Resume

Sign in

Operations Manager / Project Manager

Location:
Quezon City, National Capital Region, Philippines
Posted:
January 08, 2018

Contact this candidate

Curriculum Vitae

Position :

PERSONAL DATA

Name : SAMUEL B. MAGANA

Sex : Male

Birthdate : October 5, 1966

Birthplace : Daet, Camarines Norte

Address : Blk 50 Lot 5 Villa Luisa Subd., Bagumbong, Caloocan City

Province : Talisay, Camarines Norte

Telephone No. : +632-*******

Mobile Phone No. : +639********* / +639*********

Nationality : Filipino

Height : 163 cm

Weight : 60 kgs

Religion : Roman Catholic

Civil Status : Married

Email address : ac3yh6@r.postjobfree.com / ac3yh6@r.postjobfree.com

EDUCATIONAL ATTAINMENT

Primary : Chung Hua High School

1973-1979

Secondary : Chung Hua High School

1979-1983

College : Polytechnic University of the Philippines

1983-1988

B.S. Civil Engineering

GOVERNMENT EXAMINATION TAKEN

Professional Regulation Commission-Civil Engineer Licensure Board Examination

Passed with a rating of 70% last October 16, 1989 in Manila, Philippines

SEMINAR ATTENDED

8th Consultative Seminar-Workshop on Planning, Design & Construction of Low Cost Medium Rise Housing-National Housing Authority / Japan International Cooperation Agency

City of Spring Resort, Los Baños, Laguna, Philippines

November 26-29, 1996

Primavera for Construction Project Management Seminar

Crescent Technologies, Suite 501 Don Lorenzo Building, 889 P. Paredes St., Manila

July 27-August 10, 2008

Construction Project Management Seminar

Construction Manpower Development Foundation, DTI Building, Sen. Gil Puyat Ave., Makati

August 13-15, 2008

Construction Occupational Safety & Health (COSH) 40 Hrs Seminar

Synerquest Management Consultancy Services, Inc., 7th Floor Filinvest Bldg., EDSA

Mandaluyong City

September 9, 16, 23, 30 & October 7, 2015

Accredited Pollution Control Officer (PCO) of Laguna Lake Development Authority (LLDA)

Seminar attended June 22 to 24, 2016 at Camelot Hotel, Mother Ignacia Avenue, Quezon City

Accredited Pollution Control Officer (PCO) of Department of Environment and Natural Resources

(DENR) seminar attended November 15 to 17, 2016 at Tagaytay Country Hotel, Olivarez Plaza,

Tagaytay City

PROFESSIONAL AFFILIATION

Philippine Institute of Civil Engineers-First Quezon City Chapter, Member

Polytechnic University of the Philippines Alumni Association, Lifetime Member

WORK EXPERIENCE

Company/Position Inclusive Dates Nature/Scope of Work Assignment

1. Intecore Development Corporation August 2016-present manage & coordinate construction

Operation Manager Activities with the clients and LGU

For the smooth flow of the work activities on time within budget &

Quality workmanship constantly monitor the status of planning,

Safety, health & environment issue

Of the project

2. Filinvest Land, Inc. May 2009-July 2016 Organize & coordinate construction

Project Technical Head Activities in accordance with const-

Ruction schedule so as to complete

The work on time & within budget

while constantly monitoring the

The status of planning, safety, envi-

ronment & quality activities.

3. Ascendas E-Square Properties Corp. May 2008-Apr. 2009 Manage the coordination of design

Construction Manager & construction activities to include

But not limited to architect, con-

Project Assignment tractor & consultant solicitation

Ascendas IT/Office Building (G+25 Floor) & selection, design & construc-

Cost: US$ 15 M tion document review, construc-

tion management & administration

4. ALUMINUM TECH. AUXILIARY IND. Sept.2006 to Sept.2007 Responsible for the over-all

Project Manager management of the whole

Project including cost control

Timely completion and effective

utilization of project Personnel.

Project Assignment

Al Seal Residential Tower (B+G+30 Floor+Penthouse)-Cladding & Curtain Wall-Doha, Qatar

Cost: US $ 4.5 M

5. MRI CONSTRUCTION, INC. Apr 1997 –April 2006 Responsible for the construction Construction Manager control of all the on-going works to ensure efficient project implementation in terms of cost, time & compliance with the Project Assignment approved plans and specifications.

Site Development & Construction of Housing units Establishes the operational at Heritage Homes Marilao, Phase 6 systems in the assigned project to Marilao, Bulacan allow effective & efficient

movement & utilization of

Site Development of Metrogate Complex resources in the said area.

Phase 5,6,7 & Commercial Area Ensures that all transactions in the

Meycauayan, Bulacan field and dealings with contractors, equipment lessors & suppliers are

Construction of Metroview Ridge Estates Clubhouse done with the highest degree of

Sumulong Hi-way, Antipolo City professionalism & in a manner

favorable to the interest of the

Site Development of Metrogate Silang Estates Phase 3, 4 company.

& 6, Construction of Clubhouse, Swimming Pool, Driving

Range, Children Playground & High End Residential

Site Development of Villa Caceres Estate Phase 1, 2, 3,

Commercial Area, Clubhouse, Tennis Court, Basketball

Swimming Pool & High End Residential Housing

Sta. Rosa Laguna

Site Development of Metrogate Sta. Rosa Phase 3 &

Construction of High End Residential Housing

Sta. Rosa, Laguna

Site Development of Metrogate Tagaytay Estates Ph. 3 &

Construction of High End Residential Housing

Tagaytay City, Cavite

Construction of Elevated Steel Water Tank 60,000 gals

Capacity at Metrogate Silang Estates

Silang, Cavite

Construction of Elevated Steel Water Tank 60,000 gals

Capacity at Villa Caceres Estates

Sta, Rosa, Laguna

Construction of Elevated Steel Water Tank 40,000 gals

Capacity at Heritage Homes Marilao

Marilao, Bulacan

Construction of Elevated Concrete Water Tank 20,000 gals

Capacity at Metroview Ridge Estates

Antopolo City, Rizal

6. JOCAS BUILDERS & CONST. May 1995-Dec 1996 Responsible for the overall Project Manager management of all vertical and horizontal projects of the Project Assignment: company. Work closely with the Construction of Pahanocoy project owners & company’s Drainage System project engineers to ensure the Pahanocoy, Bacolod City attainment of project objective in Cost: P3.8 Million terms of profitability, cost efficiency, optimization of Land Development of Daet resources & service delivery Resettlement Project (Finished) within committed timetables. Alawihao, Daet, Camarines Norte

Cost: P16 Million Responsible for the strict implementation of quality, safety Construction of Mega-Power Metalwood standards, & operational policies Corporation Factory Building (Finished) of the company.

Bagbagin, Caloocan City Check progress of works, revenues Cost: P 5.7 Million & costs, billing and collections of the projects.

Participate in the business development effort of the company.

Supervises the planning activities

for all the projects.

Synchronizes the activities of the

projects so that the resources of ` the company are utilized to the fullest. Provides assistance & guidelines

to the project personnel.

7. JODY KING CONSTRUCTION May 1992-Feb 1995 Monitors field operations and

& DEVELOPMENT CORP. make sure all project requirements

Project Engineer is provided on time to accomplish the work in full compliance with Project Assignment: plans, specifications, contracts, Land Development of Area A budgets, schedule and company Phase I, Sapang Palay Resettlement policies.

Project (Finished) Provides technical assistance to San Jose Del Monte, Bulacan field engineers and foreman and Cost: P6.1 Million check their respective activities.

Check the works of the sub- Construction of Puregold Duty Free, Inc. contractors and recommends Building Clark Field, Angeles City, Pampanga payment of their billings.

Cost: P42 Million

Partial Development of Area B Organizes labor force required for

Phases A & B (Finished)

Sapang Palay, San Jose del Monte, Bulacan Mobilizes manpower and Cost: P 11 Million equipment necessary for the project.

Prepares work schedule,

PERT/CPM, bar chart, and S-curve

Review plans, drawings & specifications & ensures that it is properly & strictly implemented as per contract.

Coordinates with project consultants/representatives & discusses problems encountered for immediate resolutions.

8. ROMAN BUILDERS CORP. June 1990-March 1992 Supervises the construction of

Project Engineer various infrastructures and residential housing projects.

Project Assignment: Prepares bill of materials and Earthquake Victim Resettlement Project(Finished) order list according to priorities.

Dagupan City Coordinates with the owners and Cost: P11 Million project inspectors to resolve problems encountered.

Land Development of Tuba Ensures the timely completion of Resettlement Project (Finished) the projects as per plans and Tuba, Benguet specifications.

Cost: P20 Million

Temporary Resettlement Project for

Mt. Pinatubo Victim(Finished)

Camp Aquino, Tarlac, Tarlac

Cost: P8 Million

Land Development of Busay Sites and

Services Project(Finished)

Busay, Cebu City

Cost: P28 Million

Liberty Farms Upgrading Project,

Package III (Finished)

Sitio Gumaoc, San Jose Del Monte, Bulacan

Cost: P20 Million

Land Development & Construction of

Kalikasan Hills Townhomes(Finished)

Bagumbong, Caloocan City

Cost: P28 Million

9. R.T.G. CONSTRUCTION, INC. April 1989-April 1990 Conduct ocular surveys and site

Cost/Office Engineer investigations on proposed project sites.

Project Assignment: Prepares detailed estimates of all Philippine Medium materials needed for the proposed Scale Irrigation Project(Finished) project.

Narra, Palawan Prepare bid documents and Cost: P25 Million budgetary estimates of incoming projects.

10. MEGATECH DESIGNER & June 1988-March 1989 Assist the Project Engineer in the

CONSULTANT INTERNATIONAL supervision of the construction Civil Engineer Aide operation.

Attend to the technical problems

Project Assignment: encountered during the project

EVEREADY Battery implementation. Administration Office(Finished) Review plans & specifications &

Mandaluyong, Metro Manila ensures that it is properly Cost: P15 Million implemented.

Evaluate contract billing report.

CHARACTER REFERENCES

Name Address Telephone No.

1. Engr. Dante V. Malana 57 East Riverside 092********

San Francisco Del Monte

Quezon City

2. Engr. Ramon J. Reside 8 Matthew St. 099********

Doña Carmen Subdivision

Fairview, Quezon City

3. Engr. Ricardo C. Boco. Heritage Homes Marilao 099********

Marilao, Bulacan

Submitted by:

SAMUEL B. MAGANA

Civil Engineer

PRC No. 56687

EMPLOYMENT HISTORY

SAMUEL B. MAGANA – Senior Project Manager

I.INTECORE DEVELOPMENT CORPORATION-Scout Limbaga, Quezon City

-Top notch contractor of vertical and horizontal project including fit out, feasibility study and design of project including project management of project

A.Operations Manager (August 2016 to present)

oManage the over-all project of the company from the bidding process to implementation, point person in talking to the local/national government officials for the required permits of the project.

II.FILINVEST LAND, INC.-Mandaluyong City

-Developer of high end & middle end residential subdivision, township, commercial areas, medium rise building & high rise building.

A.Project Technical Head (May 2009-July 2016)

oManage the efficient operation of the project to its inception up to its completion & control expenditure & revenue to maximize its profitability to satisfy the clients as well as the developer.

III.ASCENDAS E-SQUARE PROPERTIES CORP.- Fort Bonifacio, Taguig City, Philippines

- High end office tower & industrial space business provider catering multinational companies.

A. Construction Manager (May 2008-April 2009)

oManage the successful completion and close-out of the construction project to assure tenant occupancy and rent commencement by required dates

IV.ALUMINUM TECHNOLOGY AUXILIARY INDUSTRIES-Doha, Qatar

-Curtain wall and aluminum cladding panel contractor including steel structures, stainless steel structures, doors and windows.

A. Project Manager {Sept 2006 –Sept.2007}

Planning, scheduling, monitoring, and supervision of on-going project; review plans and evaluates reports and billings; Establishes operational and control systems; Coordination with management, contractors, consultant and suppliers. Closely monitor the actual cost control of the project and its timely completion. Coordinate with the factory the fabrication of materials for the whole project.

V.MRI CONSTRUCTION, INC. (MCI)

-General Contractor which specializes in Land Development works for subdivision including waterlines, drainage system, roads, water reservoir, medium rise housing, single storey housing, and amenities such as construction of Clubhouse, golf driving range, swimming pool, park & recreation area.

A.Construction Manager {April ’97 – April 2006}

Construction planning, scheduling, monitoring, and supervision of on-going project; reviews and evaluates plans, specifications, reports and billings; Establishes operational and control systems; Coordination with management, contractors and suppliers.

VI.JOCAS BUILDER & CONSTRUCTION

- General Contractor which specializes in Land Development works for subdivision including waterlines, drainage system, roads, water reservoir, medium rise housing, single storey housing, high rise building & construction of steel structures such as warehouses and industrial factories.

A.Project Manager {May ’95 – December ‘96}

Project planning and scheduling; Supervises operation in the field; Prepares the daily accomplished report; Evaluates the progress of the on-going project; Prepares the billing to be collected for the accomplished period; Attends coordination meeting with the agency concern regarding the project operation; Prepares bid documents and budgetary estimates of the incoming projects.

VII.JODY KING CONSTRUCTION AND DEVELOPMENT CORPORATION

-General Contractor which specializes in Land Development works for subdivision including waterlines, drainage system, roads, water reservoir, medium rise housing, single storey housing, high rise building and commercial center

A.Project Engineer {May ’92 – February ‘95}

Project planning and scheduling; Supervise earthworks operation in the field; Prepare shop drawings needed; Estimates the required materials needed; Prepares daily accomplishment report; Evaluates the progress of the on-going project; Prepares bid documents and budgetary estimates of incoming projects.

VIII.ROMAN BUILDERS CORP.

-General Contractor which specializes in Land Development works for subdivision including waterlines, drainage system, roads, water reservoir, medium rise housing and single storey housing.

A.Project Engineer {June ’90 – March ‘92}

Project planning and scheduling; Prepare Daily Accomplishment report; Evaluates progress of the on-going project; Prepare the billing to be collected for the accomplished period; Attend coordination meeting with the agency concern regarding the project operation; Prepare bid documents and estimates of incoming projects.

IX.R.T.G. CONSTRUCTION, INC.

-General Contractor which specialize in horizontal constructions such as dams, bridges, irrigations, roads and airport.

A.Cost / Office Engineer {April ’89 – April ‘90}

Project planning and scheduling; Evaluate the progress of the project.

Prepare the billing to be collected for the accomplished period; Earthworks quantity take-off preferably cut and fills; Prepare budgetary estimates of the project.

X.MEGATECH DESIGNER AND CONSULTANT INTERNATIONAL

- Consultancy firm engage in the design of High Rise Building, steel structures and other civil works.

A.Civil Engineer Aide {June ’88 – March ‘89}

Supervise and inspect on-going project; Evaluate contracts billing report; Prepare the daily accomplishment report; Prepare structural calculation & shop drawings needed.



Contact this candidate