CAREER OBJECTIVE

Possessing a wealth of experience in MECHANICAL (HVAC, PLUMBING & FIRE FIGHTING) services and a proven ability of successful completion of the project, consistently achieving significant experience and growth. Ensuring that project goals and objectives understood & worked towards by all on the project team. Believing that good team leadership and hard work brings increased standards and profits.

SYNOPSIS Total Year of Experience: 13

Totally 13 Years of valuable experience in the field of MECHANICAL (HVAC, PLUMBING & FIRE FIGHTING) (11 years Gulf experience + 2 years experience in India).

Mechanical Consultant IN SAUDI ELECTRICITY COMPANY/ Al Othman consultants IN Al khobar.KSA.

Sr, Mechanical Engineer IN SAUDI TAAB CONTRACTING CO. IN Khobar.KSA.

Mechanical Engineer IN SAUDI ELECTRICITY COMPANY/ Palace consulting Engineers. IN Riyadh. KSA.

MEP Construction Manager IN ARABIAN MEP CONTRACTING WLL CO. IN QATAR.

Mechanical Engineer with ETA – MNE, ETA - ASCON GROUP – DUBAI.

HVAC Site Engineer with KELVIN LIMITED (VOLTAS System Dealer) Andheri (East), Mumbai. INDIA.

ORGANISATIONAL EXPERIENCE

MECHANICAL ENGINEER. Feb 2016 to till date

SAUDI ELECTRICITY COMPANY/ AL OTHMAN CONSULTANTS (Alkhobar Saudi Arabia)

PROJECT NAME:- CONSTRUCTION OF 115/13.8 KV SUBSTATIONS IN AL HASSA (EASTERN REGION),KSA.

Review of Project Specifications (PS) including Scope Work (SOW) and Tender drawings, BOQ for 115 KV and 13.8 KV Substations Construction Projects.

Technical review of Company draft Materials Standard and Specification.

Design review and Preparation of Comments on Contractor or Manufacturer Equipment & Material Proposal and Technical Submittals as per SEC Standards and other International Standards.

Review of Material Requisition, Manufacturer Prequalification Documents, Manufacturer Compliance Statements, Vendor Recommendation and Vendor Drawing Checking.

Detail design review meetings of various projects. Updating & Reporting Project design Activities, Reviews on MOM.

Review of detailed designs and calculations submitted by consultants/contractors for 115KV AND 13.8KV Substations projects.

To handle the complete HVAC, Plumbing and Fire Fighting design calculations, drawings and material technical submittals.

To design Heat load calculations, External static pressure calculations of pumps, motors, Hydraulic flow calculation of fire fighting and plumbing pipe sizing design.

Design and review of schematic diagrams for HVAC, Plumbing and Fire Fighting layouts all the buildings 115/13.8 KV GIS, control and switchgear buildings according to SEC and IMC standards.

Detail study of prequalification of mechanical equipment suppliers.

Detail technical study of Electrical travelling crane used in 115KV GIS building.

Develop and prepare single line, HVAC, Plumbing and Fire Fighting layouts.

Coordinate with Contractor and Sub Contractor’s engineering disciplines during all stages of design review for various projects.

Sr,MECHANICAL ENGINEER: Sept 2015 to Jan2016

SAUDI TAAB CONTRACTING COMPANY LTD (Al Khobar, Saudi Arabia)

PROJECT NAME:- 1) MARAFIQ, HOUSING OWNERSHIP PROJECT (250 VILLA).

Overall responsible for meeting contract requirements in terms of scope, performance, quality and safety related to Mechanical System.

Attends and organize all site meetings with the engineers/consultant.

Supervises the performance of the project control and administration activities, including, planning, scheduling and invoicing.

In charge of following up the Mechanical related changes, additional works as well as claims in accordance with the established procedure of the contract.

Give the proposal for allocation of sub-contractor to the project manager.

Assist the project manager in preparing the monthly reports/bills.

Check and approve invoices of Mechanical sub-contractors and suppliers.

Keep contact to all relevant technical authorities.

Execute the handing over procedures of the Mechanical scope on site with consultant and client.

Ensuring that the project should be completed within the specified time

MECHANICAL ENGINEER. July 2014 to July 2015

SAUDI ELECTRICITY COMPANY/ PALACE CONSULTING ENGINEERS (Riyadh, Saudi Arabia)

PROJECT NAME:- CONSTRUCTION OF EHVP 380/132/13.8 KV BSP SUBSTATION IN ARAR,KSA.

Review of Project Specifications (PS) including Scope Work (SOW) and Tender drawings, BOQ for 400/380KV, 220KV, 132/115KV, 66KV and 13.8 KV Substation Construction Projects.

Technical review of Company draft Materials Standard and Specification.

Design review and Preparation of Comments on Contractor or Manufacturer Equipment & Material Proposal and Technical Submittals as per SEC Standards and other International Standards.

Review of Material Requisition, Manufacturer Prequalification Documents, Manufacturer Compliance Statements, Vendor Recommendation and Vendor Drawing Checking.

Detail design review meetings of various projects. Updating & Reporting Project design Activities, Reviews on MOM.

Review of detailed designs and calculations submitted by consultants/contractors for HV/EHV projects.

To handle the complete HVAC, Plumbing and Fire Fighting design calculations, drawings and material technical submittals.

Design and review of schematic diagrams for HVAC, Plumbing and Fire Fighting layouts all the buildings 400/380/220/115/33/13.8 KV GIS, control and switchgear buildings according to SEC and IMC standards.

Detail study of prequalification of mechanical equipment suppliers.

Detail technical study of Electrical travelling crane used in 400/380/132/115KV GIS building.

Develop and prepare single line, HVAC, Plumbing and Fire Fighting layouts.

Coordinate with Contractor and Sub Contractor’s engineering disciplines during all stages of design review for various projects.

MEP Construction Manager: June 2009 to May 2014

ARABIAN MEP CONTRACTING COMPANY WLL (AL MALKI GROUP, QATAR)

PROJECT NAME:- 1) RATANA CENTRO HOTEL, MEP PACKAGE.

2) HAMAD MEDICAL CITY CP 300B, FIT-OUT PACKAGE-2.

3) NAKILATH SHIP REPAIR YARD RASLAFFAN ON SHORE WORKS (QP)

4) QATAR AIR WAYS FOUR STAR HOTEL (B+G+5Bldg)

Overall responsible for meeting contract requirements in terms of scope, performance, quality and safety related to MEP.

Attends and organize all site meetings with the engineers/consultant.

Supervises the performance of the project control and administration activities, including, planning, scheduling and invoicing.

In charge of following up the M.E.P related changes, additional works as well as claims in accordance with the established procedure of the contract.

Give the proposal for allocation of sub-contractor to the project manager.

Assist the project manager in preparing the monthly reports/bills.

Check and approve invoices of M.E.P sub-contractors and suppliers.

Keep contact to all relevant technical authorities.

Execute the handing over procedures of the M.E.P scope on site with consultant and client.

Ensuring that the project should be completed within the specified time

Mechanical Engineer: December2006 to June 2009

ETA – MNE, (ETA ASCON GROUP, DUBAI)

PROJECT NAME:-

1) AL GHURAIR CITY EXPANSION PHASE II (3B+G+5PODIUM+20 RESI+HOTEL) TOWER.

2) AL THURAYA TOWER (G+3P+20 RESI) TOWER.

3)AL IKHALAS TOWER (G+7 RESI) TOWER.

Assisting the Project Manager in the Project Work from the beginning stage till the submission.

Detailed study of scope of work, Specification, Equipment Schedule and BOQ (Tender) etc.

Design Submission and Preparation of Design and Analysis Report to submit the client.

Pump Head and ESP calculation for Pump & AHU selection respectively.

Preparation of Bill of Quantities and floating the enquiries to the venders.

Mobilization of manpower for execution of the project.

Preparation of Workshop Drawing and Material submittal for consultant approval.

Preparation of Daily & Weekly program based on one month look ahead program.

Preparation of Daily, Weekly and One Month progress report.

Preparation of the detailed Site quantities requirement based on the consultants approved drawings.

Preparation of Work Method Statement as per specification and standard norms.

Supervision of installation of HVAC, Plumbing & Fire fighting items as per standard norms.

Floating Request for Inspection of installations to Consultant and rectifying if any snag works / comments.

Floating request to consultant for material inspection as per submittals and specification.

Coordination with all other services like Architectural & Electrical, etc towards successful completion of project.

Coordinating with Architect / Contractors during the execution of the project.

Attending the weekly site meeting with consultant and sub contractors.

Preparation of appropriate documents for handing over the Project (Mechanical Services).

Site Engineer. July 2004 to October 2006

KELVIN Limited (VOLTAS System Dealer),Andheri (East), MUMBAI

PROJECT NAME:-

1)PARADISE MALL(G+3) BUILDING.

2) RUBY MALL (G+3) BUILDING.

3) AKSHAYA PHARMATICALS (G+1) BUILDING.

Mobilization of manpower for execution of the project.

Prepare the detailed Site quantities requirement based on the consultants approved drawings.

Preparation of workshop drawing and submit to consultant for approval.

Preparation of material submittal for consultant approval.

Coordinating with the back office staff and / or supplier towards timely delivery of materials on site.

Supervision of Duct fabrications as per DW142 / SMACNA standards and its installation.

Supervision of installation of HVAC, Plumbing & Fire fighting items as per standard norms.

Participating in site meetings with client / consultant.

Floating Request for Inspection of installations to Consultant and rectifying if any snag works / comments.

Coordination with all other services like Architectural & Electrical, etc towards successful completion of project.

Actively participating with third party during Testing and commissioning of Mechanical system.

Preparing appropriate documents for handing over of the Mechanical services

TECHNICAL SKILLS:

HVAC Design and Performance

Verify design and supervise the installation of HVAC systems for different types of high rise commercial & residential buildings.

Provide technical assistance to building management system (BMS) design and monitor the installation.

Schedule and coordinate program and plan testing and commissioning of all HVAC systems.

Duct designing using Formulae, Ductulators (Trane, Carrier & York) and Programs (DUCTO and McQuay) .

Chilled water pipe sizing McQuay.

Heat Load Calculation (Manually by E-20 and General) and by software programs Carrier Block Load, Carrier - HAP (Hourly Analysis Program).

Car Parking Ventilation, ESP Calculations, Chillers, AHU, FCU, FAHU & VAV Selection

ASHRAE and SMACNA Standards.

HVAC, Plumbing, Fire Fighting, CSD & BW Shop Drawing Preparation.

PLUMBING Design and Performance

Preparation of shop drawings and material submittals.

Pump Head calculations, Pipe Sizing calculations.

Water Heater and sanitary items selection.

Materials, Fittings and Valves quantity take off.

Testing and Commissioning of Water supply Pipeline, Drainage Pipe Line, Storm Water Pipeline, Water Tank, Water Heater, Booster Pump, Transfer Pump, Sump Pump and controls etc.

FIRE FIGHTING Design and Performance

Preparation of workshop drawings and material submittal.

Pump Head calculations, Pipe Sizing calculation.

Selection of pipe sizes, Sprinklers, Fire Extinguishers, FM -200 Systems, Aerosol system fire department connection pipe, etc.

Materials, Fittings and Valves quantity take off.

Testing & Commissioning of Sprinklers, Hose reel, Dry Risers, Wet Risers, Foam System, Halogenated Extinguishing Agent Systems & Fire Pumps (Diesel Pump, Jockey Pump & Electric motor Pump) as per Civil Defence Regulations & standard )

DESIGN EXPOSURE & COMPUTER LITERACY

HVAC SOFTWARE : Elite, Hourly Analysis program (HAP),

Operating System: MS–DOS, Win – 2000.

Packages: MS -Office 2000, AUTO CAD 2000 etc.

PROFFESSIONAL QUALIFICATION

B.E (Mechanical Engineering) from Vishveshwariah technological university Belgaum state Karnataka (INDIA) in the year 2004 with first class.

DIPLOMA in Mechanical Engineering Passed in 1998 from Board of Technical, Bangalore, India.

.