Sign in

Engineer Electrical

United Kingdom
January 09, 2018

Contact this candidate


Project Engineer Electrical, Seder Group Trading

and Contracting Company.


Riyadh, Saudi Arabia


Electrical Project Engineer


Oct 2017 to date Riyadh, Saudi Arabia

Support Senior Management with correct and accurate information where/when required.

Management of all the Technical Teams.

Assessment and reaction to Emergency situations.

Prepare, develop and follow Projects Implementation Plans.

Design and delivery of Technical Details to support Projects.

Provide advice to PMs regarding provision of Tools, Equipment’s & spare parts.

Develop and analyze Technical Specifications, Plans and Drawings.

Provide training, development and mentoring opportunities for the required manpower.

Conduct regular Evaluation and Assessment of the existing manpower.

Allocate Relevant Manpower to Projects including Numbers, Levels and Locations.

Provide Periodic Inspection Reports and assessments.

Co-ordination with Third Parties, Sub-Contractors and Suppliers.

Conduct Site Surveys. Prepare Snag Lists. Equipment Inspections. Consumables & Spare part list preparation. Material Approvals. Project follow-up, closure and de-commissioning.

Electrical Engineer Core Team, STC Project

SEDER Engineering

Feb 2016 to Oct 2017 Dammam, Saudi Arabia

Member of core team responsible for assisting, advising and supporting East Region STC MSTB Project as a specialist Electrical Maintenance Engineer.

Maintenance, Troubleshooting and Installation of Siemens Firefinder, Notifier and Simplex Fire Alarm control panel.

Maintenance, Troubleshooting and installation of Siemens XC-10 Fire suppression (FM200) control panel.

Maintenance and troubleshooting of siemens BMS, HVAC control, damper actuator control, generator and fire alarm control.

Maintenance, Troubleshooting of TornaTech, SFFECO, HEBA and LIFECO Fire Pumps.

Maintenance & troubleshooting of Cummins, CAT, Deutz and Kohler Power Generators

Maintenance & troubleshooting of Cummins, ASCO, Kohler and Intergen ATS panels.

Maintenance and Troubleshooting of Power Panels and Control Panel.

Electrical and Instrumentation Engineer

Ismail Industries Limited

Jul 2011 to Jan 2016 Lahore, Pakistan

Incharge of Maintenance department & supervising the Staff of 12 Officials.

Maintenance & troubleshooting of PLC based vertical fill packing machines, multi head weighers and horizontal motion conveyors.

Extensively worked on Atlas Copco Air Compressors, HANKOF Nitrogen Generation Plant, Weishaupt Burner (Oil Heater), single phase and 3 phase motors, Inverters (VFD), 1100 KVA PERKINS Diesel Generator, 1000KVA switchgear and Power factor.

Mitsubishi, Delta and Siemens PLC programming.

Electrical Power and Control Panels designing & troubleshooting.

Prepared plans and layouts for equipment arrangements and space allocation.

Coordinated with vendor to successfully complete installation and commissioning of Thermal Oil Boiler. Includes Making BOQ, Comparative statements, Layouts, Execution, Electrical and control wiring.

Performed load calculation for cable sizing and circuit protection.

Prepared and implemented electrical and mechanical Preventive maintenance schedules and procedures for all machines.

Introduced and successfully implemented computerized maintenance management software (CMMS) and reduced the down time.

Made breakdown and preventive maintenance databases and generated monthly and annual reports.

Replaced the servo motor based horizontal motion conveyor with induction motor and inverter.

Automation of chips seasoning system.

Trainee Engineer (Electrical)

MAH Plastic Industries Ltd.

Sep 2009 to Jul 2011 Lahore, Pakistan

Maintenance and Troubleshooting of PLC based Injection Molding Machines.

Maintenance and Troubleshooting Electrical power and control panels.

Maintaining daily maintenance reports and log books.

STC MSTB Project

Feb 2016 to Oct 2017 East Region, KSA

Maintenance services of STC technical buildings, exchanges and GSM sites.

Rehabilitation of Fire Alarm System STC

Dec 2016 to Oct 2017 East Region, KSA

Installation of new Siemens Fire Alarm and FM200 Fire suppression system.

Installation of Generator and ATS

Jan 2016 Lahore, Pakistan

Installation and commisioning of cummins 1100 KVA power generator and ATS panel.

Thermal Oil Boiler Installation

Aug 2015 Lahore, Pakistan

Installation, testing and commisioning of thermal oil boiler, Making BOQ, Layouts, P&I diagrams

Installation of Packing Machines

Feb 2015 Lahore, Pakistan

Installation and commisioning of 6 vertical forming, filling and sealing (VFFS) packing machines along with weighers and horizontal motion conveyors.


Project Management (PMP)

Primavera P6

PLC Programming

CMMS (WFMS, MP, Maximo)

Industrial Automation

Instrumentation and Control

MS Office

Expert in Maintenance & Troubleshooting:

Power Generators and ATS

Fire Alarm and FM200 system

LV switchgears and ACB

DDC and control panels

AC motors and AC motor drives (VFD)

Servo motors and servo motor drives

Packaging machines and conveyors

Air compressors

Pneumatic control

CCTV cameras


Project Management Professional (Lic. No. 2117395)

ISO 22000 (2005) Training

Fire Protection Training

PLC Programming

Siemens Fire finder training


Project Management Institute, USA (No= 4481734)

International Society of Automation

Saudi Council of Engineers

Pakistan Engineering Council


English = Expert

Arabic = Beginner

Urdu = Native


Project Management

Instrumentation & control

Maintenance management


BS in Electronic Engineering,

International Islamic University,

Jul Sep 2005 to Jan 2009 Islamabad, Pakistan

Fsc Pre Engineering,

Fazaia Model Inter College Sargodha

Apr 2003 to Mar 2005 Sargodha, Pakistan


Fazaia Model Inter College Sargodha

Apr 2001 to Mar 2003 Sargodha, Pakistan

Contact this candidate