Resume

Sign in

Primavera Planning Engineer

Location:
Houston, Texas, United States
Posted:
January 30, 2018

Contact this candidate

Resume:

Assem Wood

*** ******** ******, *******, **

Mobile: 1-832-***-****

Email: ac39sa@r.postjobfree.com

USA Work Permit holder (no Sponsorship required in future) Career Summary

I am a Project Controls (CEPS) member with engineering background and extensive experience in the oil & gas field on a wide range of construction projects both Greenfield and Brownfield. I have good knowledge of Second Generation and Sour Gas Injection Plants in Tengiz field (Kazakhstan), Operations and Maintenance of process equipment such as heat exchangers, compressors, vessels, reactors and etc. I have been a part of Turnaround team and participated in execution of the largest Tengizchevroil (TCO –a joint venture between Chevron, Exxon Mobil, Lukoil and KazMunaiGaz) SGP/SGI 2012 Turnaround project. Have an extensive experience working in TCO Major Capital projects including critical Cargo Transportation Project which is the part of the Future Growth Project (FGP).

I am also tenacious and pragmatic professional with a keen eye for detail and analytical thinking skills; proven success monitoring and advising at all levels on scheduling – collecting physical installed quantities from the construction sites, evaluating the schedule, forecasting and estimating cost. Commercially astute with excellent interpersonal communication skills (speaks fluent Russian, English and Kazakh) and is quick and willing to assimilate and apply new working procedures. Technically-skilled in the use of MS Office suite

Main areas: Planning, Reporting

Work Experience

Worked on TCO CaTRo project for construction of the Cargo Offloading Facility, Cargo Storage Facility, Causeway and Roads between Prorva and Tengiz fields for transportation of the heavy process equipment required for the expansion of the Second Generation and Sour Gas Injection Plants with TIC of over $2bln budget during all FEED phases (Engineering, Procurement and Construction).

I was responsible for two major roads construction and sheetpiles, precast piles installation scope. I also developed the Recovery Plan after major surge at the project. I oversaw and mentored two major Contractor Planning teams supervising their baseline schedules and progress reports, logics, forecast and histograms as well as developing the baseline schedule, updating the live schedule, forecasting VOWD for the scope I was assigned to and assisting Lead Planners with various tasks. Duration: July 2012 - March 2017

Company: Tengizchevroil

Department: FGP, Cargo Transportation Route Project Position Title: Field Planning Engineer

Responsibilities:

Maintain Primavera Schedule:

o Develop and implement fully integrated schedule of cross-functional interfaces between engineering, procurement materials, estimating, cost management, construction and commissioning, safety, quality

o Report EPC progress through activities and deliverables using earned value (EVM), identify and assist in analysis of project variances, assist in developing corrective actions and coordinate resolution of variances

o Identify, evaluate and report deviations from the Baseline schedule; manage impact of change and trends and resulting in re-baselines;

o Interface with project team disciplines to update schedule with actual progress against baseline o Evaluate critical path and identify critical activities and advise to Project Management; o Update the Resource loaded Construction and related Procurement, Engineering schedule on the weekly basis which included actual progress of activities, installed quantities, manhours, material, remaining duration, analyzing the Live schedule against the established Baseline and identifying the slippages

o Involved in the Project Re-Baseline development

o Developing the schedule and estimating the budgeted manhours and material and duration with the appropriate logical sequence based on the BOQ of the Engineering Drawings and the Contracts

(ITC’s)

o Interface with the Construction Management to align the construction sequence in the schedule o Coordinate with Senior Planning Engineer the effective implementation and monitoring of Look- Ahead-Schedule including the project actual accomplishments o Reporting to the Project Management Team the status of the actual progress against the forecast plan and provide corrective actions necessary if the planned schedule is not achieved o Progress monitoring of specific project areas on a regular basis. Resolve any problems, bottlenecks/scheduling conflicts. Prepare and maintain package work plans and monitor progress to achieve on time or earlier deliveries to keep the project on schedule

Weekly update of the Progress Measurement Report (activities physical progress, actual manhours, material installed against the forecast/budget and measuring Earned Values, KPI’s)

Developing and updating the progress reporting tools and producing Look- Ahead schedules to the Project Leadership Team such as Progress S- curves and Histograms, Weekly Dashboards, Contractor Performance Sheets

Proposed and developed the Recovery Plans for two major scopes of the project to achieve the target dates and monitored the actual recovery work against the forecast

Assessed the required manpower and required bedding capacity of the Contractors and monitored the Contractor Camps construction to ensure construction progress is in line with the schedule to be ready for the work commencement

Updating the TCO Weekly Reports for FGP Management and preparing the visual aids such as the Schematic Report and the Site Photo Report

Prepare the Monthly Cost Forecast (VOWD) based on the updated schedule for the Cost Control Team

Overseeing the Construction Contractor to make sure all the Planning Deliverables are provided in an accurate manner such as Daily/Weekly/Monthly Reports, Schedule updates against the Baseline, S-curves and approving them for issue

Mentoring and providing guidance to the Contractor Planning Engineers at the early stage of mobilization to ensure their schedule and report updates are correct and in line with the TCO requirements

Site visits to monitor the physical progress of the work against reported schedule and to complete Behaviour Based Safety program

Continues interface with the Construction, Quality Control, Design Engineering and Quantity Surveyor Teams to ensure all aspects of the project were on schedule and within the parameters of the budget.

Facilitate and lead the Planning meeting with the Contractor Planning Engineers for planning/schedule development

Support development of Project Controls Standards and Procedures. Supervise and supports the compilation of historical data

Compliance with the Company HES requirements and procedures Duration: August 2009 to July 2012

Company: Tengizchevroil

Department: SGP&SGI Turnaround Project

Position Title: Planning Group Assistant/Lead Translator Responsibilities:

Assigned to the Turnaround Planning Group as an Assistant/Translator who is experienced in Primavera data base translations. I and my b2b were able to translate over 26, 000 activities in Primavera schedule which used to be updated continuously during SGP Turnaround Project. Assisted Lead Planner with Primavera update

Develop and input the stepped out activities based on the job packs to the Primavera and monitor the site actual progress

Support effective communication between TCO Turnaround Group and Contractors such as Halliburton, Denholm Zholdas, Schlumberger and etc.

Provide high-quality technical written translation and verbal interpretation services to various groups within TCO and Turnaround Group.

Provide high-quality technical translation of multidiscipline documentation supported by a technical degree that ensures adequate understanding.

Interpret at daily and staff multidiscipline meetings of different levels, production issue discussions, negotiations, etc. with TCO, Contractors and visitors specialists

Translation on site during Turnaround activities.

Have been SGP site Translator to provide site translation during SGP HRSG boiler shutdown in 2010 for NEM Vendors.

Have been assigned as SGI site translator during SGI mini-shutdown, DHC line repair.

Overall assistance to SGP Planners during SGP TA 2012 Duration: December 2007 to August 2009

Company: MunayGazKurylys

Department: Construction and Planning

Position Title: Planning Analyst (Civil Site Preparation Stage) Responsibilities:

I was assigned as the Site Planning Analyst to monitor the site physical progress and duties included:

Monitoring the site physical progress and installations

Preparing the daily and monthly reports and providing them to Lead Planning Engineer

Updating the schedule on the weekly basis

Preparing the step-outs, manhours, material based on the Job Packs together with the Discipline Engineers for the schedule

Duration: June 2006 to December 2007

Company: Alliance Retail Banking Group

Department: Retail Business

Position Title: Branch Office Manager

Responsibilities:

Overseeing the day-to-day operations of the Bank including the supervision of 30 staff

Preparing the financial weekly, monthly reports to the Head Office

Responsible for Business Development and achievements of KPI’s set by Head Office

Manual calculation of all staff salaries and ensuring taxes and other benefits were paid to the correct government departments

Implemented the Bonus Structure locally with approval from Head Office which was later rolled out to all other branches

Education

University: West Kazakhstan Engineering University Degree: Bachelor of Civil Engineering

:

University: Eurasia International University of Languages and Management Degree: Bachelor of Economics

University: West Kazakhstan State University

Degree: Teacher of English

Professional Trainings:

Primavera P6 certificate –Advanced Training (Moscow Project Management University)

Tengizchevroil H2S training, Work at height training, SCBA and Confined Space Entry training

Driving Licence (categories B&C)

Languages

English –advanced

Russian – advanced

Kazakh - native

Spanish – currently learning

Career Achievements

Promoted from Planning Analyst to Planning Engineer in CaTRo Project

Promoted from Retail Manager to Branch Office Manager

Recognition certificates from the Project Managers Personal information

Date of birth: February 7, 1985

Marital status: married

Recommendation Letters are provided below



Contact this candidate