Sign in

Supply Chain Manager

Temecula, California, United States
January 24, 2018

Contact this candidate


***** *** ****

Temecula, CA *2592

Home (951) ***-****

Cell 951-***-****


To Whom It May Concern:

Please consider my resume as application for employment with your company. I am a Senior Operations / Manufacturing / Supply Chain Executive with over 25 years experience. I have a history of saving my employers several times my annual salary. I am a problem solver and can quickly add to the bottom line. In October 2009, after the closing of the Beckman Coulter plant, I joined IMS-ESS Aerospace, which closed in 2013, at which time I helped set up and incorporate a medical/health care group.

As the Site Director at Beckman Coulter, a $4 Billion medical device / reagent manufacturer, I led the efforts of the Lean Team to reduce the production foot print by 40%; reduced Finished Goods inventory from over $12 Million to less than $1 Million and improved on-time customer deliveries from 86% to over 98%. I improved efficiencies by 30% year over year, and improved revenue per employee from an average of $39,000 per month, to currently over $93,000. I improved first pass yields by implementing Pareto Analysis, and resolved all production induced errors. I managed the outsourcing of components, sub-assemblies and OEM/Turn Key projects. All annual goals were met or exceeded. My team was awarded a Certificate of Appreciation by the Senior Vice President for introducing a new product in record time with minimal validation issues. I had responsibility for Production, Engineering, Test, QC, Purchasing, Planning, Warehouse, Ship/Rec, worldwide inventory and supply chain. Inclusive in that is a 40 acre facility that has 11 buildings with 1,000,000 sqft under roof. There was a 65,000 sqft machine shop, a 54,000 sqft plastics shop where we had 18 blow mold, injection mold and extrude machines, a 25,000 sq ft print shop, a 55,000 sqft bio-chem lab, and about 250,000 sq ft production area for diagnostic instruments. I managed an annual budget of $200 Million, managed ~100,000 SKU’s, reduced supplier base from over 1250 to less than 450 through consolidation and metrics evaluation. I sat up JIT, VMI, Kanban, with vendors.

At PCOM, I managed Worldwide Operations and was responsible for 7 manufacturing sites (one in Germany, one in Florida, two in California, one in Italy, one in China and one in London). I reorganized the manufacturing processes to allow lead times to be reduced from 16 to 8 weeks ARO, and improved system performance by developing standard ATE systems and system to system testing for millimeter wave radio equipment. I implemented Halt/Hess testing to improve field performance from 80% install yield to over 98%. Overall production improved by 35%, and I was able to design and install a low cost burn-in system which reduced field failures in the first year by 50%.

At Synergie Wellness Products, I was one of the original employees. I redesigned the product to reduce the models from 3 to 1, which saved about 40% floor space and inventory requirements. I implemented “lean” at the start of the process and was able to reduce the cost of materials and labor 75% from the original estimate. After getting production up and running, I hired and trained the production, sales and marketing, and QC staff. I headed up the Regulatory department and filed the required 510K forms. In addition, I was responsible for the acquisition of a Nutracutical company. I merged the production of health foods, vitamins, beverage production into the San Diego facility. (High Speed Liquid Fill)

I have implemented ISO-9001 certification in three companies (I am also a Certified Internal Auditor), I have implemented FDA / cGMP / ISO-13485 compliance for Medical Equipment Manufacturing. My utilization of Statistical Process Control and Pareto Analysis processes has helped me establish improved and consistent quality levels which have met the requirements for the “Ford Q-1” Quality Award (at Philips), in a plant where we were shipping over 10,000,000 (ten million) components per day. I am a member of RAPS (Regulatory Affairs Professional Society) and OCRA (Orange County Regulatory Affairs group) and AME (Association for Manufacturing Excellence)

It would be my pleasure to present my qualifications and experience to you for your evaluation to see how I can best fit into your organization and help fill your needs. I am interested in obtaining a position as Vice President / GM, COO, or Director of Ops / Mfg / Supply Chain.

I am a strong team participant / leader and consider myself a mentor. I am available for interviewing and will consider relocation. I can be reached at the phone number above at any time. I can be at your facility or anywhere you specify within 48 hours. References are available on request.

Thank you in advance for your time and consideration.


Robert Lorin Parker


33057 Fox Road

Temecula, CA 92592

(951) ***-**** home – message

(951) ***-**** – cell preferred


Senior Executive with over 25 years experience in Manufacturing / Operations Management, Materials / Purchasing / Inventory; Plant Management; P&L, Supply Chain in a wide variety of products and processes from Semiconductor / Wafer Fab, Consumer Electronics, Industrial Capital Equipment, Medical Devices, RF-Telecom Equipment to Health Care Products. I have a history of reducing costs and saving several times my salary; I have several awards and certificates of appreciation for this effort. I have managed re-organizations, downsizing, Mergers & Acquisitions, and Start-Ups.


NATURES GRACE ACUPUNCTURE CENTER: General Manager, 9-2013 to present

Negotiated purchase of clinic. Incorporated business office, acquired 4 other clinics as DBA’s, manage office, billings, collections appointments, training, collections. Manage purchasing of supplies, stock. Responsible for patient/client relations.

IMS-ESS: Director of Operations & Quality 10-2009 to 7-2013 (company closed)

IMS-ESS is an aerospace provider, Provide components for commercial and defense airplane and UAV components. I have managed the FAI certification for new contract production, and have implemented Corrective Action programs to update systems and processes to comply with customer requirements. I have implemented Kaizen and Continuous Improvement systems. Also as the Quality Director, I implemented the Quality Management System, and got ISO-9000 and AS9100 certifications awarded as well as Composite Manufacturing Certs.

Beckman/Coulter: Manufacturer of medical diagnostic instruments and reagents. 5-07 to 10-09 Plant closed

Site Director, Operations / Supply Chain (Plant Manager)

Responsible for the manufacturing / Supply Chain of medical diagnostic instruments as well as chemical/bio-reagents compounding. Responsible for production, materials, FG/raw stock planning, production control, Manufacturing Engineering, Purchasing, ship/rec, warehouse, QC, Test and Validation, Outsourcing of components, subassemblies and OEM/Turnkey projects.

Implemented Toyota Lean processes principles and reduced production space footprint by ~40%

Trained teams in Kaizen, 5-S, Continuous Improvement.

Headed up task force to improve reagent (SNPware) yields from 75% to over 90% and no “stock-out” in FG.

Implemented Pareto Analysis in FPY problems resolved top 10 in first 6 months. Eliminated production induced errors to achieve and exceed all yield goals.

Set up Kan Ban for materials, reduced stock by over $10,000,000 and increased customer satisfaction from 86% to over 98%.

Reduced the number of vendors from over 1,200 to ~450, while maintaining ~100,000 SKU’s.

Reduced scrap from shelf life expiration by implementing smaller production runs, ordering smaller quantity.

Reduced overall headcount while increasing production output by 30% year over year.

Reduced Indirect to Direct employee ratio from over 70% to less than 55%.

Met or exceeded all division goals in 2008 and 2009.

Given Cert of Appreciation by Sr. VP for introducing new product in record time with minimal validation issues.

Reduced overtime by 75%.

Synergie Wellness Products: 10-98 to 5-07 company sold / relocated

President – COO – General Manager

Manufacturer of Medical Devices, Health Care products, cosmetics, X-Ray Imaging.

Processes: Plastic Injection Molding, Blow Molding, Liquid Fill, Lotions/Soaps, Batch Chemical Compounding Mix, Metal Stamping, Electro-Mechanical Assembly Test. Also headed up Customer Service and Field Support group. Managed internal / external logistics, LTL, 3PL, direct delivery. Health food / beverage production and high speed packaging

hired to “Start-Up” new company and mass produce product.

Redesigned product for more durability and reliability

Implemented Lean Manufacturing process

Negotiated price reductions on raw materials

Implemented FDA, ISO process controls and systems

Reduced the cost of manufacturing by more than 70%

Designed unique product (patent applied for)

Set up and managed the field service and repairs for technical service.

Implemented Kaizen, Ishikawa, and Kan Ban, Lean Manufacturing Practices

Managed the Merger / Acquisition of other company

Set up the high-speed liquid rotary/in-line fill lines for drinks, tonics

Managed the production of solid dose vitamins, supplements, health foods

Managed the packaging, order fill operations

P-Com Corp; Manufacturer of (RF) Millimeter Wave Wireless Communication Systems 9-94 to 9-98 (Company Closed)

Sr. Director, Worldwide Operations / Supply Chain: I Managed 7 Facilities. 1 in London, 1 in China, 1 in Italy, 1 Germany, 1 Florida, 2 in California

Processes: RF Component Assembly/Test, PCBA (SMT-T/H) Assembly/Flow Solder, Test, Systems Assembly/Integration/Test for Cell Phone Relay Antennae systems

Consolidated several groups into “Technical Operations” including New Product Introduction, Manufacturing Engineering, Process Engineering, Test (ATE) Engineering, RF Production, Digital Systems Production, Materials and Inventory Control.

Resolved PCBA (SMT) Yield problem, resulting in improvements from 30% (MODEM PCB) to over 90%

Worked closely with R&D to establish a “New Product Introduction” Policy which reduced “time to production” by over 75%

Implemented “Peer Inspection” process to eliminate the need for QA Inspectors on the production floor.

Hired as Director of Materials, negotiated new, lower cost contracts with “Turn-Key” vendors

Reduced existing inventory from $40 Million to under $25 Million and eliminated “stock-outs” at Kitting

Implemented JIT

Implemented Kaizen

Implemented Continuous Improvement

Implement PIT (Performance Improvement Teams)

Implemented Cycle Counting

Implemented “Pareto Analysis” / Failure Analysis on 1stt pass failures

Eliminated 3rd shift while increasing output by 25%

Implemented Doc. Control Implementation Team, which eliminated problems with vendors supplying wrong “Rev”

Designed and Implemented “low cost burn in system” which reduced field failures by more than 50%

Implemented HALT/HASS testing to improve product reliability

Implemented “Vanilla Level Semi-Finished Goods” inventory to reduce lead-time form 16 weeks to 8 weeks.

Director of Materials / Supply Chain: (Promoted to Sr. Dir. of Worldwide Ops after 6 months)

Negotiated New Purchase Contracts with major suppliers in Europe and Asia

Negotiated “Turn-Key” Contracts with Sub-Contractors

Established “OFF SHORE” Supply Chain for critical parts. Worked with Italy, France, Britain, Taiwan, Mexico, Germany and China

Implemented ECO notification system with vendors to assure all changes were acknowledged and implemented.

Negotiated better pricing on parts and assemblies based on better test yields. Improved costs per unit by over 28%.


* PhD Business Admin. Chelsea University, Boston, Ma GPA = 3.90 (Magna Cum Laude)

MBA Business Management, National University, San Diego, Ca GPA = 3.59

BA Business Admin. National University, San Diego, Ca GPA = 3.75 (CUM LAUDE)

Certificates in Project Management (Kepner-Tregoe), Electronics, MRP, JIT, SPC, cGMP, FDA, ISO-9000/2000 Internal Auditing, Continuous Improvement, Lean Manufacturing, Kaizen, Ishikawa, Value Stream Mapping, 5 S, KanBan, ISO-13485


Pioneer Electronics: 1990 to 1994 North American Division Manager, Repair & Refurbish

Philips Electronics Components Group 1985 to 1990 Director of Manufacturing

Hughes Aircraft Company 1980 to 1985 Manufacturing Engineering Manager

Contact this candidate