Samuel William GABRA ROPHAIL

Egypt

Alexandria

Phone: 002***********

Email: ******.*******@*****.***

OBJECTIVE A challenging position in a multinational corporation whereby

My interpersonal, analytical, and creative skills as well as me

Academic Background could be utilized and developed

EDUCATION

2001 Bachelor of Civil Engineering (Construction), Faculty

Of Engineering, Benha university, GPA: 70 % (Good Plus)

PMP Certified

2015 Certified Project Management Professional

PMP Number 1880253

PMP original Grant Date 14 December 2015

2014 PMP Preparation Course of Project Management Body of

Knowledge (PMBOK Guide) in AMIDEAST Alexandria,

2016 Risk Management Course, PMI Registered Education

Provider.

2008 Studying the occupational safety and health administration

(OSHA) course in American University (Cairo, Egypt)

CAPABILITIES Project Management skills according to PMBOK, Construction

Supervision, Project scheduling, preparation of site work

Instructions, Contractors Claims, estimates and forecast for

Laborer and material requirements, Mentoring and motivating

For Engineers and Labor work at Site, understanding for

Team Building activities and stages.

Relevant Courses: Methods & equipment for construction, Construction management & planning, Contracts & reinforcement Concrete & steel & soil mechanics & law, Quality control, cost estimation, Elect. & mech. Installation, Eng. Economy, Environmental & sanitary Eng., Energy in buildings

Graduation Project – Group

Design of reinforcement concrete for:

high riser building under earthquake and wind load effect (Raft foundation, flat slab, and core piles)

Industrial storage frames, Meeting Hall, Football Stadium

Position Project Manager / Construction Manager

WORK EXPERIENCE 15/01/2016 – Present

Consolidated Contractors Company (CCC), Qatar

Kahramma (Client)

Main Consultant (PMC)

Supervision Consultant (Hyder Consulting)

Mega Water Reservoir Project – Package C -

Position: Construction Manager for Reservoir # 1,

The project consists of (5) Mega water Reservoirs, and I am

Responsible for Civil Works in Reservoir#1, Total Area

Is (40300 m2), and the reservoir content of (125000 m3) R.C.,

And (35000 Ton) Steel Reinforcement,

I Manage for Civil Reservoir team; The Team consist of (2 Section

Engineer + 3 Site Engineer + 5 Junior Site Engineer + 8 G.F. +

8 supervisors + 400 Skilled and unskilled Laborer)

I have commitment to implement the Schedule for the

Reservoir, and define & Request for all Requirements and

Forecasts to Reservoir # 1, and define

The Reservoir (Manpower & Equipment & Materials)

And Addressing for Site Problems, and Schedule Critical paths

And I attend for Management Meetings, and Discuss for the

The Reservoir Requirements and Constraints, and Providing

For Actual and Practical Plans and Solutions.

23/01/2014 – 14/01/2016

ORASCOM Saudi Company

Lafarge (Al Safwa) Cement Project / Line 02 in KSA

Working Construction manager for Cement Area (Cement

Silo & Cement Mills & Cement hopper feed Building)

I define and record Cement area requirements, constraints &

Assumptions with stakeholder to establish the project

Deliverables, I Manage proactively the resource allocation by

Ensuring that appropriate resources and tools are assigned,

Execute the tasks defined in the project plan to achieve

The project goals, Measure My area performance using

Appropriate tools and techniques,

Verified the final deliverables in my area,

I was managing for (4) Site Engineers and 8 supervisors,

And (160) skilled and unskilled Labor,

The Formwork system for Silo was Slip formwork, The formwork

For columns and Slabs was Acrow.

Polysius S.A.S is the Consultant

23/01/2012 –22/01/2014

Dar Al-handasah (Angola)

(Shair and Partners)

Working as a senior civil engineer in dar Angola, Zaire province,

The project is infrastructure (sewerage, water supply, telecom, M.V. electrical, and L.V. electrical, asphalt roads), the budget of the

Project about (70) million US$,

Develop the project charter and review it with key stakeholders,

Obtain project plan approval from the client and conduct a kick off

Meeting with all key stakeholders, Implement a quality

Management to ensure that work is being performed per

Required quality standards, Obtain financial legal and

Administrative project closure (e.g. final payments, warranties,

Contact sign off)

I was cooperating with the Main Contractor to Teach them how to

Executing the work, because they were had a lack for experience

And the skills to perform the activities, I act as Project Manager

For the contractor per our project management office

(PMO) Instructions for my Company.

01/02/2008 – 22/01/2012

BESIX– ORASCOM J.V.

Working as a senior site engineer in project Aldiyar Al-qataria (stage 1), in Nile cornice (Cairo – Egypt)

The project contains (937) core pile, and diaphragm wall, and dewatering system, and raft foundation, and (4) floor parking under the ground, the subcontractor company for piles and diaphragm works is BAUER (Egypt),

The pile diameter is (100 cm) and the depth is (41.0 m), the load test for the pile is (120) ton, and the diaphragm wall panel width is (80 cm), and depth (28.0 m),

I was responsible of Zone (A) of the site including the piles and diaphragm wall, and after the raft foundation and all the skeleton works for Zone (A).

Working as a senior site engineer in project Borg Al-Arab International Airport for Administration Building from Skeleton stage until finished all finishing Items.

The Building floor area is 2000 m square, and the building was

Three floor and upper roof,

The Finishing Items in the Building consist of (Granite flooring,

Marble facades, false ceiling, H M door frames, Aluminum

Windows and Curtain wall, Putty, and Painting)

01/07/2005 – 31/01/2008

SAMSUNG/SAMCRETE J.V.

The American university in new Cairo, New Campus Project

Working as a site engineer/senior engineer in Parcel (8),

Economic college (BEC Building), I finished the remaining

Of the skeleton works, and after that all the finishing items until

Completion for the building and handle off to the client, also

Prepare for the follow up reports, and put for the actual plans to

Catch the schedule progress, and prepare for the materials and

Manpower reports.

Monitoring and Controlling for Subcontractors in parallel with

Direct Manpower activities.

25/07/2001 – 30/06/2005

Alfa Construction Company (Cairo, Egypt)

Construction for officer`s hotel (Alexandria, Egypt)

Working as a site engineer, responsible for site skeleton works, and after that all finishing items works, until completion for the

Building and handle off to the Client.

The building consists of Ground floor + 10 floors,

The building foundation was Continuous Flight Auger (CFA) piles.

Working as site engineer in San Stefano project, in Alexandria

We were one of the Subcontractors for Skeleton,

The part we were performing consists of post tension slab.

The Slab consist of cables insert into Aluminum ducts according

To the shop drawings, and Anchors plus steel rebar’s.

After 5 days from pouring we were tension final tension, and

After that removed for Formwork.

TECHNICAL SKILLS Software packages: AutoCAD 2000, SAP2000, Windows &

Office XP.

LANGUAGES English: Excellent Arabic: Excellent Portuguese: Very Good

TRAVELS South Africa, South Korea, Qatar, Malaysia, Dubai, Angola, KSA

PERSONAL DATA Date & Place of Birth: 18/10/1978, Alexandria

Nationality: Egyptian

Marital Status: Married

Driving license: Valid Egyptian driving license

Valid Saudian driving license

Military Status: Exempted

References furnished upon request