OBJECTIVE

Seeking a position where my commissioning, integration, installation, maintenance and repair of telecommunications equipment for wireless communication systems can be utilized.

TRAINING

US Cellular

Nokia Siemens Networks Flexi

LTE BTS Commissioning and Integration

4G-LTE- Multiradio-002-FLSUSBC

2013 Ericsson LTE Training

2010 Nokia UMTS BTS Training

EXPERIENCE:

MGA December 2016-Decmber 2017

Provided switch support and engineering support for Tmobile installs and splicing fiber (Fusion).

Upgrading Tmobile switching and cell sites.

L700 and L1900 upgrades and install, commissioning and integration.

Nokia December 2015-October 2016

Integrator

Aberdeen, Maryland-Tampa, Florida (ARMY Aberdeen Proving grounds) Switch work performed inside the ARMY base. Ran power and data. Installed LTE FSMF and radios.

Installed csr and routers.

Commissioned and integrated all system modules.

Performed extensive trouble shooting.

Time Warner Cable January 2015-December 2015

Wi-Fi Installer

Installation of cable, home phone, internet and Wi-Fi with routers.

Ran cables and tested cables, performed trouble shooting, and made cables to replace old cable.

Performed hook up of modems and DVRs.

Performed trouble shooting and equipment swaps.

Nokia March 2014-January 2015

Installer

FBBC upgrades waive one project consist of the installation of the FBBC into the FSMF.

Installation, integration, commissioning and troubleshooting are done as well.

Sending emails of screen shots from BTS Site Manager before install and after install are completed by the engineer.

Installed copper wire and data fiber optics.

Coordinating installation, testing, and troubleshooting of transmission facilities OC48, T3, T1, and DSO.

Upgrades are complete once task is done and engineer contacts GNOC and NOC once alarms are not present. Multiple sites are done daily.

Updating daily logs with site-specific information; and composing clear and concise reports for system documentation.

TCP/IP, MPLS, OSI, Frame relay, ATM, X.25, RIP, OSPF, BGP, ISDN, SS7, other LAN/WAN protocols.

T-Mobile/NSN March 2013-March 2014

Installer/Integrator/De-Commissioner

Performed upgrades and troubleshooting of Um 1900 and 2100 from FSME to FSMF.

New alarm hook ups, power de-installation from decommissioning sties.

Primary duties included installation, integration, commissioning and troubleshooting. Performed outer swaps and port switching.

Maintenance and installation of equipment at various telecommunication sites in the market were executed by me.

Installed copper wire and data fiber optics.

Problem-solving skills and breaking down complex problems to isolate outages to restore services were done by me.

Scheduled each workday for optimum efficiency for the greatest benefit, and work with limited supervision, while maintaining a high regard for personal safety, the safety of company assets and employees, and the general public.

On another project, performed FBBA upgrades waive one project consist of the installation of the FBBA into the FSMF three sectors.

Sending emails of screen shots from BTS Site Manager before install and after install are completed by the engineer. Upgrades are complete once task is done and engineer contacts GNOC and NOC once alarms are not present. Multiple sites are done daily.

US Cellular/Nokia Siemens Networks March 2012-March 2013

Installer/Integrator

US Cellular project waive 3 consisted of the installation, integration and commissioning of Nokia, Siemens, Networks Flexi, LTE, BTS, and 4G-LTE-Multiradio.

Complete install, wire routing, software updates and ret settings along with test calls were performed.

Wire building and scaling of these builds were depended on the specific location.

Nexius/T Mobile/Nokia March 2011-March 2012

Installer/Integrator

T-Mobile Modernization Project.

Consisted of the installation of FXFB Radios, FSMB and FSME Modules into the FCOA Cabinet.

Ran Coaxial jumpers from the top of the Tower connecting to diplexers on the ground.

Completely installed COVP, running the Hybrid Cable from the Top Tower COVP to the ground COVP.

Ran power from the COVP to the power Cabinet, also from FSME and FSMB mods to the power cabinet.

Built T1s’s for integration and commissioning purposes.

Installed copper wire and data fiber optics.