Resume

Sign in

Project Engineering

Location:
Philippines
Posted:
January 05, 2018

Contact this candidate

Resume:

OMAR TAMIAN LAPODE

Zone *, Lumbia, Cagayan de Oro City

Mindanao, Philippines

Contact No.

+639*********(Philippines No.)

POSITION APPLIED: Land Surveyor

EDUCATIONAL ATTAINMENT

COLLEGE : Cagayan de Oro College

Cagayan de Oro City,Philippines

COURSE : Bachelor of Science in Geodetic Engineering

GRADUATED : May 31, 2001

SECONDARY : Our Lady of Perpetual Help Academy

Linamon, Lanao Del Norte

(Mindanao)Philippines

GRADUATED : March 1995

ELEMENTARY : Samburon Elementary School

Samburon, Linamon, Lanao Del Norte

(Mindanao), Philippines

GRADUATED : March 1991

SKILLS : Land surveying. Instrument used:

Total Station TOPCON, LEICA, SOKKIA, GPS and Auto Level.

COMPUTER

LITERATE : Auto Cad, 2D and 3D modeling

MicrosoftWord

EMPLOYMENT RECORDS

1.) INCLUSIVE DATE : September 26, 2016 to August 16, 2017

COMPANY : MIESCOR (Meralco Industrial Engineering

Services Corporation)

ADDRESS : 5/F Renaissance Tower 1000, Meralco Avenue

Pasig City, Metro Manila, Philippines

P.O. Box, Ortigas Center, Pasig City 1657

FIELD OFFICE : Lingi-on, Manolo Fortich

POSITION : Land Surveyor

NAME OF PROJECT : 138 KV Lingi-on Switchyard and Transmission

Line Project

DUTIES AND

RESPONSIBILITIES : Securing all data of surveys (Horizontal and Vertical) that are accurate and reliable in executing for the future development into the actual area.

Securing the proper execution of the References (Bench Mark) if it is not disturbed and it should be within its proper location.

Proper execution of the project as per Plan into the actual field.

2.) INCLUSIVE DATE : July 25, 2013 to March 09, 2016

COMPANY : ALRABIAH CONSULTING ENGINEERS

ADDRESS : P.O. Box 9967, Dammam 31423,

Saudi Arabia

Tel #: (03)8279737- Fax: (03)8279738

FIELD OFFICE : Al-Udaid, Saudi Arabia

POSITION : Surveyor (Consultant)

NAME OF PROJECT : Al-Udaid Exit Project

DUTIES AND

RESPONSIBILITIES : Supervising survey works, horizontal and vertical. Reviewing Sketch Plan provided by the Contractor to be secured all data are available for the basis purposes to be reliable in applying into the actual area.

Securing the proper execution of the References (Bench Mark) if it is not disturbed and it should be within its proper location.

Supervise the proper layout of coordinates of every corner of the boundary of the Project. And also the application of its elevation according to its designed as an approved plan.

3.) INCLUSIVE DATE : June 27, 2010 to February 23, 2013

COMPANY : PROJECT HOUSE FOR ENGINEERINGCONSULTING

Design-Studies-Supervision-Construction

Management

ADDRESS : Riyadh 11489-King Fahad Road,

Kingdom of Saudi Arabia.

P.O. Box No. 39914. Tel No. 2726444.

Fax No. 2722555

FIELD OFFICE : Consultant Office,Saudi Company for

Developing Construction and Projects House for Engineering Consulting

POSITION : Surveyor (Consultant)

NAME OF PROJECT : SAMTAH HOUSING PROJECT

DUTIES AND

RESPONSIBILITIES : Supervisethe proper layout ofcoordinateof every corner of the boundary of Land Location of the Project.The relativity of center line of theexisting roads to its Tender Drawing if it is matches.And also the application of its Elevation according to its designedas per approved plan or Drawing.

4.) INCLUSIVE DATE : March 31, 2006 to March 9, 2008

COMPANY : DODSAL Engineering and Construction Pte Ltd.

ADDRESS : Industrial City, RasLaffan,State of Qatar

P.O. Box No. 60813Tel: 974-***-****

Fax: 974-***-****

POSITION : Instrument Man to Surveyor

NAME OF PROJECT: RAS GAS ONSHORE EXPANSIONPROJECT-2

DUTIES AND

RESPONSIBILITIES : Executing the proper layout of coordinate

for every corner of thebuilding,andalso the execution of its elevation according to thedesigned as per approved plan.Securing the perpendicularitiesof the Vessels erection.

5.) INCLUSIVE DATE : June1, 2001 to march 15, 2006

COMPANY : M2 Surveying Office and Engineering Services

ADDRESS : 974-B Quezon Avenue, Barrio Naga,Marawi City

(Mindanao) Philippines

POSITION : Survey Man (Surveyor)

NAME OF PROJECT: Relocation, Subdivision and Road Widening

Department of Environment and NaturalResources

Department of Public Works and Highway.

DUTIES AND

RESPONSIBILITIES : Computing the technical descriptionfor a certain

Lot Area to ensurethe accuracy of its execution into the actual area. Gather data, projecting and locating the coordinates ofthe corner and boundary.

Relocate all the concern points and check if it is disturbed or not.

Plotting and mapping.



Contact this candidate