SUMMARY:

Over thirty years’ experience in the power generation industry. Expertise includes start-up, operations and maintenance of combined cycle, gas and oil fired boilers, fluidized recirculation boilers, hydroelectric and solar- thermal power generation facilities with TES (Molten Salt Storage).

• Operations Manager

• Project Manager

• Commissioning Manager

• Comprehensive and thorough understanding of power plant processes

• O&M Instructor

EXPERIENCE

Commissioning Specialist: 7/5/2017 to 10/9/17

Contracted to Intecsa Industrial on an Integrated Solar Combined Cycle Power Plant (ISCCPP), on the Duba Green Power project in Duba, Saudi Arabia, as a Commissioning Specialist. The solar field consists of a CSP Thermal 40mw solar field with parabolic trough collectors. Initial assignment is Permit to Work & LOTO coordinator and as the project progresses, as the Control Room Lead. (90 day contract).

Senior Technical Adviser: 03/16 to 12/16

Contracted to ACWA Power/NOMAC, on a CSP Thermal Solar project NOOR 1 in Quarzazate, Morocco as a Senior Technical Advisor. The plant is a 160mw/hr CSP with a capacity of 3 hours of thermal energy storage (TES). The solar field consists of parabolic trough collectors. The project is located in the province of Quarzazate in Morocco, in the region of Souss-Massa-Draa, Morocco.

During transient operation, electricity can be produced from both sources at the same time, Solar Field and Thermal Storage Discharge.

During Thermal Storage discharge mode of operation, the HTF is heated up by the Molten Salts, which electricity is generated via the steam generated in the Steam Generation System and transferred to the steam turbine.

Implemented a “Plant Performance & Operations Improvement” action plan with positive results.

Operations Manager/Training Supervisor: 09/15 to 03/16

Contracted to ACWA Power/NOMAC, I am the acting Operations Manager on Bokpoort Solar project in Bokpoort, Northern Cape, South Africa. In addition I provide supervision for the development of a training program specific to a solar power plant with TES (Thermal Energy Storage) molten salt storage. I coordinate with the EPC contractor in the plant turnover to the client. Provide control room operator supervision as well.

Provide weekly reports to the NOMAC management team on the training program progress, plant operational status and various plant tests status.

Operations/Control Room Supervisor: 01/15 to 07/15

Contracted to Boyle Energy Service & Technology (BES&T), I provide commissioning advice to the EPC contractor (TERNA), plant operations and control room supervision. The plant consists of: Combined cycle with two GE 9FB Gas Turbines and one D11 Steam Turbine in a multi shaft arrangement, two NEM Heat Recovery Steam Generator equipped with an exhaust gas by-pass diverter damper for simple and combined cycle modes of operations a Steam Surface Condenser; a Mechanical Draft Cooling Tower and Water Treatment Plant; ABB DCS control system with a nominal 811 megawatt capacity.

In addition I provide weekly reports on the status of unit start-up activities to the startup manager and coverer the startup manager’s position in his absence.

Owners Representative: 10/2014 to 01/2015

Contracted to Green Power Solutions (GPS) of Georgia, LLC the project is developing a 25 megawatt (“MW ”) biomass-fired renewable energy power plant near Dublin, Georgia. The Project is located at a paper mill owned and operated by SP Fiber Technologies, LLC (“SPFT”). The Project will sell energy and capacity to Georgia Power Company (“Georgia Power”) and will sell steam to SPFT.

The Project will utilize an existing fluidized recirculation bed boiler and steam turbine that currently provide process steam and power to the Paper Mill, the project is installing updated emissions control equipment, modifying an existing fuel yard and substation, and performing major maintenance on the boiler and turbine.

My responsibilities include interfacing with the ESI (EPC Contractor) start-up team and the plant operators. Assist in developing operating procedures and set of plant logs to include power sales to Georgia Power.

Startup Manager 03/2013-12/2013

Genesis Solar Project, Blythe, CA- Working for UEI and contracted to FPL/NextEra.

Manage the startup the commissioning, and the turnover of the Solar Facility within its procedure, cost and scheduling. The project consists of two 125Mw each, CSP, parabolic trough type solar power plants located in Blythe, CA. The plants consist of a Rankine steam cycle BOP, an ACC, SENER Trough solar collectors, Siemens steam turbine generator set, and Siemens T300 DCS for controls./

Provide project management with weekly and monthly reports on the status of unit start-up activities. Ensure compliance to the start-up schedule and budget. Interface with client / operator and construction to ensure safe start-up and final turnover of plant.

Solar Field Construction Manager/Commissioning Manager 05/2010 to 3/2013

Abengoa Solar, Inc. Lakewood, CO.

Manage and supervise the engineering, the erection, the commissioning, the startup and the turnover of the

Solar Field within its procedure, cost and scheduling. Ensure the work is completed with due regard to the safety of personnel and company assets while meeting project key milestone dates. Ensure that all internal and

External interfaces are coordinated with various parties (Owner Client/EPC Contractor/Other Project Management).

Coordinate the Basic and Detailed engineering of the Solar Field. Establish a clear policy and general rules to apply to all disciplines related to the Solar Field, in order to have a coherent and homogeneous Construction Team. Provide Advice to the Project Manager. Manage the construction of the Heat Transfer System relative to the Solar Field. Ascertain that the Solar Field and HTF system specifications and performance are met. Coordinate with local authorities. Ensure proper Performance and Reliability tests are performed on the project. Ensure proper systems turnover of the Solar Field and Power Block equipment from construction to startup and from startup to the owner / client. Hold daily, weekly and monthly meeting with all parties to ensure project schedule is adhered to.

Assigned to the CSP, parabolic trough plants in Spain. Through operator training the duration of the plant startup was reduced by a substantial amount of time increasing the daily electrical production. Changed plant startup logic and reduced the plant parasitic load. Parasitic load reduction equaled to a million euro’s per plant, per year in savings. Provided operator training to the plant operations department resulting in production increase.

Director of Commissioning & Operations 06/08 to 02/2010

SkyFuel, Inc. Albuquerque, New Mexico

As the director of Commissioning & Operations in a new solar power plant developing company, I developed Solar Collector Assembly (SCA) and Solar Field commissioning procedures. Developed the following: Commissioning / Startup project plans including all documentation for turnover packages; solar field / SCA commissioning schedules including man hour estimates, Operator SCA and Solar field training program,

Solar Power Plant training program (solar field and balance of plant), SCA and Solar Field training manual, Lockout / Tag-out (LOTO) procedure, Initial commissioning budget estimates, Systems Turnover Packages pertaining to the solar field SCAs, SCA construction field installation check list, Startup Turnover & Release procedure and Solar Field Startup Manager Turnover manual.

Startup Coordinator 01/07-06/08

Lauren Engineering & Constructors, Abilene, TX.

I was assigned as a startup coordinator. Performed mechanical pre-commissioning of various systems as required by the specific project. I developed operating procedures for the project. As per contractual obligation I developed a training program for the client’s operators. Coordinated all system commissioning activates and provided hands on training on all plant systems to the plant operators.

Mechanical Commissioning Engineer 06/05-12/05

Blue Water Energy Solutions, Atlanta, Georgia.

Worked for Blue Water Energy Solutions as a commissioning engineer consultant. I was assigned various positions conforming to clients’ needs providing commissioning services. Performed mechanical pre- commissioning activities of various systems as required by specific project.

Co-gen Power Plant Superintendent 12/04-06/05 and 01/06-01/07

Los Alamos Nacional Laboratory- Las Alamos, NM;

Managed the Operations and Maintenance of a Cogeneration power plant at the Los Alamos National Laboratory. The plant provides electrical power and process steam to the lab. I was responsible for the plant operations, maintenance, maximum equipment availability, training, environmental compliance and plant reliability. Provided monthly reports on the plant status, plant efficiency, power generation and steam production to management. Coordinated schedule meetings and maintenance activities to ensure unit availability.

COMMISSIONING MANAGER START-UP SERVICES 01/99-11/04

SNC-Lavlain Thermal Power- Bothell, WA.

Managed and supervised the start-up of various power generating plants consisting of main combustion gas turbines, HRSG’s, boilers, steam turbines, and auxiliaries, feedwater and condensate systems, demineralizers, and sampling panels. DCS control room startup of units and control room operator training. Perform mechanical pre-commissioning of hydrogen gas cooling systems, testing, and troubleshooting. Provide SNC Lavalin management with weekly and monthly reports on the status of unit start-up activities. Ensure compliance to the start-up schedule and budget. Interface with client / operator and construction to ensure safe start-up and final turnover of plant.

OPERATIONS SUPERVISOR

KJC Operating Company - Boron, Ca. 06/93-1/99

Responsible for the safe, efficient operation and maintenance of a 40 MW solar electric generating facility. Prepare daily and monthly production reports, safety (lock out tag-out) clearances, and coordinate maintenance activities to insure maximum unit availability. Utilize spreadsheets to track heat rate of the unit. Appointed as DCS project manager for multi-plant control upgrade program.

• Coordinated multi-unit WDPF DCS upgrade projects.

• Developed equipment logic for DCS process controls.

• Succeeded in production increases through suggested system design changes.

• Implemented Computerized Maintenance Management Systems.

• Trained control room, power block & water treatment operators.

• Developed a training manual to assist operators in obtaining the Los Angles “Unlimited Stationary

Engineers” License. Achieved high success rate.

SENIOR CONTROL ROOM OPERATOR

Bonneville Pacific Services - North Las Vegas, NV 03/92-11/92

Commissioned, Operated and directed the operations of a 95 MW cogeneration combined cycle electric generating facility consisting of 3 LM2500 Aero –Derivative units on a 3 on 1 configuration including 3 HRSG’s, a GE steam turbine. All associated BOP equipment.

Westinghouse DCS for controls. 13.8 KV substation operation and all water treatment equipment.

• Initial startup of the unit including commercial operations.

• Trained control room operators.

OPERATIONS MANAGER & START UP ENGINEER-OPERATIONS: SEGS Solar Power Plants:

LUZ Engineering Corporation - Boron, CA 11/85-03/92

Responsible for a shift of 10 personnel, supervised the mechanical startup of units, managed the operations of 2 A.B.B.

80 MW steam reheat turbine-generators, 230 KV substation operations and all water treatment equipment. Controlled all daily activities of the Units.

• Supervised unit startups & plant commissioning of 6 units.

• Coordinated performance testing, acceptance and commercial operation.

• Trained control room operators

• Development of qualification guidelines, OJT manuals, and operating procedures

• Interfaced with construction to coordinate repairs and construction completion

LICENSES

City of Los Angles Stationary Steam Engineers License # 2794 Unlimited Horsepower w/Turbine Endorsement

State of New Mexico BO1 & BO2 Low Pressure & High Pressure Boiler Certificate # BO2-07787

PROFESSIONAL DEVELOPMENT

Advanced Power Plant Operations DEO Enterprises

24 hours

Management Skills for Supervisors Skill Path Seminars

16 hours

Management Work Shop LEC

40 hours

Managing Multiple Projects Skill Path Seminars

24 hours

Heat Rate Improvement DEO Enterprises

40 hours

LM 2500 Design, Operations & Main't Stewart & Stevenson

80 hours

Maintenance Planning & Control (CMS) Systems Works Inc.

40 hours

WDPF DCS Westinghouse

80 hours

Paradox 4.5 & Quattro Pro Horizons Computer learning

80 hours

Refrigeration A/C Theory Harbor Occupational Center

120 hours

Industrial Electrical Systems Harbor Occupational Center

120 hours

Boiler Feedwater Testing Treatment US Navy

40 hours

COSAL and Maintenance US Navy

40 hours

Boiler Technician “A” School US Navy

8 Weeks

COMPUTER SKILLS:

DOS; Windows; MS Excel / Word; WordPerfect; Microsoft Projects; Paradox.

Project Assignment Summary Details

Intecsa Industrial:

Project Start Date: July 5, 2017

Project End Date: Present

Position Held: Commissioning Specialist/Control Room Lead

Contracted to Intecsa Industrial as a commissioning specialist, currently assigned to as the permit to work and LOTO coordinator. Also assigned as the control room lead on an Integrated Solar Combined Cycle Power Plant (ISCCPP), project in Duba, Saudi Arabia. Duba Green Power.

ACWA Power/NOMAC:

Project Start Date: March 18, 2016

Project End Date: December 19, 2016

Position Held: Senior Technical Advisor

Contracted to ACWA Power/NOMAC, as a senior technical advisor on a 160mw/hr CSP project in Morocco with a 3 hour storage capacity of thermal energy storage (TES) system. The plant consists of the following: a 170mw/hrs capacity Siemens steam turbine; Siemens DCS control system, Parabolic Trough type solar collectors, 230kv switch yard, Heat Transfer Fluid system, water treatment facility, wet cooling tower, Solar Field Control system, etc.

Formulated a plant & operations improvement action plan. Plan was implemented with favorable results:

Daily startup of the plant was reduced by 30 to 45 minutes resulting higher electrical production;

Reduced the plant electrical parasitic load by a substantial amount; reduced the over-all water usage by a substantial amount;

Resulted in a tangible substantial plant performance improvement.

ACWA Power/NOMAC:

Project Start Date: September 5, 2015

Project End Date: March 16, 2016

Position Held: Operations Manager/Control Room Supervisor/Training Supervisor.

Contracted to ACWA Power/NOMAC, I was initially contracted to provide Control Room Operations supervisory and training the plant Control Room and Power Block Operators. Currently I am the acting Operations Manager on Bokpoort Solar project in Bokpoort, Northern Cape, South Africa. In addition I provide supervision for the development of a training program specific to a solar power plant with TES (Thermal Energy Storage) molten salt storage. I coordinate with the EPC contractor in the plant turnover to the client. Provide control room operator shift superior training as well.

Provide weekly reports to the NOMAC management team on the training program progress, plant operational status and various plant tests status. Providing DCS logic review for any issues and providing an alarm priority list.

Assisting the operations group in incident reporting, production reporting and root cause analysis reporting.

The Bokpoorst Solar Project consists of a 75mw/hr solar field, 55mw/hrs for electrical generation and 25mw/hrs for Thermal Storage.

I supervise the daily activities of 4 Expats advisors assisting me in the operations of the plant as well.

Boyle Energy Service & Technology (BES&T):

Project Start Date: January 5, 2015

Project End Date: July 15, 2015

Position Held: Startup Manager/Control Room Supervisor

Contracted to BES&T as a control room supervisor. The project was a combined cycle consisting of a two 9FB Gas Turbines and one D11 Steam Turbine in multi shaft arrangement, two Heat Recovery Steam Generators complete with a flue gas bypass systems, a Steam Surface Condenser, a Mechanical Draft Cooling Tower and a Water Treatment Plant with a nominal capacity of 811 MW at reference conditions. The plant provided power to the Greek grid.

Electrical systems included a 230Kv substation and a Foxboro DCS control system.

In addition to the supervisor role, I provided daily and a weekly summary reposts to the project management. Assumed the startup manager role during the startup manager’s rollout. Supervised the training of the TERNA control room and power block operators. Coordinated the systems walk downs and ensured all pertinent systems turnover documentation were in order.

Green Power Solutions (GPS)

Project Start Date: October 13, 2014

Project End Date: July 01, 2015

Position Held: Startup Manager

Contracted to Green Power Solutions (GPS) of Georgia, LLC the project is developing a 25 megawatt (“MW ”) biomass- fired renewable energy power plant near Dublin, Georgia. The CFB boiler was converted from coal fuel to biomass and used up the remaining coal reserves. At times burning both fuel sources at once. The Project is located at a paper mill owned and operated by SP Fiber Technologies, LLC (“SPFT”). The Project will sell energy and capacity to Georgia Power Company (“Georgia Power”) and will sell steam to SPFT.

The Project will utilize an existing fluidized recirculation bed boiler and steam turbine that currently provide process steam and power to the Paper Mill, the project is installing updated emissions control equipment, modifying an existing fuel yard and substation, and performing major maintenance on the boiler and turbine. The plant modifications include a new generator exciter control system, switch yard provisions to allow power sales to the grid, new modern steam turbine control system. Development of DCS logic for a new boiler master control scheme to include steam supply to the paper mill and electrical production.

My responsibilities include interfacing with the ESI (EPC Contractor) start-up team and the plant operators. Ensure owner is receiving properly commissioned systems with all pertinent systems turnover documentation completed as per EPC contract. Ensure the operators and maintenance receive proper training according to EPC contract. Review and participate in the punch list process. Attend construction and startup meetings. Advise client relative to the construction and startup schedules.

Assist in developing operating procedures and set of plant logs to include power sales to Georgia Power. Change

Operator’s operating practices to ensure power production as a priority to achieve maximum revenue sale of power.

Genesis Solar Power Plant.

Project Start Date: March 20, 2013

Project End Date: December 19, 2013

Position Held: Startup Manager

Genesis Solar Project, Blythe, CA- Working for UEI and contracted to FPL/NextEra.

Manage the startup the commissioning, and the turnover of the Solar Facility within its procedure, cost and scheduling. The project consists of two 125Mw each, CSP, parabolic trough type solar power plants located in Blythe, CA. The plants consist of a Rankine steam cycle BOP, an ACC, Sener Trough solar collectors, Siemens steam turbine generator set, and Siemens T300 DCS for controls.

Provide project management with weekly and monthly reports on the status of unit start-up activities. Ensure compliance to the start-up schedule and budget. Interface with client / operator and construction to ensure safe start-up and final turnover of plant.

The project was a unique challenge due to the normal power feed to the plant, a 230kv system was not available during the initial commissioning of unit 2 (1st plant scheduled for COD). Developed a plan to commission major systems using temporary diesel generators until a temporary 115kv systems was installed. Steam blows were accomplished using the

115kv system. The 230kv system was available before COD of unit 2 and initial commissioning of unit 1.

The project was behind schedule by a couple of months. I was instructed by senior management to achieve the project original COD date. We as a startup team and construction cooperation achieved original COD date on both units 1 & 2.

Solana Solar Power Plant: Gila Bend, AZ

Project Start Date: January 5, 2013

Project End Date: March11, 2013

Position Held: Startup Manager (Owners side)

Assigned to the CSP, parabolic trough plant Solana in Gila Bend, AZ. Coordinate the Basic and Detailed commissioning of the project as an owner’s Rep. Left the project after two months due to safety concerns. Returned to work for Abengoa after the Genesis project as a contractor and left upon completion of contract obligation.

Solnova’s 1, 3, & 4. Sevilla, Spain

Project Start Date: September 17, 2010

Project End Date: March 11, 2013

Position Held: Solar Power Plant Process Specialist:

Assigned to the CSP, parabolic trough plants in Spain. Provided operator training to the plant operations department resulting in production increase. Assisted in developing an operator training program. Assisted in developing a LOTO program.

Changed plant startup logic and reduced the plant parasitic load. Parasitic load reduction equaled to a million euro’s per plant, per year in savings.

• Reduced plant startup duration resulting in electrical power production increase.

• Reduced plant parasitic load that equaled a million euro’s savings per plant per year.

• Provided control room operator training resulting in reduced plant trips and plant efficiency.

• Advised engineering in future plant designs to improve plant performance and ease of operations.

• Provided DCS graphics and reduced the amount of pages required on monitors during plant startup.

• Provided trouble shooting advice and operator training to plants in Chile, UAE and Algeria.

Shams-1 Power Company

Abu Dhabi, United Arab Emirates

Project Start Date: June 20, 2010

Project End Date: September 15, 2010

Position Held: Solar Field Construction Manager / Commissioning Manager

Manage and supervise the engineering, the erection, the commissioning, the startup and the turnover of the Solar Field within its procedure, cost and scheduling. Ensure the work is completed with due regard to the safety of personnel and company assets while meeting project key milestone dates. Ensure that all internal and external interfaces are coordinated with various parties (Owner Client / EPC Contractor / Other Project Management. Coordinate the Basic and Detailed engineering of the Solar Field. Establish a clear policy and general rules to apply to all disciplines related to the Solar Field, in order to have a coherent and homogeneous Construction Team. Provide Advice to the Project Manager. Manage the construction of the Heat Transfer System relative to the Solar Field. Ascertain that the Solar Field and HTF system specifications and performance are met. Coordinate with local authorities. Ensure proper Performance and Reliability tests are performed on the project. Ensure proper systems turnover of the Solar Field and Power Block equipment from construction to startup and from startup to the owner / client. Hold daily, weekly and monthly meeting with all parties to ensure project schedule is adhered to.

Boulder City, Nevada

Project Start Date: January 8, 2007

Project End Date: June 27, 2007

Position Held: Startup Manager

Assigned as the startup manager at the Nevada Solar One project, I provided Standard Operating Procedures for the client. Developed a training program for the plant operators including plant chemistry/chemical injection, and balance of plant. Trained the operators in the control room operations on a 65 Mw solar thermo power plant consisting of the following equipment: 65 Mw Siemens STG; RO and EDI demin systems, Emerson DCS control system, boiler feedwater, condensate, closed cooling water system, circulating water, sample panel, heat transfer system, chemical injection system, etc.

Developed a commissioning schedule and commissioning procedures for the project. Managed all start up activities

for the project for pre-commissioning, startup, performance testing and into commercial operations.

Askeaton, Ireland:

Project Start Date:

June 6, 2005

Project End Date:

December 18, 2005

Position Held:

Mechanical Commissioning Engineer

Mechanical Startup Engineer for a combined cycle 150 Mw power plant consisting of 2 GE 6FA combustion gas turbines,

2 NE Nooter/Eriksen HRSG’s and auxiliaries, feedwater, main export steam, with Honeywell DCS for controls. Assigned as the commissioning engineer for unit 2 combustion gas turbine. Performed mechanical testing and troubleshooting of CTG systems. Conducted lube oil flush to meet GE specs. Cleaned the following system piping: fuel gas, water injection, fuel oil, C02 fire protection, purge air, and bleed air systems. Ensure unit was ready for scheduled first fire.

Trained outside operators on operations of the GE combustion gas turbines including pre-operational systems checks and normal operations.

Operated the control room during steam blows and all testing. Trained the owner / operators personnel in the control room. Submitted changes to the DCS logic to improve plant operations.

Long Beach, California

Project Start Date: June 23, 2004

Project End Date: October 22, 2004

Position Held: Lead Mechanical

Supervised the commissioning and startup activities of a 550 Mw combined cycle power plant project at the Haynes Generation Station in Long Beach, Ca. (Second project for Kiewit) The plant consisted of two 7-FA GE combustion turbines, two Alstom HRGS’s and a GE D11 Condensing Steam Turbine Generator. The plant controls consisted

of a Westinghouse Ovation DCS for the BOP and a Mark VI for the CTG controls.

Provided commissioning schedules and commissioning procedures to the client in order to track startup activities. Coordinated all vendors scheduling to meet startup schedule requirements. Coordinated with operations, dispatch and engineering during performance testing. Provided weekly summary reports to management.

Sun Valley, California

Project Start Date: June 22, 2003

Project End Date: January 30, 2004

Position Held: Lead Mechanical

Supervised the commissioning and startup activities of a 550 Mw combined cycle power plant project at the LA Power Joint Venture in Sun Valley, Ca. The plant consisted of two 7-FA GE combustion turbines, two Alstom HRGS’s and a GE D11 Condensing Steam Turbine Generator. The plant controls consisted of a Westinghouse Ovation DCS for the BOP and a Mark VI for the CTGs.

Provided commissioning schedules and commissioning procedures to the client to track startup activities. Coordinated all vendors scheduling to meet startup schedule requirements. Coordinated with operations, dispatch and engineering during performance testing. Provided weekly summary reports to management.

El Dorado, Arkansas

Project Start Date: July 29, 2002

Project End Date: April 10, 2003

Position Held: Commissioning Supervisor

Supervised the commissioning and startup activities of a 2,200 Mw combined cycle merchant power plant. Assigned as the Control Room Supervisor. The plant consisted of 4 blocks. Each block contained two 7FA GE combustion turbines, two Alstom HRGS and one D11 GE steam turbine. Plant control system consisted of a Westinghouse Ovation DCS and Mark VI system.

Minooka, Illinois

Project Start Date: January 23, 2002

Project End Date: March 17, 2002

Position Held: Commissioning Supervisor: Supervised the control room operations of a 1200 Mw combined cycle power plant during startup, steam blows, performance testing and commercial operations. Coordinated shut down of all equipment requiring repairs or modifications by construction. Trained the plant control room operators on the Foxboro control system. Project included 4

GE 7FA combustion gas turbines, 4 Foster Wheeler HRSGs and 4 A-10 GE condensing steam turbines. The BOP

included condensate systems, circulating cooling water systems, closed cycle cooling systems, cooling towers, river make up system, clarifier, reverse osmosis system, multimedia filter, demineralizers, and a 345 Kv switchyard.

• Identified logic problems and provided solutions on the plant control systems.

• Submitted DCS logic changes to enhance plant design in maintaining plant stability during STG full load rejection.

• Coordinated all plant performance test activities to ensure plant conditions met design specifications.

Seropedica, Brazil

Project Start Date: August 16, 2001

Project End Date: December 15, 2001

Position Held: Commissioning Supervisor

Supervised the commissioning of eight GE LM6000 combustion gas turbines, fuel gas system, chillers and balance of plant in a 380 Mw simple cycle merchant power plant. Equipment included a Foxboro DCS control system, fuel gas compressors; and wastewater treatment equipment. Balance of Plant included a river intake system, clarifier, multimedia filters & demineralizer system.

• Achieved record time commissioning and startup of the project including commercial operations.

• Supervised and trained the control room and outside operators.

• Identified design deficiencies and submitted a DDR (Design Deficiencies Reports) with suggested solutions.

• Identified and submitted DCS logic changes to prevent entire plant trip