Samuel William GABRA ROPHAIL
Egypt
Alexandria
Phone: 002***********
Email: ******.*******@*****.***
OBJECTIVE A challenging position in a multinational corporation whereby
My interpersonal, analytical, and creative skills as well as me
Academic Background could be utilized and developed
EDUCATION
2001 Bachelor of Civil Engineering (Construction), Faculty
Of Engineering, Benha university, GPA: 70 % (Good Plus)
PMP Certified
2015 Certified Project Management Professional
PMP Number 1880253
PMP original Grant Date 14 December 2015
2014 PMP Preparation Course of Project Management Body of
Knowledge (PMBOK Guide) in AMIDEAST Alexandria,
2016 Risk Management Course, PMI Registered Education
Provider.
2008 Studying the occupational safety and health administration
(OSHA) course in American University (Cairo, Egypt)
CAPABILITIES Project Management skills according to PMBOK, Construction
Supervision, Project scheduling, preparation of site work
Instructions, Contractors Claims, estimates and forecast for
Laborer and material requirements, Mentoring and motivating
For Engineers and Labor work at Site, understanding for
Team Building activities and stages.
Relevant Courses: Methods & equipment for construction, Construction management & planning, Contracts & reinforcement Concrete & steel & soil mechanics & law, Quality control, cost estimation, Elect. & mech. Installation, Eng. Economy, Environmental & sanitary Eng., Energy in buildings
Graduation Project – Group
Design of reinforcement concrete for:
high riser building under earthquake and wind load effect (Raft foundation, flat slab, and core piles)
Industrial storage frames, Meeting Hall, Football Stadium
Position Project Manager / Construction Manager
WORK EXPERIENCE 15/01/2016 – Present
Consolidated Contractors Company (CCC), Qatar
Kahramma (Client)
Main Consultant (PMC)
Supervision Consultant (Hyder Consulting)
Mega Water Reservoir Project – Package C -
Position: Construction Manager for Reservoir # 1,
The project consists of (5) Mega water Reservoirs, and I am
Responsible for Civil Works in Reservoir#1, Total Area
Is (40300 m2), and the reservoir content of (125000 m3) R.C.,
And (35000 Ton) Steel Reinforcement,
I Manage for Civil Reservoir team; The Team consist of (2 Section
Engineer + 3 Site Engineer + 5 Junior Site Engineer + 8 G.F. +
8 supervisors + 400 Skilled and unskilled Laborer)
I have commitment to implement the Schedule for the
Reservoir, and define & Request for all Requirements and
Forecasts to Reservoir # 1, and define
The Reservoir (Manpower & Equipment & Materials)
And Addressing for Site Problems, and Schedule Critical paths
And I attend for Management Meetings, and Discuss for the
The Reservoir Requirements and Constraints, and Providing
For Actual and Practical Plans and Solutions.
23/01/2014 – 14/01/2016
ORASCOM Saudi Company
Lafarge (Al Safwa) Cement Project / Line 02 in KSA
Working Construction manager for Cement Area (Cement
Silo & Cement Mills & Cement hopper feed Building)
I define and record Cement area requirements, constraints &
Assumptions with stakeholder to establish the project
Deliverables, I Manage proactively the resource allocation by
Ensuring that appropriate resources and tools are assigned,
Execute the tasks defined in the project plan to achieve
The project goals, Measure My area performance using
Appropriate tools and techniques,
Verified the final deliverables in my area,
I was managing for (4) Site Engineers and 8 supervisors,
And (160) skilled and unskilled Labor,
The Formwork system for Silo was Slip formwork, The formwork
For columns and Slabs was Acrow.
Polysius S.A.S is the Consultant
23/01/2012 –22/01/2014
Dar Al-handasah (Angola)
(Shair and Partners)
Working as a senior civil engineer in dar Angola, Zaire province,
The project is infrastructure (sewerage, water supply, telecom, M.V. electrical, and L.V. electrical, asphalt roads), the budget of the
Project about (70) million US$,
Develop the project charter and review it with key stakeholders,
Obtain project plan approval from the client and conduct a kick off
Meeting with all key stakeholders, Implement a quality
Management to ensure that work is being performed per
Required quality standards, Obtain financial legal and
Administrative project closure (e.g. final payments, warranties,
Contact sign off)
I was cooperating with the Main Contractor to Teach them how to
Executing the work, because they were had a lack for experience
And the skills to perform the activities, I act as Project Manager
For the contractor per our project management office
(PMO) Instructions for my Company.
01/02/2008 – 22/01/2012
BESIX– ORASCOM J.V.
Working as a senior site engineer in project Aldiyar Al-qataria (stage 1), in Nile cornice (Cairo – Egypt)
The project contains (937) core pile, and diaphragm wall, and dewatering system, and raft foundation, and (4) floor parking under the ground, the subcontractor company for piles and diaphragm works is BAUER (Egypt),
The pile diameter is (100 cm) and the depth is (41.0 m), the load test for the pile is (120) ton, and the diaphragm wall panel width is (80 cm), and depth (28.0 m),
I was responsible of Zone (A) of the site including the piles and diaphragm wall, and after the raft foundation and all the skeleton works for Zone (A).
Working as a senior site engineer in project Borg Al-Arab International Airport for Administration Building from Skeleton stage until finished all finishing Items.
The Building floor area is 2000 m square, and the building was
Three floor and upper roof,
The Finishing Items in the Building consist of (Granite flooring,
Marble facades, false ceiling, H M door frames, Aluminum
Windows and Curtain wall, Putty, and Painting)
01/07/2005 – 31/01/2008
SAMSUNG/SAMCRETE J.V.
The American university in new Cairo, New Campus Project
Working as a site engineer/senior engineer in Parcel (8),
Economic college (BEC Building), I finished the remaining
Of the skeleton works, and after that all the finishing items until
Completion for the building and handle off to the client, also
Prepare for the follow up reports, and put for the actual plans to
Catch the schedule progress, and prepare for the materials and
Manpower reports.
Monitoring and Controlling for Subcontractors in parallel with
Direct Manpower activities.
25/07/2001 – 30/06/2005
Alfa Construction Company (Cairo, Egypt)
Construction for officer`s hotel (Alexandria, Egypt)
Working as a site engineer, responsible for site skeleton works, and after that all finishing items works, until completion for the
Building and handle off to the Client.
The building consists of Ground floor + 10 floors,
The building foundation was Continuous Flight Auger (CFA) piles.
Working as site engineer in San Stefano project, in Alexandria
We were one of the Subcontractors for Skeleton,
The part we were performing consists of post tension slab.
The Slab consist of cables insert into Aluminum ducts according
To the shop drawings, and Anchors plus steel rebar’s.
After 5 days from pouring we were tension final tension, and
After that removed for Formwork.
TECHNICAL SKILLS Software packages: AutoCAD 2000, SAP2000, Windows &
Office XP.
LANGUAGES English: Excellent Arabic: Excellent Portuguese: Very Good
TRAVELS South Africa, South Korea, Qatar, Malaysia, Dubai, Angola, KSA
PERSONAL DATA Date & Place of Birth: 18/10/1978, Alexandria
Nationality: Egyptian
Marital Status: Married
Driving license: Valid Egyptian driving license
Valid Saudian driving license
Military Status: Exempted
References furnished upon request