Six Sigma Green Belt with experience in manufacturing operations, engineering, supply chain, facilities/equipment maintenance, and process optimization. Known as a reliable, task-oriented person with a strong work ethic, proven leadership skills, and ability to complete challenging assignments. Has a demonstrated history of analyzing problems and providing creative solutions. Experienced at fostering cross-functional collaboration to influence positive change.

Skills / Training

Six Sigma Green Belt Certificate, Professional Training – Cause Mapping; Alstom Safety Leadership; Fall Protection; EES Legal Sourcing; Legal Aspects of Purchasing; Contract Reading, Writing & Negotiating; Commercial Awareness (Tenders & Projects), Proficient with AutoCAD, PowerMax (SAP), and Microsoft Outlook/Word/Excel/PowerPoint

Professional Experience:

General Electric, Chattanooga, TN

Project Manager - 2016 to 2017

Orchestrated plant decommissioning activities, acting as a liaison between GE and all contractors. Coordinated the auction, removal, and shipping of equipment and spare parts sold. Arranged schedules and assigned tasks for removal crews; directed a 20-person demolition team. Organized the shutdown of gas, electrical, and plumbing services with public utilities. Sealed the manufacturing area, ensuring compliance with GE shutdown and safety protocols.

Coordinated the closure of this 500,000-square-foot facility concurrent with production ramp-down requirements over a six-month period.

Spearheaded the removal of 9.75 million pounds of scrapped product and equipment for recycling.

Alstom Power, Chattanooga, TN

Manager of Manufacturing Engineering and Production Maintenance - 2014 to 2016

Led electrical engineering and maintenance personnel responsible for development and upkeep of all equipment and facilities comprising a 500,000-square-foot plant. Directed electrical engineers in the redesign of

second-generation robotic welding equipment. Ensured proper allocation of engineering support and maintenance technicians on a 24/7 schedule. Managed and tracked inventory of equipment and parts. Negotiated service contracts with vendors; approved new contracts and renewals. Audited onsite safety and scope performance of contractors.

Drove modernization of a second-generation robotic welding station and designed a patent-pending twin-torch fixture which doubled workstation output.

Reduced welding gas costs 90% by analyzing consumption, redesigning and upgrading infrastructure and implementing gas supply system upgrades. Achieved a $500K+ annual operating cost reduction.

Alstom Power, Chattanooga, TN

Senior Manufacturing Engineer - 2011 to 2014

Conducted time studies, observing and analyzing production processes to identify opportunities for optimizing efficiency, safety, and cost. Created solutions, influenced change, and launched follow-up studies to confirm achievement of desired results. Completed capital project proposals and led workstation modernization and new-equipment installation.

Installed the first robotic welding station on the production floor, including coordinating all in-house tooling and fixture design functions on the first- and second-generation stations.

Modernized the tube bender tool handling system, reducing labor from 16 man-hours per tooling change to 1 man-hour. Reduced lost-time injuries from an average of four per year to zero reported injuries.

Launched the introduction of new tube swaging equipment, including updating the work center, redesigning the furnace conveyor system, and designing a tool storage system, tool handling devices, work platforms.

Alstom Power, Chattanooga, TN

Supply Management Specialist - 1999 to 2011

Managed fabrication sub-contracts in support of production. Led the purchase of supplies, goods, parts, and equipment for manufacturing processes and tracked MRO inventory. Negotiated and secured contracts for consumable purchases. Maintained relationships with 14 MRO suppliers. Provided supply chain support for facility engineering and project purchases.

Conceived and implemented an e-commerce system which eliminated 4,500+ redundant purchase orders annually. Realized a $1.2M annual overhead cost savings.

Researched and deployed an automated MRO checkout and reorder system which achieved a $780K+ reduction in waste, a >60% reduction in-house inventory, and made two supply chain FTEs redundant.

Asea Brown Boveri, Chattanooga, TN

Principal Methods Engineer and Manufacturing Supervisor - Prior to 1999

Led the design, construction, and operation of the explosive forming theater, including designing explosive forming tooling, defining explosive handling and detonation protocols, and managing the explosive forming crew. Led the steam drum and header fabrication departments as well as ship bulkhead production for the Double Eagle oil tanker.

Launched the explosive forming capability. This process eliminated 150+ feet of pressure vessel welds in Haynes 230 turbine casings.

Influenced the optimization of 14 steam drum component patterns to 3 patterns, lowering manufacturing costs, simplifying part layout and installation, and eliminating QA issues

Optimized the production of tanker bulkheads from one per week to one per shift.