‘CURRICULUM VITAE’
NAME- DEV BRATA KAR
Contact Information:
Flat no.: 1802, Aristo Height, 34 - PAVILION,
SECTOR-34, NOIDA-201301, INDIA
Contact: +91-901*******, +91-120-*******
E-Mail: ac3baq@r.postjobfree.com,
Passport no: K8491183, Expiry: 17-12-2022
Resume for, FLUIDS (DRILLING / CEMENTING) & DWM Consultant / Drilling Fluid Engineer
Qualification: Post Graduate in Organic Chemistry, University topper
IWCF: Company-man level IWCF certificate, last done in Dec’2014
Work-experience: 1. ONGC Ltd, INDIA, from May’ 1985 – Aug’ 2011. Resigned from ONGC as, ‘Chief Chemist’.
2. KOC, Kuwait: From Aug’ 2011 to Jan’ 2013, as Fluids (Drilling/ Cementing) & DWM Supervisor, for Drilling & W/O, Team-III.
3. Dowell-Schlumberger-Petronas JV: From March’ 2013 – NOV’13, (on contract), as Sr. FLUIDS (Drilling/Cementing) & DWM Consultant, (IPM-Advisor), for the “Samarang-Offshore- Project”, Malaysia.
4. SCOMI, Thailand: From Dec’ 2013 – Feb’2014, as Lead Drilling Fluid Engineering Consultant, for Offshore- Myanmar Project.
5. TOTAL: From Mar’2014 – Apr’ 15, as Sr. Fluids Engg.Consultant (Drilling/Cementing/DWM), for Offshore- Congo- Project.
Currently looking for Job.
Date of Birth: 14, Oct, 1959 ( I would easily pass as no more than 40-45 years, given my physical fitness & mental agility). Valid, Offshore/Onshore Medical fitness certificate, for international assignment
Citizenship; Indian
Personal: Married with two children. Son (elder), Management trainee at Fairmont Hotel, Abu Dhabi; Daughter, pursuing B.tech in Computer Engg. from California State University, USA; Spouse teacher at Delhi Public School, Delhi-NCR, India.
E&P Exposure: 30 years, as Expert-level FLUIDS (DRILLING / CEMENTING) & DWM Supervisor / Consultant, with major Operators (Total, Petronas,KOC, ONGC), 11 years Onshore-Shallow & Deep HTHP Reservoirs; Sour-gas environ-ment; 14 years Offshore, [floaters/ jack-ups/Semi-sub/ Tender], HTHP,Sour-gas,Deep-water & Ultra-deep-water wells,[8 years in Deep-Water, up to 3200+m water depth, working in low Frac-gradient / narrow-drilling-window envir-onment, inherent massive-mud-loss scenarios; well versed with Subsea drilling, Completion, Well-testing & Clean-upprocedures ]; ERD- wells, Drain-holes, SRDH etc. Expert-level knowledge in formulating Drilling Fluid programs; Completion fluids, High density brines, Clean up fluids etc; Logistical supervision, Optimization & maintenance of various types of WBMs, SOBMs, OBMs etc. (11 years experience in OBMs,SOBMs,Non-Damaging OBMs). For 5 years,worked as ‘Stimulation Engineer’, heading Stimulation Lab, at ONGC’s “Institute of Oil & Gas Production Technology”.I am, well versed with Computers, soft-ware (Drilling-related, MS-Office, Adobe-suite, etc.) & QHSE.
While at ONGC, KOC, Dowell Schlumberger-Petronas JV & with TOTAL E&P, I have supervised Mud Engineers from Baroid, MI, Baker-Hughes, KMC, EMEC, & SCOMI. Apart from Drilling Fluid operation, during all these years, my job encompassed, inter alia, supervising ‘Cementing Operations’, Solids-control, Mud-plant monitoring, Rig-site HSE/DWM, Logistics, Basic Corrosion management, etc. During Cementing operations, my job has been, to liaise with the Service Cos. for pre-job simulations, fine-tune the same, by running the inputs in Company-simulation software (viz., Total’s T-desk); take care of the logistics & ensure that the job is executed as per plan. This, I have been doing for nearly 23 years. I have adequate knowledge & understanding for 'Cementing-operation-supervision'.
Waste–Management: I have 24 years of experience in ‘Drill-cuttings-waste-management’. My 14 years Offshore exposure,has been in fairly-stringent ‘waste-management-regime’. I have adequate knowledge of current techniques employed, like ‘Rotomill’, ‘skip-and-ship’, cuttings-reinjection, etc. I have hands-on experience in cuttings-disposal through Rotomill, skip-and-ship.
Objective: Given my wide E&P experience, with Operators & supervising "Mud Engineers" from almost all the major-Service Cos., I am looking towards a role of "Fluids (Drilling/ Cementing)& DWM-Adviser/Consultant", wherein, saliently, I would be able to optimise the Drilling fluid programs-- making it more Reservoir-friendly ; Supervise Cementing Operations, Logistical management, Team- building & mentoring, Trouble-shoot Down-hole problems, etc.; oversee Solids-control measures, DWM & ensure HSE compliance, Implement Completion plans -- so as to maximise Production & last but not the least, achieve this KPI along with significant savings, in terms of Fluid-additives & through ‘zero-NPT/LTI’
Career Profile:
Mar’2014- April’15: With TOTAL E&P, as Sr. Fluids Consultant (drilling/cementing/DWM), for Offshore Congo, drilling ERD/re-entry wells, 2500+m, HT, horizontal-reservoir-sections (using SOBM), onboard Semi-sub Tender. Supervising Drilling fluids Enggs., DF programmes /Cementing (technical evaluation/optimisation of service cos.-proposals, finalizing cmt-program & Job execution-supervision /DWM & Rig-site HSE issues, fit-for-purpose solution.
Dec’ 2013– Feb’2014: With Scomi, Thailand, as Lead Drilling Fluid Engineering Consultant, for Offshore Myanmar Project, drilling ERD wells, onboard Semi-Tender Rig; using WBM / SOBM.
March’ 2013– Nov’2013: With Dowell-Schlumberger-Petronas JV (Operators), Offshore Samarang-Project, as Sr. FLUIDS (Drilling/Cementing) & DWM Consultant, (IPM Advisor), onboard Jack-up Rig, drilling Directional-wells, with Smart-completions; Supervising DF/CMT./COMPL. Ops, DF/DWM engineers, Rig-site Logistics/HSE.
Aug 2011-Jan 2013: Worked with KOC, Kuwait, as Drilling Fluids Engineering & DWM Supervisor; with ‘Development-Drilling & W/O, Team-III). Supervising Drilling fluid Engineers & Drilling Fluid/Cementing/Completion operations/DWM, in the 8 Drilling & 3 W/O Rigs. (POLYMER MUDS / CLAY FREE MUDS/ OBMS/ CLEAN-OUT FLUIDS / COMPLETION FLUIDS). Supervised Mud engineers from MI, EMEC, Baroid & Baker-Hughes;
2008-Aug 2011: Worked as Company-man for fluids (Drilling/Cementing/DWM), at East-Coast (Deep water, HTHP, onboard Floater) & Mumbai-Offshore, India, at various ONGC-contract rigs; lastly with Transocean Rig,‘ Ron Tappmeyer’. Drilling high-tech SRDH, ERD wells (up to 3800+m H’Drift / 1000m horizontal-drain-holes), using SOBM as DF. Supervised DF/CMT. Ops/DWM/ Mud engineers from MI, KMC, Baroid & Baker-Hughes (POLYMER MUDS / CLAY FREE MUDS/ OBMS / CLEAN-OUT FLUID / COMPLETION FLUIDS).
Resigned from ONGC, as Chief Chemist & joined KOC, Kuwait.
2005-2008: As well-site Sr. fluids(Drilling/Cementing) engineer, in ONGC’s Onshore HTHP wells. (POLYMER MUDS / CLAY FREE MUDS/ OBMS / HIGH DENSITY BRINES / CLEAN-OUT FLUID / COMPLETION FLUIDS). Promoted to E-5 level (Chief Chemist) with ‘one year merit-predate’.
1998-2005: As Sr. Offshore Drilling Fluid engineer / Company-man for Fluids (Drilling/Cementing) & DWM; in East/West-Coast, ONGC’s Offshore, Deep & Ultra-Deep-Water Wells, drilled at, up to 3200m water-depth, onboard ultra-deep-water Drill-Ships; Sour Gas environment. (POLYMER MUDS / CLAY FREE MUDS/ OBMS / HIGH DENSITY BRINES / CLEAN-OUT FLUIDS / COMPLETION FLUIDS). Supervised DF/CMT. Ops/DWM/ Mud engineers from MI, KMC, Baroid & Baker. Promoted to E-4 level.
1993-1998: (LAB-OFFICE EXPERIENCE) Headed the Stimulation-Lab, at ONGC’s INSTITUTE OF OIL & GAS PRODUCTION TECHNOLOGY, as Well-Stimulation engineer. Designed Frac & Acidisation jobs on 2D-Frac simulator; Coordinated lab activities for Rock-mechanics related experiments on core samples, Acidization tests on core samples. Worked for other well-production related projects like Water shutoff, Corrosion, Wax, Scale, etc. Promoted to E-3 level.
1992-1993:As Sr-Drilling Fluid engineer, in Mumbai-Offshore, ONGC.
1985-1992: Worked as drilling-fluid engineer / Well-site Chemist, at ONGC’s HTHP onshore gas wells, handling DF up to SG: 2.1. (POLYMER MUDS / CLAY FREE MUDS/ HIGH DENSITY BRINES / CLEAN-OUT FLUIDS / COMPLETION FLUIDS). Promoted to E-2 level.
Joined ONGC Ltd, India, in May, 1985, as Graduate Trainee(E1 level), through All India entrance exam. Ranked in top5, among the qualifiers.
QA/QC: While working at IOGPT (1993-98), implemented ISO-9001-2000, certified by DNV, in the year 1996; as member, Internal-Auditor-Core-Team.
HSE: Well versed with the current Safety & Environmental Regulations.
Training Profile: During the last 30 years, attended numerous trainings at ONGC’s in-house training centers/external agencies; on Drilling Fluid engineering, Cementing, Work-over & drilling-technology, QA/QC, Safety & environment, Managerial-techniques, Sea-survival, etc. Underwent HUET training, thrice. Company-man level IWCF-certificate, done on Dec’2014.
Valid BOSET, HUET, IWCF, & Medical.
Foreign visits:family trips to Singapore, Thailand, Hong Kong, Macau & USA. Employment in Kuwait, Malaysia, Myanmar, Congo.
Last Compensation:1500 USD(net), Day Rate (4 Weeks equal rotation)/ Door-to-Door/ Business-class travel/ Comp. Insurance.
LOOK AHEAD: My strength is self confidence, hard work & perseverance. I am a team-player, with a positive outlook. I amcapable of, inter-alia; shaping Mud-policies/Completion Fluids; effective-DF-optimisation; Cementation job supervision fromrecipe evaluation/selection, simulation to job execution-supervision; Mud-plant monitoring; Drilling Waste Management; Cost-cutting; Down-hole-troubleshooting; basic corrosion-management; Reducing NPT; Procurement of DF-chemicals, Liaison;Effective evaluation of Solid-Control-Equipments; Logistical-supervision; QHSE-policies; Team building, motivator & mentor. I amcapable of working independently and proactively.
Given my vast E&P experience (Offshore/Onshore/Exploratory/Development/Work-Over Wells), as well as, physical fitness & mental agility; I am sure, I would be able to meet any expectation, with sure success.
I shall be able to join, immediately & willing to work anywhere in the world.
Expected day rate: USD 200-800 (negotiable).
Available for Telephonic Interview, anytime or in person, against airfare reimbursement.
--sd--
(DEV BRATA KAR)
Some of the Wells Worked
Month/Year
Operator
Deviation
Location
Depth
Density ppg
Temperature
Mud Type
Water Depth
MAR/2015
TOTAL
900
(NCOSSA) CONGO OFFSHORE
(2600+m Horizontal Hole)
8130 mts
10.8
>1500C
NABM
170m
AUG/2013
SCHLM-PETRON-AS-JV
850
OFFSHORE MALAYSIA
(WELLS: SM104,105,106,85)
5000-6500’
9.5
1500F
HYDROFOIL/OPTAF-LO-DIF
33’
JAN/2013
KOC
900
KUWAIT
5600-8253' MD
9.6
1600F
NON DAMAGING OBM (EMEC-DIF)
N/A
NOV/2012
KOC
880
KUWAIT
9547'MD
7.95
1650F
ND BAROID 100 OBM
N/A
SEP/2012
KOC
670
KUWAIT
7760'MD
10.3
1500F
BARIOD 100 OBM
N/A
JUN/2012
KOC
600
KUWAIT
9530'MD
8.9
1650F
POLYMER-CLAYTROL(BAKER)
N/A
JUL/2012
KOC
240
KUWAIT
5110'MD
10.5
1400F
OBM (BAKER-CARBODRIL)
N/A
MAR/2012
KOC
900
KUWAIT
8297' MD(L1)
(MN-180-M LATERAL)
9.6
1600F
FAZEPRO OBM(MI)
N/A
AUG/2012
KOC
900
KUWAIT
8365-13988'
(SA-0368-61/8" HOLE)
8.1
1600F
EMEC 95:5 ND OBM
N/A
JUL/2012
KOC
880
KUWAIT
9885' MD
(RA-473 / IIND S'TRACK)
12.6
1650F
BARIOD 100 OBM
N/A
SEP/2011
KOC
900
KUWAIT
7180-9380', MD, L0
(MN-178-M LATERAL)
9.6
1650F
FAZEPRO OBM(MI)
N/A
FEB/2010
ONGC
900
MUMBAI OFFSHORE
NEA-5H(RIG-RTP)
3528-4240 mts, MD
8 1/2" HOR- SECTION
8.6
1400F
SOBM (MI-MEGADRIL)
58 mts
APR/2010
ONGC
900
MUMBAI OFFSHORE
NEA-5H(RIG-RTP)
3552-4514mts, MD
6" HOR-SECTION
8.7
1400F
SOBM (MI-MEGADRIL)
58 mts
FEB/2009
ONGC
470
EAST COAST OFFSHORE
G4AF (SAGAR VIJAY-FLOATER)
4053-4257 mts, MD
(6" S- TRACK SEC)
16.2
1700C
THERMADRIL
(BAROID)
225 mts
DEC/2008
ONGC
350
EAST COAST OFFSHORE
G4AF (SAGAR VIJAY-FLOATER)
3003-4260.5 mts, MD
(8.5" PHASE)
16.5
1700C
KCL-PHPA-POLYOL
225 mts
NOV/2004
ONGC
N/A
WEST COAST DEEPWATER
KKD-1(BELFORD-DOLPHIN DP FLOATER)
3500 mts
(8.5" PHASE)
10.5
GLYDRIL (MI), WITH
HYDRATE-SUPPRESSANTS)
1066 mts
AUG/1991
ONGC
N/A
TRIPURA PROJECT
(AGARTALA DOME)
4500 mts
17.5
1400C
CL-CLS-ASPHASOL
N/A
FEB/1992
ONGC
N/A
TRIPURA PROJECT
(TRICHNA)
4700 mts
17.0
1450C
K-LIGNITE-ASPHASOL
N/A
AUG/1989
ONGC
N/A
TRIPURA PROJECT
(GOJALIA)
3800 mts
15.4
1260C
K-LIGNITE-ASPHASOL
N/A
Specific Mud Systems used
Water-Based Mud
Oil-Based Mud
Synthetic-Based Mud
KCL-POLYMER-GLYCOL
BAROID 100
MEGADRIL (MI, BASE FLUID: EDC DIAMOND)
CLAYTROL-POLYMER (BAKER)
NON-DAMAGING OBM (OBM-DIF, EMEC)
CONFI DRILL (KMC, BASE FLUID: SARALINE 185V )
GLYDRIL (MI)
CARBODRILL (BAKER)
CONFI-DENSE (KMC-HTHP SOBM)
THERMADRILL (BARIOD)
FAZEPRO DRILL-IN FLUID (MI)
VERSACLEAN (MI, BASE FLUID: EDC 95-11)
KCL-POLYMER-PHPA-GLYCOL, POLY PLUS (MI)
GEL-POLYMER
CLAY-FREE NON DAMAGING POLYMER MUD
DRILL-IN FLUIDS (FLOPRO NT-MI)
CLEAN-OUT FLUIDS
CL-CLS-ASPHASOL, K-LIGNITE-ASPHA-SOL, ETC.
Problems Encountered / Action taken
MUD LOSS: CONTROLLED WITH CONVENTIONAL LCM PILLS-40 TO 120PPB; PAY-FRIENDLY NON DAMAGING LCM PILLS, GUNK-SQUEEZE; CEMENT PLUG ETC.
STUCK UP (DRILL STRING / CASING/ LOGGING TOOLS: RELEASED WITH NW / WTD SPOTS / CUT & THREAD / REVERSE CUT & THREAD
WELL ACTIVITY / BLOW OUT: CONTROLLED WITH DRILLER'S METHOD / LUBRICATE & BLEED-OFF METHOD
H2S ACTIVITY: CONTROLLED WITH H2S SCAVANGERS / RAISING HYD-HEAD / VOLUMETRIC-LUBRICATION
Drilling Fluids Related Software
MUD WARE (MI)
VIRTUAL HYDRAULICS (MI), T DESK (TOTAL), ADVISE FLUIDS (TOTAL)
(PLUS HANDY WORKSHEETS FROM 'KINGDOM DRILLING, ROUGHNECKCITY.COM, DRILLINGFORMULAS.COM, WIPERTRIP.COM, ETC.)
Some of the salient Training Courses, Seminars etc. attended
Company
Training Course
Completion Date
Location
ONGC
INDUCTION / DRILLING FLUID ENGINEERING / RERSERVOIR-GEOLOGY / DRILLING TECHNOLOGY
3 MONTHS, 1985
INSTITUTE OF DRILLING TECHNOLOGY, DEHRA DUN, INDIA
ONGC
HAELTH SAFETY & ENVIRONMENT POLICIES
1 WEEK, 1987
INSTITUTE OF DRILLING TECHNOLOGY, DEHRA DUN, INDIA
ONGC
ADVANCEMENTS IN DRILLING FLUID TECHNOLOGY
4 DAYS, 1988
REGIONAL TRAINING INSTITUTE, CHENNAI, INDIA
ONGC
WELL BORE STABILITY & RESERVOIR MANAGEMENT
1 WEEK, 1990
INSTITUTE OF DRILLING TECHNOLOGY, DEHRA DUN, INDIA
ONGC
ADVANCES IN CEMENTING TECHNOLOGY
1 WEEK, 1992
REGIONAL TRAINING INSTITUTE, PANVEL, INDIA
ONGC
WELL INTERVENTION, LATEST IN WATER SHUT-OFF & WELL STIM.
1 WEEK, 1994
INSTITUTE OF DRILLING TECHNOLOGY, DEHRA DUN, INDIA
ONGC
CURRENT MANAGERIAL PRACTICES
2 WEEKS, 2003
MANAGEMENT DEVELOPMENT INSTITUTE, GURGAON, INDIA
POGL/IMPACT SOLUTIONS, UK
NO DAMAGE RESERVOIR DRILLING
4 DAYS, 2006
POGL, ASSAM, INDIA
ASCI, HYDRABAD
ORIENTATION PROGRAM FOR CREATIVE LEADERSHIP
4 DAYS, 2010
ONGC, MUMBAI, INDIA
ONGC
IWCF –LEVEL-4
1 WEEK, 2011
WELL CONTROL SCHOOL, IDT, ONGC, DEHRA DUN, INDIA
SCHLUM-PETRONAS-JV
BOSET
3 DAYS, 2013
SEQU OFFSHORE SAFETY SDN. BDH., MALAYSIA
TOTAL
HSE- Module – 7
1 day, 2014
TOTAL E&P, CONGO.
TOTAL
IWCF-LEVEL-4
1 WEEK, 2014
WELL CONTROL SCHOOL, IDT, ONGC, DEHRA DUN, INDIA