Resume

Sign in

Project Manager

Location:
India
Posted:
November 28, 2017

Contact this candidate

RESUME

Name: Satnam Singh Dhimaan E-mail: ac3ijy@r.postjobfree.com

Address: Flat No.17, 3rd Floor, Pkt. A-2, Sector 11, Cell No. +91 987*******

Rohini, Near Metro Walk, New Delhi - 110085

OBJECTIVE

To pursue a challenging career and to build a strong foundation in the field of Mechanical in an esteemed organization where I can utilize my skills and upgrade my knowledge to become an experienced professional.

EDUCATIONAL QUALIFICATION:

Passed 3 years Diploma - Mechanical Engineering in 1st Class (75.1%) in the Year 1982and cleared AMIE-Mechanical Engineering from “The Indian Institution of Engineers (India)” Calcutta in the year 1985.

Cleared Post Diploma in Industrial Safety Management.

TECHNICAL SKILLS

Cleared NDT Level II (RT, UT, PT, MT, VT) personnel in accordance with SNT-TC-1A of American Society of NDT – USA.

Completed Pre Sea Survival Training from reputed Institute in India & Abroad

PROFESSIONAL EXPERIENCE

34.3 + yrsas Detailed below with ISO companies in INDIA& ABROAD.

1.TUV India Pvt. Ltd

Duration : 12th July 2010 to Till Date

Position : Sr. Project Manager - Coordination & Inspection.

Construction /On line Inspection of Special Bridge Across the River “CHENAB BRIDGE PROJECT UNDERTAKING“ at KM 50/800 on Katra – Laole Section in Jammu & Kashmir at Village Kouri, P.O. Kanthan, Teh - Mahore, Distt. Reasi with the height of 359 Mtrs from Sea Level and Length of the Bridge will be 1.315 Mtrs, under the guidance of KONKAN RAILWAY CORPORATION LIMITED, As per BSEN ISO 15609–1/BSEN ISO 15614-1/BSEN ISO 9692 – 1 & 2 :2003.

Complete Fabrication Inspection of Bottom & Fly Ash Handling System Capacity - 310 TPH for PAGBILAO 420 MW UNIT 3 COAL FIRED PROJECT A/c M/s DAELIM – Korea at

M/s Macawber Beekey Pvt. Ltd., – Keshwana (Kotputli) Factory from Dec. 2015 to April 2016.

Completed Shut Down Job at M/s Hindustan Petroleum Corporation Ltd. – Chembur Mumbai for FRE Plants around 35 days during Annual Maintenance Shut Down.

Inspection of Heat Exchanger & Pressure Vessels as per IOCL Code and Standard

ASME Sec II Part A/B/C, Section V, Section VIII Div. – I and Section IX for

IOCL Project at M/s Multimax Engineering Works - Meerut.

… 2 …

Completed HVAC System Project at Samsung Engineering India Pvt Ltd. – Bharuch Dahej (Gujarat) On line Inspection of Execution of HVAC Systems

Package and Checked all the Fabrication of Pipe Lines with Incoming Material for Pipe lines and Fittings, Valves, Pressure Vessels, Heat Exchangers, Pumps, Compressors, columns and Reactors, Air coolers etc. etc.

Inspected Tower Crane, Its Proper Loading Capacity at different – 2 place & free Run at M/s Action Construction Equipment Ltd. at Kashipur Factory for M/s Larsen & Toubro - Gujarat Project

Supervision Cum On Line Inspection of Stainless Steel Equipments for Sugar Plant’s Machinery for Stainless Steel of SS – 304, 409, 410, 439 Material at Site Baddi – Himachal Pradesh for M/s Emineo – IPRO – Nigeria.

Inspection of Pipe Fittings as per Referred Document: ASTM A 234, A420, A403 ASTM BS MSS ASME-B16.5 B16.9 B16.10 B16.11 B16.28 & MSS SP- 25/79/95. B16.9 with Various vendor’s in NCR Delhi.

Inspection of Valves with these Standards API 598, API 6D, API 594, ASME/ANSI B16.5, API 600, API 602, API 603, and API 604 standard requirements normally are applied for inspection and test plan in manufacturing shop with Standard Practice.

Completed Project for On Line Inspection of Air Cooled Heat Exchangers at manufacturer works for M/s IOCL from Raw material to finished Product as per ASME Specifications and API 661. Job includes inspection of Run Test and Performance at M/s GEI Industries Limited - Bhopal.

Completed Project for On Line Inspection of Bends of Size 6.625” OD X 17.5 WT & 8.625” X 20.6 MM WTwith Pipe Grade - API 5L X 60 (PSL-2) CS NACE at SiteM/s Jindal Kosi Kalan Mathura UP, for ONGC MHNRD II Project.

Completed Project for On line Construction’s Inspection of ONGC Offshore Platform’s Modules such as MSF (Celler Deck), Building, PGC, TG, SG, Bridge& their connected Pipe Lines etc. etc at PT. GUNANUSA UTAMA FABRICATORS, INDONESIA.

Completed Project for On line Inspection (as per API Standard) of Line pipe manufacturing and 3 LPE coating at M/s Jindal Saw Limited - Kosikalan and Mundra on Pipe Size 20”, 12”, 10”, 8” respectively for M/s Adani Energy Limited and M/S ONGC Project.

Completed Project for On Line Pipe Mill Inspection of 20" Ø WT 7.1mm, 7.9mm and 8.5mm Grade X-46 PSL-2, API 5L Pipe Manufacturing at Jindal Saw limited, Kosi Kalan-Mathura (UP) for ONGC Konban Tripura Pipe Line Project.

Supervision Erection Cum On Line Inspection of Strainers at M/s Advance Valves Noida for Water Pipe Line Size Maximum up to 6” for GWSSB - Bhuj.

Inspection of Flange as per Applicable Specification- ASTM/BS/DIN Data Sheet where applicable/ASME-B16.5/ASME-B16.28/ASMEB16.47 with Various vendor’s in NCR Delhi and other Areas.

On Line Inspection of Various Items at Vendor's Workshop in Delhi & other Places.

2.GERMANISCHER LLOYD INDUSTRIAL SERVICES INDIA GmbH. MUMBAI.

DURATION : 1st March 2005 to 28th June 2010.

POSITION : Project Manager

Supervision cum inspection of Tanks, Piping and Rotary Equipment’s, Compressors, Pumps or Static Equipment’s Exchangers, Pressure Vessels as per ASME Code and Inspection of Incoming Material and Monitoring Equipment’s – Preservation as per Vendor’s requirement, Cold & Hot Alignment along with Pipes On & Off Alignment of 5 x 115 TPH Oil/Gas Fired, HCFM 220-97 Model Boilers and

… 3 …

Inspection of works at M/s Jindal Saw Limited – Samaghogha, Mundra - Gujarat for the Verification & Certification of “Sect Tube Welding & Liquid Epoxy Painting, As Per API 1104 Upon 24” OD X 10.6/11.9 mm WT, 1” OD SCH 40, API 5L X-65 PSI 2, ASTM A106 Grade B Pipe for Crude Oil, Pipe for/s Cairn Energy Pty. Ltd.

Responsible for all the Quality Control Points for Construction & Laying of CNG Service Station along with its Pipe Line of Different Size 18”, 12”, 10”, 8”, 6” & 4” Dia Cross Country Pipe Line for M/s Adani Energy Ltd., at Noida, Faridabad & KhurjaStation to run CNG Service Stations.

According to QA/QC Laying of Pipe 355.6 mm (14 Inch) O.D. x 12.7mm W.T., API 5L x 60 with 85 /60 mm thick-ness Concrete Wall Coating (CWC) Pipe line from LFP to KP 53.838, Including subsea-spool tie-Ins at the PY-1

Platform. Installation of Sub Sea lateral with the steel protection-case at KP 30.860 in ONGC Project at Kochi.

Worked as an Equipment In-charge at Site M/s Cairn Energy India Ltd for the Erection & Commissioning of all Static &Rotating Equipment’s are as Pumps, Valves Strainers, Blowers, Compressors & Turbines with my own Hands.

Inspection of Flanges as per Applicable Specification - ASTM/BS/DIN Data Sheet where applicable/ASME-B16.5/ASME-B16.28/ASMEB16.47 with Various vendor’s in NCR Delhi Such as (M/s Chaudhary Hammer, Lal Metals, Metal Forgings etc. etc).

Completed modification of PWRI & MPPI Project with modification of Piping Systems, Tanks by using API 650& 653 Standard& Structure at site M/s CAIRN ENERGY INDIA LTD at Ravva (Andhra Pradesh) with proper Incoming Material Inspection and Monitoring of Equipment’s – Preservation as per Vendor’s requirement and

Preparation of Quality Documents & Preparation of Test Pack for final Submission.

Responsible for all the Quality Control Points for Construction &Laying of 48” Dia x 19.3mm W.T with 150 mm thickness Concrete Wall Coating (CWC) pipe line up to 19.75 km long Crude Oil Submarine & On Shore Pipeline from Shore to SPM (Single Point Mooring) at IOCL Para deep.

Worked in “MUT “Modification Project as QC In-charge, for M/s ONGC – Hyundai Heavy Industries Ltd., for Platform ICP / SHP / SHG /BCPA / NQP – Bombay High and involved in Hook Up, Deck Extension for Installing Oil Metering Skid, at ICP Platform, Deck Extension at HPU, Riser, Pig Launcher at SHP / SHG Platform, Piping for oil and Gas line thro oil Metering skid and Preparation of Quality Documents & Preparation of Test Pack for final Submission.

3. KIMPLAS PIPING SYSTEMS LTD.

DURATION : 1st September 1999 to 28TH FEB., 2005.

POSITION : Sr. Project Executive.

Supervision Installation/Commissioning of Polyethylene Pipes as per IS Code (HDPE, MDPE, PVC, PP, PB, ABS & PVDF Projects in Fertilizer, Pharmaceutical Chemical, Mines for the Application of Fluid Conveyance viz. Gas, Water, Chemical & Slurry etc. Jointing of the Pipes with Electro fusion, Socket Fusion, Butt Fusion and Compression. Achieved Professional Training from Factory, Plastec Inc. at Norwayfor “Special Welding Methods for PVC Foldable Water Tank / Pipeline.”

4. TOYO ENGINEERING INDIA LTD.

DURATION : 1st November 1997 to 30th August 1999

POSITION : Sr. Mechanical Engineer.

… 4 …

Supervision at M/s National Mineral Development Corporation. Vishakhapatnam, ERECTION of UPFO (Ultra Pure Ferric Oxide) Plant and at M/S Hindustan Petroleum Corporation Ltd., at Mumbai, Completed Fabrication & Erection of DHDS (Diesel De Hydra Sulphrization Unit.).

M/s Mangalore Refinery & Petro-Chemicals Ltd., Mangalore. Execution of CCR

(Continuous Catalytic Reformer Unit of Capacity, 360000 MT/Year,) Consisting of Reactor, Heat Exchanger, Vessels &Structure for these Static and Rotary equipment’s are as Pumps, Blowers & Compressors and complete Fabrication of Piping System.

5. WESTERN INDIA ENTERPRISES LTD.

DURATION : 1st February 1993 to 30th October 1997.

POSITION : Asstt. Manager (Mech. Maintenance).

Supervision and Trouble-shooting of all Mechanical Problems of Boilers/Coal Handling Plant Area, Such as E.S.P, PA Fan, Blowers, Burners, Steam Valves, Ball Mills, Scrappers, Heat Exchangers, Wagon Tipplers, Crushers, Belt Conveyors Long & Other Allied Equipment’s with my own hands. Allotment of Job Work either to our own staff or to our Sub-Contractor, According to the Quantum of Work at M/s National Fertilizer Limited and M/s Panipat Thermal Power Plant. Appointment of Maintenance Engineers after scrutinizing the applications received from deferent individuals and place them in order for final selection at site.

6. PWH MATERIAL HANDLING LTD. (ELECON).

DURATION : 1st August 1987 to 30thJanuary1993.

POSITION : Project in charge

At M/s Indarprastha Power Station, DESU, New Delhi. Supervision of FABRICATION / Erection & Commissioning for New Coal, Handling Plant of capacity 750 Ton consisting of wagon Tippler, Separators, Feeders, Belt Conveyors – Long

(Approx.-2 KM), Crushers, Ventilators, Scrappers, Extractors etc., And Complete Execution of the Plant as per Drawing Piping Systems& Electrical Panels also.

Erection & Maintenance of “Bar Mill Project”, from Furnace to Coiler and EOT Cranes 10 MT & 25 MT Capacity. Responsible for smooth operation of the Bar Mill Project at M/s M P Iron & Steel Co. Ltd., Gawalior (Madhya Pradesh).

Checked QC activities for the Erection & Commissioning of 3 MW Wind Turbine Project at site Gudimangalam Consisting of 5 Nos. Turbines of 600 KWl., Gudimangalam.

7. FACT INDIA.

DURATION : 01st June 1982 to 30th July 1987.

POSITION / RESPONSIBILITY : MECHANICAL MAINTENANCE ENGINEER

Maintenance of “Coal Handling Plant” of Capacity 1200 MT/Hr. consisting of stacker

reclaimed, Apron feeder, Conveyors Crushers, R.C. Feeders & other allied equipment’s. Getting Clearance from Client’s Engineer regarding Completion of each job for M/s Ropar Thermal Power Station, Ropar (Punjab).

… 5 …

Supervision of Erection & Commissioning of 3HI-HOTRolling Mill for structural sections Angle, Beams & Channels etc., Execution of the Plant with proper supply and Fabrication of Pipe line and all the Electrical System for the Operation of Mill at M/s Haryana Steel & Alloys Limited, Sonepat (Haryana)

Supervision of Maintenance for Boiler 150 MT/Hr, Ammonia Plant and coal handling plant at Panipat Thermal Power Station & NFL, During Plant shutdown attended maintenance of Steam, Valves, Burners, Pumps, R.C Feeders, Hot Air Dampers, E.S.P, Scrapers, Clinker Grinders, Ball Mills, Crushers, PA Fan, FD Fans, Heat Exchangers And Long Belt Conveyors etc., Complete Execution of Plant and Aligned Complete Pipe Line with Fabrication of New Pipe Lines.

Erection & maintenance of 30 MW Captive Power Plant consists of 2* 15 MW Turbo generators. Erection/Aligned of all Rotary Equipment’s& also maintained those Equipment’s for Zero Breakdown for Project at M/s National Fertilizers Limited, Panipat – Haryana. Appointment of Engineers after scrutinizing the applications received from different individuals and award the job to them according to their work culture for final selection at site.

Supervision for Erection of Steam Turbine for 500 MW, Turbine Throttle Steam Pressure 170

Kg/cm2 (abs) at M/s National Thermal Power Station – Singrauli M.P. Supervision for

Erection & Maintenance of Long Belt conveyors, Bucket Elevators / Feeders, Screw

Conveyors & other Material Handling Equipment’s Pipe Line etc etc.

Complete Execution of the Project AT Sanjay Vidyut Pari Yojana Dam, Huri - Kinnaur.

HP & NDDB Milk Plant Jalandhar Punjab & other plants.

Inspection & Supervision for Erection of EOT Crane, Capacity 20 MT at M/s Haryana Steel & Alloys Ltd. Murthal – Sonipat.

Constructed a Factory Building of M/s Birla Genset Co. Ltd with Pilling of Foundation

stage to sheeting of complete Plant at M/s Sheri Ram Honda Power Genset. (Rudrapur).

STANDARDS / CODES FAMILIER WITH

1) API 5L

2) API 1104

3) API 650& 653

4) ASME 31.3

5) BHEL NDT PROCEDURES

PERSONAL PROFILE

Father’s Name Late Sh. Jaswant Singh.

Date of Birth 30th July 1962.

Languages English, Hindi & Punjabi

Skype ID Samrukh72

Passport Details N -1968264 & Valid up to 11.08.2025.

(Satnam Singh Dhimaan)



Contact this candidate