Post Job Free
Sign in

Thermal power plant

Location:
Nagpur, MH, India
Posted:
December 07, 2017

Contact this candidate

Resume:

Prashant Kumar Sinha

House No **; M B Town *; Koradi Road; Mankapur Square -440030; Maharashtra

Email Id :- **************@**********.***

Mobile No :- 800-***-****

B.E (Mechanical) from Amrawati University in 1990 – 1994 with 1st Division

Having 23 years of experience in Super critical 3x660 MW Thermal power plant; subcritical boiler of captive power plant & Co-generation.

(1)Managing, Directing, planning & Coordinating Power Plant Operation & Maintenance including maximising plant profit & minimising expenses.

I do this by monitoring plant performance, investigation & correcting abnormal condition and Manpower Planning.

(2)Power Plant Project Management, Execution Erection & Commissioning ensure aims, goals and objectives were accomplished in accordance with outlined priorities, time limitations, funding conditions, quality compliance and Manpower planning

I do this by Strong skills in project planning, manpower planning, monitoring project progress, ensuring control & maintaining project requirements

Excellent communication, analytical & interpersonal skills with the ability to work in a dynamic environment

Career Summary:

Mar 17 - Till Date – DGM in Sukhbir Agro Energy Ltd.

Managing, Directing, Planning, Scheduling & Coordinating Captive Power Plant O & M

Oct 10 – Mar 17 – AGM in L&T MHPS Boilers Pvt. Ltd.

Managing, Directing, Planning, Scheduling & Coordinating Supper critical Boiler 3X600 MW Erection, Commissioning, Operation & Maintenance (Green field project)

Ensure start-up procedures & unit operation procedure are prepared & approved

Plans and prepares for start-up activities and major milestones (chemical cleaning, steam blowing, Synchronisation, Unit Load up, Combustion tuning, Demonstration tests, etc.

Aug 06 – Oct 10 – Manager in ISGEC John Thompson

Managing, Directing, Planning, Scheduling & Coordinating Sub critical Boiler Erection, Commissioning, Operation & Maintenance (Green field project)

Ensure start-up procedures & unit operation procedure are prepared & approved

Plan and prepares for start-up activities and major milestones (chemical cleaning, steam blow, Synchronisation, Unit Load up, Combustion tuning, Demonstration tests, etc.).

Dec 03 – Aug 06 – Dy. Manager in Manikgarh cement Captive power plant.

Managing, Controlling & Coordinating Captive Power Plant O & M

Planning, Scheduling & Coordinating daily and annual maintenance job

Managing & controlling spares and inventory

May 03 – Dec 03 – Asst. Manger in Monet Power Captive power plant.

Managing, Directing, Planning, Scheduling & Coordinating AFBC Boiler O & M

Sep 98 – May 03 – Engineer in DLF Power Ltd Thermal power Plant

Managing & Coordinating Boiler Erection & Commissioning (Green field project)

Managing, Planning and coordinating Thermal power plant Operation & Maintenance

Planning, Scheduling & Coordinating daily and annual maintenance job

Nov 94 – Aug 98 – Engineer in Century Pulp & Paper Mill Captive power plant

Managing & Coordinating Captive Plant O & M as shift In charge

Proficiency Forte:

Operation & Maintenance of 3 X 660 MW super critical Thermal power plant & sub critical captive power plant

Operation & Maintenance execution.

Planning, Scheduling & Monitoring O & M daily checks to increase the reliability and corrective action for abnormal condition

Executing cost saving measures with suitable modifications in process.

Conducting Fault / Trip Analysis, troubleshooting & devising technical solutions.

Investigate major breakdowns, analyse and provide action plan for corrective action to rectify the equipment’s through application of trouble shooting techniques in accordance with Boiler maintenance norms and Boiler inspections

IBR liaising with Director of Boiler.

Plan, Schedule and co-ordinate Shut down / Preventive Maintenance (resources and manpower) activities of boilers, Coal Mills, Coal feeder, ID Fan, FD Fan, PA fan, RAPH, Boiler feed pump, CEP, DM Plant, WTP, ETP

Spares and Inventory planning. Raise & approve indents for requisite material and assist purchase department for the procurement of materials.

Participate in the planning and execution of improvement projects

Prepare medium and long term plant health plan in consultation with the Management

Installation & Commissioning of 3 X 660 MW super critical Thermal power plant & sub critical captive power plant

Ensuring effective site management and discipline to ensure safe & timely execution of the projects.

Develop high level plan of Erection & commissioning activities to minimise Boiler Erection & commissioning as reasonably possible

Planning and scheduling L2 level

Identifying project bottlenecks and undertaking corrective measures.

Provide input to the Contract team on the level of vendor support needed and assist with scope of work and quote analysis and acceptance, vendor scheduling & logistics including vendor provided training schedules.

Periodically attending Factory Acceptance Testing (FAT) including reviewing procedures.

Review engineering design and provide comments toward "commissioning reliability" at fabrication phase at site and boiler installation phase

Work closely with the construction and commissioning contractors to develop a baseline schedule that takes advantage of all efficiencies possible

Ensure comprehensive completions database for project is prepared

Develop & Maintain detail commissioning and start-up plans in conjunction with engineering and OEM

Ensure start-up procedures are prepared as required by contract to coordinate the start-up effort

Plans & prepares for start-up activities & major milestones (chemical cleaning, steam blow, demonstration tests, etc.).

Provide input to the Contract team on the amount of commissioning spares required for project completion

Review Mandatory spares and provide comments toward "operation reliability”

Attend mechanical completion and system handover joint walk downs as required

Reviewing work permits for commissioning scope

Attend daily Progress meeting and provide input / comments as required

Manage the completion progress throughout the project with an eye towards schedule efficiency

Manage closeout of punch list items for the projects

Ensure that preservation and maintenance on systems are correctly identified and are being carried out in accordance with Preservation Procedure

Provides supervision, training, development, and performance management of direct reports.

Engage Operations personnel as part of the commissioning team and maximize on-the-job training for operations personnel

Work in a team environment and interact with the other functions and contractors. The lead acted as the go-between to maintain the construction and commissioning contractors, and operations interfaces.

Quality Assurance

Ensure operations are monitored/ controlled as per technical data sheet & approved procedures.

Ensure Maintenance activates being followed as per the standard norms

Ensure appropriate steps to carry out the maintenance process are being followed

Review O & M activity and quality plan to ensures that appropriate methods are followed (To latest technology)

Conducting regular Internal Audits, Root Cause Analysis, Troubleshooting and Reviews, to ensure adherence to highest standards.

Ensure External / internal audit report compliances are closed

Overseeing implementation of quality management as per ISO Standards.

Training and guiding teams towards identifying factors critical to quality, reducing process variation, improving capabilities & increasing stability

Safety

Demonstrate personal HSSE leadership and excellent HSE behaviours at all times and ensure that safety expectations are communicated and followed. Perform as a safety leader through frequent oversight visits while setting and exhibiting the highest standards of safety.

Undertaking regular inspections to prevent accidents and adhere to safety norms

Notify supervision of all unsafe acts, near misses and incidents.

Man Management

Leading, mentoring & monitoring the performance of the team to ensure efficiency in process operations & meeting of individual & group targets.

Ensuring that teams adhere to all the quality tool & procedures.

Resolving interpersonal issues & working towards a harmonious work environment.

Point wise discussion with heads and team members to improve the efficiency of team work

Leading the technical team and encouraging, to overcome all needs fallen in enroute of Operation & commissioning

Techno-commercial Functions

Executing Detail Engineering initiatives with inputs on Equipment and systems for all P & I drawings based on general arrangement drawings completed during the basic engineering phase.

Preparing Detail specifications for equipment purchase and to fully defining the requirements.

Developing Tender documents based on P & I Drawings and Specifications to obtain firm construction bids from Contractors and Equipment Vendors.

Project Engineering

Steering the overall planning, scheduling and management of modernization & capacity expansion projects, ensuring completion of assignments within time and budgetary parameters.

Planning for materials, developing vendors to obtain timely procurement of materials and equipment’s to facilitate smooth production process.

Monitoring projects with respect to Cost, Resource Deployment, Time over-runs, Quality Compliance and Manpower planning to ensure timely execution of projects.

Accomplishment

As DGM in Sukhbir Agro Energy Ltd. Power Plant

Improved cooling water quality hence turbine exhaust temperature reduced as a result reduced steam consumption 2.5 ton/ hr and fuel consumption was reduced 4.12% per/hr.

Initiated, Managed, Coordinated & conducted Seminar, Group discussion & Knowledge sharing in Classroom, Workshop & on job training for improving water treatment.

Combustion Fine tuned and fuel consumption 5 ton/day was reduced as result Boiler efficiency improved by 0.02%.

Initiated for preparing Combustion tuning procedure and approved procedure. Supervised and monitored preparatory work as per procedure. Managed, Directed and controlled the fine tuning process.

ID fan vibration & noise level reduced hence ID fan parts early damage reduced as a result break down time reduced and fan availability/reliability increased up to 97%

Initiated for preparing as per actual site condition ID Fan maintenance procedure and approved procedure through trouble shooting method, Investigation & data collection. Managed & coordinated outsourced Professional balance agency.

Proper bearing selection done for CEP pump hence reduced parts early damaged as a result increased CEP pump availability/reliability up to 95%

Clean air flow velocity test conducted, as per result corrective action taken hence uniform flue gas flow and velocity maintained as a result 2nd pass and economizer coil leakage reduced. increased Boiler availability/reliability up to 97%

Advance assembly procedure for Boiler feed pump introduce hence Boiler Feed pump annual maintenance time reduced as a result availability of feed pump increased up to 97%

Introduced daily tool talk & kaizen to improved worker efficiency and reduced maintenance working time influenced 50%

As AGM in L&T MHPS

Optimized manpower, commissioning spares and reduced commissioning time by cost saving increased project profit by 1%

Project, Commissioning Highlights

Project Title: - 3 X 660 MW; Super Critical; Koradi TPS Expansion Project; Koradi, Nagpur (Maharashtra)

Green field project

Client:- Mahagenco

Thermal Power Plant 3X660 MW

Role:- As Unit commissioning In-charge

Role Descriptions: - Planning, scheduling L2 level, Pre-commissioning, Commissioning and trial at drive level, sub group level & group level of all equipment’s following the parameters specified in datasheet and with all protection interlocks as per procedure and safety including tuning of plant.

Team Size: - 21

Accomplishment: - Optimized manpower, commissioning spares and reduced commissioning time by cost saving increased project profit.

Project Title: - Mumias Sugar Company Limited; Kenya (East Africa); (Overseas Project)

Expainsion project

Client:- Mumias Sugar Company Ltd.

Cogeneration

Role: - Project Site In charge

Role Descriptions: - Execution, Erection and Commissioning of 170 TPH Traveling grate Boiler manufactured by IJT

Team Size: - 18

Project Title: - Bhusan Energy Pvt. Ltd; Meramunduli, Anugul, (Orissa)

Expainsion project

Client: - Bhusan Energy Pvt. Ltd

Thermal power plant 2 x 135 MW

Role: - Commissioning In Charge

Role Descriptions: - Commissioning of 4x250 TPH CFBC Boiler manufactured by IJT

Team Size: - 12

Project Title: - DSIL; Barailey & Dhampur(UP)

Green field project

Client: - Dhampur Sugar Industries Limited

Cogeneration

Role: - Site In charge

Role Descriptions: - Execution, Erection and Commissioning of 2 X 170 TPH Travelling grate Boiler manufactured by IJT

Team Size: - 18

Project Title: - Bajaj Hindustan Limited, Sugar Mill; Philibhit,(UP)

Green Field project

Client: - Bajaj Hindustan Limited

Role: - Site In charge

Role Descriptions: - Execution, Erection and Commissioning of 2X90 TPH Traveling grate Boiler manufactured by IJT

Team Size: - 18

Project Title: - DLF Power Limited; Rajrappa, Giddi, Madhuban (Jharkhand)

Green Field project

Client: - DLF Power

Captive power plant 3 x 11 MW

Role:- Mechanical Commissioning Engineer

Role Descriptions: - Project execution, Erection, Commissioning and O&M of 3X11 MW, Captive Thermal Power Plant, Boiler & turbine manufactured by DLF of Skoda technology as O&M engineer.

.

Media :-

https://www.linkedin.com/in/prashant-kumar-sinha-114a3829

http://sael.co/content/ghazipur-biomass-plant

(Prashant Kumar Sinha)



Contact this candidate