Resume

Sign in

Project manager

Location:
Jeddah, Makkah Province, Saudi Arabia
Salary:
29000
Posted:
January 20, 2018

Contact this candidate

MECHANICAL ENGINEER

Page *

Abdulmonem Ahmed Abdulmonem Salem

SUMMARY

Profile: Male

Status: Married and have Two Children

Date of birth: 9 September 1983

Nationality: Egyptian holding the Australian permanent residency

Current Location: 39 TULLOCH DRIVE SAINT CLAIR

5011 SA ADELAIDE

Current position: Projects Manager

Mobile:+966-*********

personal email:

ac337t@r.postjobfree.com

work email:

abdelmonem.asalem@desig

nbuild-sa.com

Companies’ name I work with in Saudi Arabia: (Saudi Electricity Company, Bakri international energy company ltd.) Iqama status: Transferable

EDUCATION

Jun 2001 - Feb 2008 Arab Academy for Science, Technology and Maritime Transport, Alexandria - Egypt

Mechanical engineer, Bachelor (BSc/BA), GPA 2.2

LANGUAGES

Arabic Native

English Fluent

April 2008 - Nov 2009

DAR ALTASMEEN

Position: Mechanical Engineer

Maintenance of above ground carbon steel crude oil Tank No. 2 in Rabigh Power Plant RPP1 capacity of 64,000 cubic meters including oil transferring sludge removal and washing, replacement of existing sand bad, Bottom plates, heating coils, valves, floating suction maintenance Blasting/ painting internal and external, shell and roof plates testing with UT Gauge test and replacing damaged plates if not matching the API 650 standards. Radiographic test for shell new installed plates, vacuum box test, and hydrostatic test. MECHANICAL ENGINEER

Page 2

December 2009 - March 2010

Saudi Electricity Company

Position: Mechanical Engineer / Maintenance Department Steam turbines units in shoiba power plant

1- Preventive and corrective maintenance. On common and auxiliary equipment. 2- General view about the power plant and steam cycle, air cycle and gas cycle 3- Boilers maintenance water wall repair cutting, fitting, welding and testing 4- repairing of steam high pressure pipe.

5- Good knowledge about the design and construction of crude oil tanks high capacity.

April 2010 – until now

BAKRI INTERNATIONAL ENERGY COMPANY

Projects Achievements Under My Management :

1. King Abdulaziz military city - TABUK

July 2010- November 2010

Tank number 3 refurbishment and maintenance

Project value: 1,600,000 SR

Position: Project Manager

Diesel Tank number 3

(30.5 meters diameter 10.8 height)

Capacity: 2.000.000 Gallons Diesel

Scope of work include (replacement of sand pad, bottom plates of 8 mm, sand Blasting, painting, radiographic test, vacuum test, UT- test and hydrostatic test) MECHANICAL ENGINEER

Page 3

April 2011- July 2011

2. Tank number 1 refurbishment and maintenance

Project value: 1,850,000 SR

Position: project Manager

Diesel Tank number 1

(30.5 meters diameter 10.8 height)

Capacity: 2.000.000 Gallons Diesel

Scope of work include (replacement of sand pad, bottom plates of 8 mm, sand Blasting, painting, radiographic test, vacuum test, UT- test and hydrostatic test)

August 2011 – Jun 2012

3. Installation of 3 X 10,000 cubic meters steel distillate oil tanks is Makkah power plant SEC Consultant: Saudi consultant

Project value: 37,000,000 SR

Position: Construction Manager

Scope of work include excavation of 50,000 cubic meters and geotechnical report Installation of fuel tank farm including civil work tank construction Piping fabrication and installation

Pump skid installation

November 2011 – December 2011

4. Al-Borak Sun Chemical factory:

Project value: 1,500,000 SR

Position: Project Manager

Scope of work: To connect four numbers of steel tanks with carbon steel pips (2 diesel with 2 chemical and to install 2 agitators to mix diesel with chemical to be filled in 200 liters drums or trucks. Truck loading/unloading station

Installation of Shifting pumps.

Design of P&I diagram

MECHANICAL ENGINEER

Page 4

December 2011 – April 2012

5. Construction of reverse osmosis water plant

ALFATAH COMPANY FOR WATER AND POWER LTD. – Jubail industrial city Consultant: BYRNE LOOBY PARTNERS

Project value: 300,000,000 SR

Position: Construction Manager

Dismantle old plant

Geotechnical investigation

Civil work

12,000 cubic meters of reinforced concrete

Under ground water trench network

Under ground water pips different sizes 4 inch – 62 inch new plant facility installation with all piping work and machines

May 2012 – Jun 2012

6. Prince Mohammed Bin Abdulaziz International Airport Almadina Al Monawara Installation of water firefighting hydrant Project value: 1,750,000 SR

Position: Project Manager

Scope of work is including to install under/above ground carbon steel water firefighting system to protect four numbers of jet fuel tanks plus loading/unlading truck station. Maintaining pressure to 10 bars. Pipes size 6 inch for hydrant and 4 inch for fire monitors. all pipes are flange type installed inside underground tranche.

December 2012 – April 2013

7. MARS Saudi Arabia – King Abdullah Economic City Project value: 7,850,000 SR

Position: Project Manager

Scope of work include conche, mill and blower plate forms fabrication and installation 28 inches air duct installation with silencers and chimney All stainless steel pipe connections, welding work and support Equipment installation RJ filter, stainless steel silo, conche machine and mill machine positioning, screw conniver and metal detector installation.

Chocolate tank installation

Unloading all factory machines and installation

Aragon welding for all platforms

installation of two bolted firefighting steel water tanks. MECHANICAL ENGINEER

Page 5

May 2013 – December 2015

8. CLEANING, REPAIRING AND RECOATING OF FUEL OIL/ WATER STORAGE TANKS AT MAIN POWER PLANTS OF SEC-WESTERN SECTOR

Project total value: 67,000,000 SR

Position: Project Manager

Starting at shoiba power plant (S.P.P) diesel tank repair. Scope includes to transfer the oil from tank to tank, cleaning and inspection. sand pad and bottom plates replacement. tank shell plates and roof plates inspection and repairing. Blasting and painting, and fiber glass and gel coat coating. servicing and testing of all valves and floating suction.

April 2013 – JULY 2013

9. 41,000 CU.M HFO transfer between RPP1 and RPP2 distance of 800 meters Project value: 1,750,000 SR

Position: project Designer and Manager

The scope is to transfer 41,000 cu.m from tank to tank trough external line without using the existing piping network. Using four pneumatic pumps and manifold system and ceramic heaters, all the job was managed by me from idea, operation, supervision onsite until handover the tank to RPP representatives. I reduce the cost from 4,100,000 SR to 600,000 SR comparing to other contractors submitted price all documents are available for review.

i got a patent of an invention for this job as long as my company used this system more than 6 times in different places.

Jun 2013 – May 2014

10. MAINTENANCE OF HFO TANK NO. 5 IN SHOIBA POWER PLANT TANK CAPACITY 127,720 CU.M .

Project value: 3,800,000 SR

Position: Project Manager

Scope of work is to transfer the remaining oil from tank no. 5 to tank no.4 and disposal of all the sludge inside the tank quantity of 3050 Ton including chemical washing by using high pressure jet machine. hydro test for heating coil and repairing of leakage points. removing of existing fiber glass coat and to apply new fiber glass and gel coat as per SEC required system of minimum 1600 microns.

floating roof inspection

External and internal sandblasting and full painting system Replacement of existing foam seal

Firefighting system servicing and repairing work

Cathodic protection inspection

Handrail replacement including replacement of damaged fixed roof plates. MECHANICAL ENGINEER

Page 6

December 2014 – December 2015

11. Mars factory extension in CCO room and silo installation and 82 TON oven installation including stainless steel piping work and 65 TON steel structure including stainless steel sheeting and handrails and equipment installation. Project value: 12,560,000 SR

Position: Project Manager

scope of work includes to work in operational site with high safety and clean environment system includes welding of oven platform weight of 65 ton tube carbon steel up to 400 x 400 x 12 mm SHS tube.

installation of all the equipment and machines during platform installation, blasting and painting of all the steel structure. factory roof opening to install two part of oven each peace weight is 41 ton, including alignment and joining the two half by welding. testing and commissioning.

- Installation of galaxy wrapping line consist of one main built connected to three branches.

- Processing piping installation stainless steel 304 pipe 4”,3”,2.5” and 2”.

- Installation of two stainless steel silos each silo weight 17 Ton and height 28 meters.

- All machines installed without using and heavy lifting equipment. only rollers and chain blocks and hydraulic jacks to keep the factory environment clean.

- Dehumidifiers installation with all inlet and outlet piping

- Screw conveyers installation

- Rotary valves installation

- All MEP work for CCO ROOM (AHU units and duct up to 1.25 meters diameter circular type and rectangular type installation, chilled water system installation, cable trunking and cable ladder installation

- firefighting network for new platform

January 2015 – May 2016

12. 64,000 Ton untreated crude oil tank No. 7 maintenance at RPP 1 Project value: 9,800,000 SR

Position: Project Manager

Scope of work is to transfer the remaining oil and remove all the sludge inside the tank quantity of 2500 ton including washing by chemical by using high pressure jet machine. External and internal sandblasting and full painting system Replacement of aluminum floating roof with mechanical seal Firefighting system repairing work

Cathodic protection inspection and replacement

Handrail replacement including replacement of roof and bottom plates. MFL scanning on bottom and annular plates.( third party) MECHANICAL ENGINEER

Page 7

January 2016 – April 2016

13. Demi water Tank No. 3 Maintenance 2016

Project value: 1,233,000 SR

Position: Project Manager

Scope of work is to replace of bottom and annular plates. External and internal sandblasting and full painting system Cathodic protection inspection

Cathodic protection system replacement

Handrail replacement including painting

gel coat applying on bottom plates and 3 meters height on tank shell

March 2016 – August 2016

14. Tank No. 3 HFO Residual oil 64,000 Ton Capacity 2016 Project value: 1,925,000 SR

Position: Project Manager

Scope of work is to empty the tank and to transfer usable oil to tank No. 4 and sludge disposal and chemical wash Replace tank ladder, walkways and handrail with hot deep galvanized materials. External full painting system for damaged areas

Cathodic protection inspection

Cathodic protection system replacement

Tank internal inspection for floating roof, bottom and annular plates.

Jun 2016 – October 2016

15. Rabigh power plant loading/unloading jetty maintenance 2016 Project value: 2,384,000 SR

Position: Project Manager

- Scope of work : to replace all the structure below jetty because of the damaged condition for all walkways and gratings with hot deep galvanized materials.

- To replace all the edge curve stainless steel plates 316L

- Replacement of all jetty handrails

- Replacement of all firefighting system

- Replacement of all cable trays different sized with all supporting members

- Servicing of loading/unloading arms.

- Concrete work repair

- Repairing of damaged fuel piping

MECHANICAL ENGINEER

Page 8

Jun 2016 – October 2016

16- MATTEX FABRICS

Project value: 3,830,000 SR

Position: Project Manager

SCOPE:

- relocating of machines including inspection and quality control machine, debagging machines

- main panels disconnecting and termination.

- installation of roll up doors with dock levelers from Crawford.

- stainless steel process piping installation

- grass line installation including chilled water supply and return with insulation

- installation of compressed air piping network

- installation of two unit of 10,000 liters air receive tank

- firefighting network installation

- civil work for machines foundations

October 2016 – February 2017

17- distilled water tank –Shoiba power plant Saudi electricity company Project value:7,920,000 SR

Position: Project Manager

Scope of work:

apply full inspection for shell/bottom and fixed roof steel plates thickness pumping out remaining water

Cathodic protection inspection

to replace the cathodic protection system

to replace the sand bad under bottom plates

to replace of bottom and annular plates.

External and internal sandblasting and full painting system Handrail, walkways, steel grating replacement including painting

January 2017 – on going

18- Tank No. 1 treated crude oil tank PP 10 central region Riyadh –Al kharg road Saudi electricity company Project value:2,200,000 SR

Position: Project Manager

Scope of work:

- to transfer 4000 ton of crude oil from tank No.1 treated oil to tank No. 2 untreated oil tank distance of 200 meters

- to pump out 1900 ton of heavy sludge and disposal procedure using air operated pumps and trucks

- tank internal cleaning and washing

- floating roof drain inspection

- replacement of floating roof drain system

- blasting and painting of all damaged areas

- bottom plates and shell and floating roof inspection MECHANICAL ENGINEER

Page 9

Emergency work during above projects:

- Rabigh power plant jetty:

Fender repair 2012, 2014, 2015

- AlBakri main building construction: (Jeddah)

Steel structural work and civil work 2011

- Yanbu Bulk Plant – king Fahad industrial port

HFO tank bottom plats leakage 2012

Personal skills

• Ability to work under pressure.

• Ability to learn new tasks quickly.

• Ability to work individually & with team.

• Effective team member.

• Excellent communication skills.

• Self-motivated, dependable & goal oriented.

• Leadership skills.

• Good in handling problems.

• Enjoys challenges.

• Ability to handle more than one project in the same time as it shows on above projects duration

• Have a very good knowledge about projects pricing estimation and good relationship with companies and suppliers

Computer skills

• Windows and Internet

• Microsoft office (word - power point – excel- Microsoft project ) XP

• Auto-Cad

• Adobe Reader

Note: CD available up on request showing all above projects photos and job completion certificates. End of CV

Thank You for Your Time

Many Regards,

ABDULMONEIM AHMED SALEM

MECHANICAL ENGINEER

Page

10



Contact this candidate