PROJECT MANAGEMENT PROFESSIONAL – PROJECT ENGINEER CIVIL

Successful track record as Project engineer civil with 11.5 Years EPC experience for executing prestigious projects within defined cost/time parameters in the field of Infrastructure (Highways, Bridge, Asphalt), Oil & Gas (Upstream, Green/brown field), Pipelines (oil, cross country pipe line) & substation from tier one main contractors at Qatar, Oman & UAE with valid driving license.

Executive summary

Competent, diligent and result oriented civil engineer with 11.5 years EPC experience in high valued projects with knowledge of Quality systems, Building, Highway standards and modern Construction technology

Currently spearheading functions as project engineer civil in china petroleum engineering & construction corps (CPECC) in diverse areas like project management, construction supervision and manpower management

Professional competencies in reviewing the technical and commercial aspects of the project, preparing proposals, budgeting, implementing cost reduction processes while ensuring quality benchmark of the projects

Articulate communicator, skilled at effectively collaborating with client, designer, consultant to freeze the technical parameters, work scope to iron out any ambiguities and providing technical validation for project

Referring American standards (AASHTO,ASTM), British standards (BS, FS), Asphalt manual (AIM), SHELL DEPs & Abu Dhabi municipality standards (ADM), Health & Safety norms (HSE Guidelines) to solve the site disputes

Expertise in supervise and manage project activities including project scheduling and resource allocation with conceptualizing and optimizing resource utilization for maximizing productivity with streamlining operations

Identifying critical issues related to site activities and ensuring timely resolution of queries with Field change requests (FCR) for uninterrupted construction; Implementing strategies for building team spirit

Core competencies

EPC Oil and Gas Onshore Green field Brown field Upstream cross country pipeline Earth work Infrastructure Highways Road Bridges Culverts Piling stone/concrete foundations Under passes Tunnels Utility Drain Work Asphalt Substations Oil Plants Well Heads OHL Tower Gatch Pads Tank farms oil storage tanks AutoCAD, SAP Construction Site Engineering

Civil Project Management Site Construction Management Planning & Scheduling Quality Assurance Drawings & Documentation Crisis Management Analytical Skills Material Management

Professional Experience

China petroleum Engineering & Construction Corporation since Dec 16

(Project Engineer – Infrastructure, Oil & Gas)

AL Tasnim Enterprises LLC (Project Engineer – Bridge, Road & pipeline) Sep 14 to Nov 16

Yuksel Inshaat A.S (Site Engineer – Bridge, Road & pipeline) Oct 11 to Aug 14

Larsen & Toubro Limited (Site Engineer – Foundation & super structure) July 06 to Sep 11

Achievements

Saved 7.50 million AED by replacing fill material from engineering fill to general fill

Saved 0.53 million OMR by finding natural soil and water resource at wadis with proper approval from municipality and ministries instead of buying them from market

Successful achievement of 7.5 million safe man hours without LTI in lusail CP4 project

Successful achievement of 6 million safe man hours in salwa project

Successful upgradation of 2.3 km highway works without damage of existing underground utilities including storm water, Potable water, foul sewer, sewerage line, TSE, SCADA, telephone and 3 kV, 33 kV, 50 kV cables

Achievement of 8 days cycle for slab of 13000 sq.ft by using table formwork system

Projects Undergone

EPC Contractor

China Petroleum Engineering and Construction Corporation (CPECC)

Title

EPC for Mender field development project – phase 1, Mender Oil Field; Abu Dhabi, UAE

Client

Abudhabi company for onshore petroleum operations limited (ADCO); value – 1.14 billion AED

Nature of work

Greenfield & Brown field construction. (110 wells - oil producers, water injectors & disposal) Overhead line (OHL), substation, 3”, 4”, 8”, 14” Nitrogen and crude oil pipeline, Asphalt road.

Responsibilities

Project Engineer- pipe line/flow line, duct banks, RCC culvert, OHL, asphalt road & landscaping

Reviewing subcontractor’s project execution plan (PEP), method statements (MS), construction schedule (P6 Program), manpower and machinery histograms, S curve in association with planning department

Finalising subcontractor’s project quality plan (PQP), inspection test plan (ITP), material approval sheet (MAS/MAR), project HSE plan along with QA/QC and HSE department with shop drawings submission log

Reviewing project drawings and raising technical quarries and FCR to design consultant very periodically and drafting official letters to communicate with consultant and various subcontractors

Supervising and guiding various subcontractors for some special works like topographic survey, existing utilities identification, road marking with continuous micro level monitoring to get the progress

Execution of earth work for asphalt road embankment, OHL, oil pipe line berm and various foundations; Casting of pipe & RCC culverts, flow line duct banks, soil stabilisation, slope protection in dune sand hills

Regularly participating weekly construction progress meeting with employer and sub-contractor to contribute and implement the resolution points on site to attain the progress as per baseline program

Close cooperation with QA/QC and HSE departments in order to ensure, the work is being performed adhering to specification and AFC drawing within stipulated time by promoting pro-active approach.

Median barrier, curb stone, interlock fixing, Construction of speed humps, installation of traffic sign boards, concrete posts and bollards, reflecting studs and road lane marking using thermoplastic paint

Laying of sub grade, aggregate base course(ABC), asphalt pavement like base and wearing courses; As-built drawings preparation with all related information for final submission to client’s record.

EPC Contractor

Al Tasnim Enterprises LLC

Title

EPC for Construction of internal roads at Al-Amerat part 2; Muscat – Oman

Client

Muscat Municipality; Project value - 14.5 Million OMR

Nature of work

Culvert, road, pipeline, rock cutting, utilities, slope protection & asphalt- 40 KM

Responsibilities

Project Engineer- Bridge, culvert, Hill (mountain) roads, pipe line, slope stability & utility works.

Establishing site office with all facilities for client, consultant and contractor. very close coordination with client, vendors, designers and various government ministries for data collections, NOC and approvals

Preparing project execution plan (PEP), method statements (MS), project quality plan (PQP), inspection test plan (ITP), material approval sheet (MAS / MAR) along with QA/QC department

Finalising project HSE plan, construction schedule (P6 Program),manpower and machinery histograms, S curve in association with HSE and central planning department with shop drawings submission log

Negotiation and Finalising various subcontractors for some special works like rock blasting, topographic survey, existing utilities identification and micro level monitoring to get the progress

Execution of pipeline work such as storm water, potable water, irrigation, land drain, sewerage system, raw water pipeline using DI, BWSC, HDPE, UPVC, GRP and vitrified clay pipes

Carrying out rock cutting, shotcrete, rock/soil stabilisation, mass filling, fire hydrant, Irish crossing, (Box, slab, pipe, single & multi cells) culverts, bridges, outer RCC drain, canal earthwork and lining

Laying sub grade, granular sub base(GSB),aggregate base course(ABC), asphalt base course, wearing course for rigid/flexible pavement using polymer modified bitumen

Construction of speed humps, installation of traffic sign boards, concrete posts/bollards, reflecting studs, road lane marking and temporary traffic diversion

EPC Contractor

YukSel – Midmac joint venture

Title

EPC for Lusail expressway primary infrastructure-construction package 4; Doha – Qatar

Client

Qatari Diar; Project value - 1.6 Billion QAR

Nature of work

PSC Box girder bridges, fly over, micro tunnels, interchange, elevated highways & pipelines

Title

EPC for Salwa Road--Phase II. Doha Expressway Package 7; Doha – Qatar

Client

Ashghal; Project value - 1.2 Billion QAR

Nature of work

Box girder / truss bridges, underpasses, pipelines, highways and utilities

Responsibilities

Site engineer - Box girder/ truss bridges, under pass, pipe line, highways & electrical cables

Execution of grading, excavation, earth moving, filling, compaction, soil stabilisation, ground anchors, geo textile, structural fill, blinding, water proofing and protection screed for embankment

Boring, casting, cutting and grouting of cast in situ, continuous, barrette, shoring, friction/cohesion piles with appropriate integrity, Plate bearing, lateral load, dynamic, reaction and tensile load tests

Deep excavation of access shafts by Tunnel Boring Machine(TBM) for micro-tunnelling and trencher machine for pipeline works with continuous dewatering by boreholes to maintain ground water table

Construction of RCC structures like mass raft, pile cap, pier, earth retaining wall, tunnel, truss column, head walls, base slab, deck slab, concourse slabs using doka, peri, acrow form work systems

Casting of superstructure approach slab, vehicular underpass, interchange, abutments, bearing pedestals, parapet wall, installation of bearing and expansion joints filling

Complete cable profile, staging erection, launching girders, dry matching, gluing of segments, piers fixing, anchorage, stressing and grouting of PSC box girder integral structures

Execution of cross country pipeline work such as storm water, potable water, foul sewer, land drain, treated sewage effluent(TSE), irrigation, sewerage network and surface water

Laying of DI, BWSC, HDPE, UPVC, GRP, vitrified clay pipes, reinforced concrete(RCC) pipes with appropriate hydraulic and gas pressure tests

Construction of manholes, access shaft, gullies, pumping station, RCC tanks, collecting manholes, washout, ventilation, air valve chambers related to STP, ETP, WTP structures

Executing of underground utility ducts and cables trenches like telephone, army force, DSSS ducts, SCADA, electrical cables (MV,HV, LV),traffic system cable laying and signal gantry foundation

Laying of flexible & rigid pavements using sub grade, GSB, ABC, asphalt base course and wearing course; mass back filling, median barrier, curb stone, interlock fixing, cycle path and foot path pavements

Construction of speed humps, installation of traffic sign boards, concrete posts/bollards, reflecting studs road lane marking and temporary traffic diversion

Execution of landscaping work such as hardscaping (stamp concrete, raiser planter) and softscaping (trees, plants, grass); As built drawings preparation and submission

EPC Contractor

Larsen & Toubro Limited

Title

Century Bhavan-Office Complex ( B2 + G + 28 + 3 Floors ) Mumbai –India

Client

M/s. Century international; Project value - 180 Crore INR

Nature of work

Construction of office complex building - EPC ( High rise building-134 meters )

Title

ESTANCIA – IT SEZ PARK; Chennai –India

Client

M/s. Estancia Arun Excello; Project value - 110 Crore INR

Nature of work

Construction of IT park & Residential flats - (EPC)

Title

Tata Consultancy Services-IT PARK; Chennai –India

Client

M/s. Tata Consultancy Engineers; Project value - 360 Crore INR

Nature of work

Construction of IT park, substation, auditorium, Pump house ( EPC )

Role

Senior Engineer – sub structure, super structure, Landscape & finishing works

Responsibilities,

Making micro level programs for sub structure and super structure adhering master construction program by ensuring QA/QC and HSE policies

Water proofing, anti termite and RCC works on pile cap, grade slab, retaining wall, ramp, car parking, lift and shear walls; construction of vacuum dewatering floor (VDF) and screed for IT ducts

Post tensioning(PT) works for slab, beams including aligning the PT cables and grouting; casting of pedestal, foundations for fabricated and rotating equipment with all related MEP embedment

Construction of electrical substation, pump house, sewage treatment plant(STP), Hub room, AHU room, lift room; coordination with MEP department for various NSC works

Execution of block work, plastering, screed, VDF, epoxy, floor tiles, painting and cladding; Maintaining ISO reports, variation on measurements, closing NCRs and Preparing sub contractor bills

Educational Qualifications

B-Tech in civil engineering

: Rajasthan Vidyapeeth ( Pursuing - up to 6th sem 71.0 % )

Diploma in civil engineering

: Government polytechnic college – 84% (Anna University )

Higher secondary certificate

: TN state board - 67% ; Senior secondary certificate: TN state Board- 85%

Course on AutoCAD

: CADD training institute; India

Course on IOSH-MS

: Doha industrial safety services(DISS); Qatar

Course on H2S (Level 2 )

: Safety Zone S & S consultancy; UAE

Technical proficiencies

: MS office, MS power point, MS outlook, Auto cad, Internet, SAP, Aconnex,Wrench

LinkedIn

: https://in.linkedin.com/in/ramkumar-kasilingam-711bab8b

Email & Hangout

: ac3czp@r.postjobfree.com Mobile & Whatsapp: 0091-957******* Skype: ramkayramesh

Passport no

: H8250116 – Expires on 2021; GCC Driving License issued from UAE & Oman

Address

: 2/368/3,Navaladian Nagar, Rasipalayam, Mohanur (post), Namakkal,TamilNadu,India-637015

Linguistic ability

: English, Hindi, Tamil, Telugu, Malayalam



Contact this candidate