C U R R I C U L U M V I TA E
POST APPLIED FOR :QC ENGINEER/INSPECTOR (Welding/Piping/NDT)
Personal Profile
Name: SABEEL CU
(Bachelor of Engineering in
Mechanical)
Contact:
Mobile: +965********
E-mail:
ac3e4a@r.postjobfree.com
Personal Data:
Date of Birth: 20/03/1991
Gender: Male
Marital Status: Single
Nationality: Indian
PASSPORT DETAILS
Passport No: K6721455
Date Of issue : 19/11/2012
Date Of Expiry :18/11/2022
Place of issue: Malappuram
SKYPE ID : Sabeelcu
Permanent address
Sabeel cu
Chemmala House
Pallikuth Post
Chungathara
Malappuram,
Kerala India
PIN : 679334
Profile Summary:
CSWIP 3.1, TWI Certified Welding Inspector, with 5 year of work experience in QA/QC & Inspection in Oil & Gas sector of EPC & LSTK Company, Onshore Experienced in Manufacturing & Erection inspection of Structure, pipe, piping equipment, Air Compressor Skid, Firefighting line at onshore platform
Academically sound with a Graduate in BE Mechanical Engineering. Post Graduate Diploma in Oil Field Engineering and Quality control. Career Profile-Summary
Name of Organization
Duration
Designation
From To
KCCEC, Kuwait 2nd Aug 2016 Present QC Inspector
Savair Energy Ltd
(Mumbai, India)
June 2013 Feb 2016 QC Engineer
Dehu Engineering India
Pvt Ltd. (Pune, India)
June 2012 May 2013
QC Engineer
Roles & Responsibilities
• Check fit up & welding(after, before, during) operation as per approved test plan, relevant engineering drawing, international standard and project specification
• Arranging (NDT) preventive maintenance progress upon schedule and responsible for the proper inspection request. Verify that the NDT and tests have been carried out as per request review of QA/QC part of final documentations
• Preparation of the Test packs for Hydro testing & Punch and Maintain inspection documentations and prepare inspection reports, correspondence and other written materials.
• Coordinate of radiographic work requirement for any particular task and verifying the interpretation of radiographic films.
• Perform proper NDE method on finished weld on steel fabrication and piping, pipeline tie-in and insulation, existing gas plant installation.
• Inspection of the fit up in the in-process stage with respect of visual, dimensional and orientation compliance as per the approved drawings and specifications.
• Review of Inspection & Test Plan, Material verification, all stages of inspection, welding inspection.
• Carryout Material & Welding consumable inspection and follow Documentation of quality records as per ISO Standards.
• Perform functional checks and Mechanical completion checks.
• Inspection Test Plan according to client’s requirements and as per procedure.
• Preparing the progress schedule and reports and Identify the material (pipes, flanges, fittings etc.) as per the material take off list and isometric drawings during the fabrication. Supervision of construction, installation and erection of pipeline jobs.
• Review of contractor's WPS/PQRs prior to start of welding activities.
• Check edge preparation and fit-ups to verify that fit-up is within tolerance.
• Preliminary welding inspection activities (fit-up, root pass, intermediate, and hot pass, materials trace ability, dimensional checking and orientations of piping components)
• Check and assure that all joints are exposed for examination during pressure test.
• Check vents are open when filling and draining lines.
• Confirm repairs re-testing and re-inspection accordance to specification.
• Over all co-ordination with piping QC team.
• Internal inspection of fit-up, welding of pipeline, joint check-up of pipeline using P&ID and Isometric Drawings.
• Taking joint measurement of work done along with the clients / contractors and preparation of necessary certificate.
• Attending the Progress meeting with client and discussing about the work schedule.
• Ensure blinds are removed and correct gaskets are installed. Personal Strengths:
Good understanding
ability.
Good communication
skill
Team leadership
Ability to work in a
team
Well prepared to adapt to
difficult Situation
Languages Known:
English, Hindi & Malayalam
Computer Knowledge
Auto Cad, Solid Edge, Solid
Work, MS Office, MS word,
& Adobe Photoshop
• Verify that Control Valves and other items that were removed for the tests are replaced.
• Review drawing and specification, responsible for material take-off, withdrawing, and controlling the material, raising construction technical query whatever engineering problem. Making field modification report whatever changes or revision on the drawing, Raising field inspection report whatever problem on the line, make and submit daily progress report, push and motivate people to attain productivity schedule, checking and distribute work activities.
• Study all isometric drawings approved for construction prior to distribution to different areas of work for sub-contractors to undergo.
• Responsible for the fabrication and construction of pipes to its exact location I area as per ISO drawing.
• Monitors the daily and weekly accomplishment of sub-contractors whether or not they have performed ahead of schedule.
• Attends regular weekly meetings with superiors, owner and sub-contractors to whatsoever discussions may arise involving safe.
Project Handled :
• New Gathering Centre, GC-31 in North Kuwait.
Client: Kuwait Oil Company (KOC)
PMC : AMEC Foster Wheeler.
Scope of Work : Civil, Mechanical works
• Installation of Centrifugal Air Compressor at ONGC Uran plant Mumbai.
Client: ONGC
PMC: Certification Engineers International ltd.
Scope of work : Installation of compressor unit, Plant air, Instrument air
& cooling water pipe line, Electrical, Instrumentation &Civil works.
• Laying of New Fire water network at ONGC Hazira Plant Gujarat Client: ONGC
PMC : Fact Engineering and Design Organisation
TPIA : Germanischer Lloyd Industrial Services Gmbh Scope of work : Laying of fire water pipe line, Making of pump house and installation of Pump Units, Sprinklers, Electrical, Instrumentation &Civil works Certifications:
1) CSWIP 3.1 (CWI) from TWI, Cambridge, UK
2) ASNT NDT LEVEL II
• Radiographic Testing (RT)
• Ultrasonic Testing (UT)
• Magnetic Particle Testing( MPT)
• Penetrant Testing (PT)
3) Oil field Engineering and Quality Control
4) Auto Cad 2012
Additional Knowledge:
• Construction Drawings such as P&ID, Piping Isometrics, Equipment, Structural, GAD.
• Familiar with Material Inspection, dimensional check and documentation as per Construction Materials Standards such as ASTM / ASME SA 106, SA 515, SA 516, SA 105, SA 312, SA 240, SA 234 etc. and with ANSI standards of B 36.10, B16.5, B 16.9 etc.
• Thorough knowledge in Welding Standards of ASME Section IX and API 1104. Familiar with Welding Procedure
• Qualification, Welder Qualification, P numbers, Selection of Electrodes, Weld Visual Inspection etc.
• Good knowledge in Radiographic Interpretation of weld joints, Ultrasonic Inspection, Magnetic Particle Inspection and Penetrant Test, Reporting and Documentation.
• Fabrication of Piping, Structure, Pressure vessels and other Equipment’s, documentation of History Sheet, Test Pack Clearing etc.
• Confident to handle the construction and quality control activities as specified in the Drawings and applicable standards and specifications.
Declaration:
I hereby declare that the above mentioned details are true and correct to the best of my knowledge and belief.
Place:
Date: Sabeel cu