS LTD., MUMBAI - INDIA • AUG. 1990 – DEC. 1991

Pilot Plant testing by scaling up and executed test-runs, collected data justifying implementation.

Developed Engineering Design standards for new projects based on the international standards.

ACHIEVEMENTS

2016: Accomplishment of safe Crude transfer and received appreciation from CEO-KGOC.

2015: Ideal Employee of the Year conferred by CEO – KGOC for comprehensive performance.

2014: Appreciation from the Dy. CEO for completion of GFR pipeline within Budget & Time.

2010: Appreciation from GM-JO for completion of MGC Facilities Revamp & upgrade Project.

2007: Presented paper in International Technological Conference in American Society of Safety Engineers for use of ‘High Integrity Pressure Protection System’ to save Flare Upgradation cost.

2004: Appreciation from KNPC for Troubleshooting & Optimizing cost of MAA Refinery.

EDUCATION

Executive MBA• Ivey Business School, London-Ontario, Canada • June 2017 – Jan. 2019.

Chemical Engineering • Annamalai University, India • June 1986 – Aug.1990.

PROFESSIONAL CERTIFICATIONS & AFFILIATIONS

Certified Project Management Professional (PMP) - by PMI Pennsylvania, US (# 1860762).

Member of American Institute of Chemical Engineers (AIChE) & Kuwait Society of Engineers.

Registered for P. Eng. in Ontario (PEO), License # 100524187.