Post Job Free
Sign in

Engineer Drilling

Location:
Muscat, Oman
Posted:
January 13, 2018

Contact this candidate

Resume:

Curriculum vitae status

Personal Details

Full Name

Mohamed TAKILT

Home Address

AIT AMAR, AIT BOUADOU 15025, TIZI OUZOU, ALGERIA

E-MAIL

*********@*****.*** or *********@*****.**

Telephone Number Mobile

ALG: 002**-***-***-*** OMAN: 009**-**-**-**-**

Date of Birth

May, 04th 1979

Nationality

Algerian

Country of Residence

Algeria

Home Airport

200Km

Job Role Desired

Drilling fluids engineer

Statement:

I’m a state engineergeophysicist, i have been involved in all aspects of drilling fluids, as a drilling fluids engineer, i worked with the main oil and gas exploration and development companies in Algeria since july 2007 to March 2013.

From April 2013 till December 2014, I was a drilling fluids engineer in sultanate of Oman with ABRAJ energy Services company, Oman oil exploration and production project in Block 60 ABUBUTABULHPHT Gas field.

From January 2015 till now, i’m drilling fluids engineer with Abraj energy services affected to PDO HPHT Gas field in Burhan, Saihrawl and saihnihyda.

Experienced in: Exploration and development fields, shallow and deep gas wells.

I have an excellent command of Oil based mud: low & high mud weights, various OWR (70/30 to 90/10), Diesel invert emulsion & low toxicity invert emulsion, Kcl polymers mud, gel polymers mud,polyoilglycol mud,non damagingkcl polymers mud, HPHT Kcl/polymers glycol mud, Nacl/kcl polyamine PHPA mud, silicate mud, MI OBM and completion brine, .

I have Good communication, reporting and management skills and Familiar with Technologies: Dims,Openwell,Mudpit, Mudware, Microsoft Office, Excel, Word, Outlook and MI one trax software.

Good experience in waste management supervising (skimmer, Vortex dryer and centrifuges).

Job History(Most recent first)

From

To

Company

Job Title

April 2013

Now

ABRAJ ENERGY SERVICES LLC

Drilling Fluids department

Sultanate of Oman

Lead drilling fluids engineer.

Since April 2013, i joined ABRAJ LLC in Sultanate of Oman, affected to Block 60 in ABUBUTABUL, OMAN OIL development field where i work as a drilling fluids engineer until December 2014, my responsiblywas: Participate on rig acceptance, make a request for chemicals needed on site, prepare the mud, check the efficiency of solid control equipment, monitor the volumes and follow the drilling procedures on gas wells, follow the drilling operations and maintain the mud parameters in a good rang according to the program, follow the geology and hole conditions, coordinate with the base and prepare all the reports: daily report, stock, end of the well report and tickets.

Assist the mud tester night and day to ensure a good running of drilling fluid, participate on the HSE program of the company, and focus on the behaviour of the company.

During this period i worked on this following wells:

ABB#29, ABB#32, ABB#34, ABB ABB#41, ABB#44, : total depth 4550m-5113m, drilling fluids used : PHB spud mud – Nacl/Kcl polymers mud – Kcl/ HT polymers/Glycol mud, completion brine.

Rigs worked on: ABRAJ rig#210 and ABRAJ rig#301.

From December 2014 till now, i’m affected to PDO HPHT gaz wells developmentin Burhan, Saihrawl and saihnihayda field rig#63, mud used: Nacl/kcl/polymers/PHPA mud, silicate mud, kcl polymers polyamine mud and MI OBM VERSCLEAN .

During this period i worked on this following wells:

Burhan#27, 5121m depth 5121m

Saih nihyda-MG#1 depth 2370m

Saih nihyda-MG#2 depth 2652m

Saih nihyda-North#3 depth 5164m

Saih nihyda#36R depth 4946m

Saih nihyda#52R depth 4900m

SN-36 R depth 4812m

SN-Deep1 depth 5120m

BRNW-36 depth 5087m

BRNW-37 depth 5080m

From

To

Company

Job Title

July20th, 2012

March 2013

AVA-NEW PARK COMPANY with

REPSOL Exploration Algeria

ILLIZI-Algeria project

Senior drilling fluids engineer.

Since July 20th, 2012, i was affected to REPSOL exploration in Illizi- Algeria where i workas a senior drilling fluids engineeruntil March 2013, my responsibilities were: Participate on rig acceptance, make a request for chemicals needed on site,

prepare the mud, check the efficiency of solid control equipments, monitor the volumes and follow thedrilling proceduresthrough shallow gas formations, follow the drilling operations and maintain the mud parameters in a good rang according to the program, geology and well conditions, coordinate with the base and prepare all the reports: daily report, stock, end of the well report and tickets.

Assist the night drilling fluids engineer and trainee mud engineers sent on location.

During this period i worked on this following wells:

TDE#1 (Tin Essameid Est-1) : total depth 1512m, drilling fluids : spud mud - gel polymers mud - Kcl polymers mud, non damagingKclplymers mud (well operations in progress), Rig : Saipem#5859.

TENE#1 (Tan Emellel Nord Est#1) : total depth 1516m, drilling fluids : spud mud - gel polymers mud - Kcl polymers mud, non damagingKcl polymers mud, Rig : Saipem#5859.

TESO#1(Tan EmellelSud ouest#1): total depth 1674m, drilling fluids : spud mud - gel polymers mud - Kcl polymers mud, non damagingKclplymers mud and Nacl brine with potassium iodide Tracer, Rig : Saipem#5859

TIHS#1(Tihalatine sud#1): total depth 1192m, drilling fluids : spud mud - gel polymers mud - Kcl polymers mud, non damagingKclplymers mud and Nacl brine with potassium iodide Tracer, Rig : Saipem#5859

From

To

Company

Job Title

September 02nd, 2009

July 19th, 2012

AVA-NEW PARK COMPANY with

Sonatrach-AGIP groupe (GSA)

Senior drilling fluids engineer.

As a senior drilling fluids engineer, i was affected to GSA development project in RHOURD MESSAOUD, ZEMLET ADREG and BIR REBAA, SIF FATIMA Algeria oil fields to work with Saipem contractor rigs(Saipem#5832-Saipem#5894), my duties was:mixing all kind of drilling fluids needed on site, managed chemical store and stock, requested for chemicals needed, Run and maintained the drilling fluids in correct parameters rang, made mud sample analyses and data interpretation, mud volume management, mechanical treatment of the mud, storage and transfer of the mud at the end of the well to a new location, waste management supervisor on site (personnel, dryer(VORTEX), centrifuges and oil-water separator(SKIMMER) ).

Assisted the night drilling fluids engineer and trainee mud engineers sent on location.

Ensured coordination and communication with all services companies, contractors, client and the base

Ensured whole kind of reporting.

During this period of time, i worked on different wells with Saipem#5832 and Saipem#5859 rigs, where encountered practically the same problems: partial to total loss at plus minus 300m depth witch always controlled by pumping loss circulation materials or cement plugs, also problem of salt formation stuck (Cenomanian lithology) at plus minus900m witch controlled by pumping pills of fresh water through the salt formation and dissolve salt and unstuck

ZEA#10: ZEMLET ADREG block 403a, total depth: 3685m, drilling fluids: spud mud, oil based mud (1,20sg-1,35sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,45sg), Nacl-cacl2 completion brine1,40sg.

ZEA#11: ZEMLET ADREG block 403, total depth: 3680m, drilling fluids: spud mud, oil based mud (1,20sg-1,30sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,40sg), Nacl-cacl2 completion brine(1,25sg-1,40sg).

ZEA#12: ZEMLET ADREG block 403, total depth: 3705m, drilling fluids: spud mud, oil based mud (1,25sg-1,35sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,30sg-1,45sg), Nacl-cacl2 completion brine1,40sg.

ZEA#13: ZEMLET ADREGblock 402a, total depth: 3690m, drilling fluids: spud mud, oil based mud (1,25sg-1,35sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,35sg), Nacl-cacl2 completion brine1,35sg.

ZEA#16: ZEMLET ADREGblock 403a, total depth: 3660m, drilling fluids: spud mud, oil based mud (1,20sg-1,35sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,45sg), Nacl-cacl2 completion brine1,35sg.

BRN#23: BIR REBAA NORTHblock 403, total depth: 3623m, drilling fluids: spud mud, oil based mud

(1, 25sg-1,35sg), heavy oil based mud (2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,30sg), Nacl-cacl2

completion brine1,25sg.

BRN#24: BIR REBAA NORTHblock 403, total depth: 3680m, drilling fluids: spud mud, oil based mud (1,20sg-1,35sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,35sg), Nacl-cacl2 completion brine1,25sg.

BRSW#17: BIR REBAA SUD WEST block 402a, total depth: 3935m, drilling fluids: spud mud, oil based mud (1,20sg-1,35sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,45sg), Nacl-cacl2 completion brine(1,25sg-1,40sg).

ROM#24: RHOURD MESSAOUD block 403a, total depth: 3550m, drilling fluids: spud mud, oil based mud (1,20sg-1,35sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,35sg), Nacl-cacl2 completion brine1,25sg.

ROM#27: RHOURD MESSAOUD block 403a, total depth: 3530m, drilling fluids: spud mud, oil based mud (1,20sg-1,30sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,35sg), Nacl-cacl2 completion brine1,25sg.

SFNE#14:SIF FATIMA NOURTH EST block 402a, total depth: 3050m, drilling fluids: spud mud, oil based mud (1,20sg-1,30sg), heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg1,35sg), Nacl-cacl2 completion brine 1,22sg.

From

To

Company

Job Title

April 06th, 2009

September 01st, 2009

AVA-NEW PARK COMPANY with

Sonatrach Development Project in RHOURD NOUS.

Senior drilling fluids engineer.

As a senior mud engineer during this period, i worked on RHOURD NOUS oil field block of Sonatrch with ENTP contractor, rig TP#198.

well: RNZ#114, total depth:4137m,drilling fluids: spud mud, oil based mud 1,20sg, heavy oil based mud(2,00sg-2,05sg), non damaging oil based mud(1,25sg-1,30sg), Nacl completion brine 1,18sg.

Wherei ensured the mixing, treatment, running, parameters maintain and management of the drilling fluids used with good respect of safety policy.

Supervised whole waste management operations and managed personnel and equipments on site (centrifuges and dryer(VORTEX) ).

Ensured all reporting and coordination between rig and customer, services companies and our base.

From

To

Company

Job Title

January 1st, 2009

April 5th, 2009

AVA-NEW PARK COMPANY with

Repsol YPF Exploration client.

Senior drilling fluids engineer

I worked for the first time as senior drilling fluids engineer in the same location,Repsol YPF Exploration Algeria with Saipem contractor, rig Saipem#5892, where i ensured the mixing, running and the maintaining of the drilling fluids on site until the end of the operations on the well, i ensured the coordination and the reporting to the base and on site between companies.

I requested chemicals and equipments needed for services on site.I suggested solutions for problems encountered like: mud contamination due to gypsum, contamination due to Co2 gas, polymers degradation due to temperature, the use of tracer for best fluid management while drilling, caving problem.

Well: AZSE#3AZRAFIL SUD EST Reggane block, total depth:3963m.

Drilling fluids: spud mud, gel polymers mud, Kcl polymers mud with tracer, Avapolyoil mud with tracer, non damaging Polymers mud with tracer.

-Software used: DIMS Repsol YPF data base software.

From

To

Company

Job Title

September 04th, 2008

December 31th, 2008

AVA-NEW PARK COMPANY with

Repsol YPF Exploration client.

Junior drilling fluids engineer

During this time, i worked as a junior drilling fluids engineer with Repsol YPF Exploration, block ofReggane AZRAFIL SUD EST, contractor: Saipem, Rig: Saipem#585.

Ensured the running, mixing, mud samples analyses and treatment of the mudduring the night shift.

Followed the instructions of the senior drilling fluids engineer, company man and base coordinator.

I Prepared the daily mud reports and communicated with to the base to report the situation at the end of my shift.

well: AZSE#3 total depth:3963m

Drilling fluids used: spud mud, gel polymers mud, Kcl polymers mud, Avapolyoil mud, non damaging Polymers mud.

-Software used: DIMS Repsol YPF Data base software.

-Problems encountered: Total loss, stuck and venue in same time, the well control was very hard and needed much time and equipments to be controlled.

From

To

Company

Job Title

September 23rd, 2007

September 03rd, 2008

AVA-NEW PARK COMPANY with

Repsol YPF Exploration client

Junior drilling fluids engineer

During this period, i was affected to the rig to work as a junior drilling fluids engineer for the first time, the client was Repsol YPF Exploration in Reggane TIWLILINE OUEST, block 351C-352C, the contractor was DMM, rig: DMM#2.

I ensured the running, mixing, mud samples analyses and treatment of the mud during the night shift.

Followed the instructions of the senior drilling fluids engineer, company man and base coordinator.

I Prepared the daily mud reports and communicated with to the base to report the situation at the end of my shift

I always made a pilote test before mixing a new mud to have an idea before mixing on tanks.

Always interact with other companies’ crew to learn about drilling equipments, procedures and everything about drilling.

The well was TIO#3 with total depth: 3900m.

Drilling fluids used: spud mud, gel polymers mud, Kcl polymers mud, Avapolyoil mud, non damaging Polymers mud.

-Software used: DIMS Repsol YPF Data base software.

Problems encountered: mud contamination with solids and gas kick.

From

To

Company

Job Title

August 21st, 2007

September 22th, 2007

AVA-NEW PARK COMPANY with

Sonatrach client

Trainee drilling fluids engineer

For the first time after mud school, i was sent as a trainee drilling fluids engineer to Hassi-messaoud block, Sonatrach oil fieldwith Nabors contractor, Rig:F#22 where i was assisted by the senior drilling fluids engineer on site and helped me to combine between my theoretical knowledge and the practice and to develop my knowledge in drilling fluids and oil field.

From

To

Company

Job Title

July 22nd, 2007

August 20th, 2007

AVA-NEW PARK mud school

HASSI-messaoud Algeria

Trainee drilling fluids engineer

AVA Mud school studies in HASSI MESSAOUD Algeria.

From

To

Company

Job Title

Professional Training

HSE orientation, H2S and SO2 escape certificate, expire on may 2019. (3D PDO training center).

Entry into all H2S designated areas Permit, Exp: 29-04-2016 (PDO training center)

Three drillers IWCF Certificates, the last one expire on 06th November 2014

Shallow gas drilling procedures training, done by COOTS & BOOTS company ‘supervisoron REPSOL Explorationrig in ILLIZI (rig: saipem#5859)

Safly driving certifivate (Naftogaz –HMD Algeria)

Rig training on DIMS, REPSOL Exploration software in reggane, Adrar Algeria.

Mud pit training in AVA-NEWPARK Hassimessaoud (ava software)

mu school training at AVA-NEW PARK Hassi-messaoud Algeria

End of studies training work: Trainee geophysicist engineer at ENAGEO Company (National geophysical company) in Hassi-Messaoud Algeria.

HSE trainingcertificate (Back Safety, Hand Safety, Fire Fighting, chemical handling safety, H2SaliveSafety, confine space safety) at AVA –New park company inHassimessaoud Algeria.

Safely driving certificate: NAFTOGAS school at Hassimessaoud Algeria.

Education

September 2003:Geophysical state engineer diploma.

Final thesis: The characterization of the lithology by well seismic, seismic attributes and logs.

March 2003-may 2003: went on a training work: ENAGEO Company, Hassi-Messaoud

Worked on my end studies project and got some knowledge on data seismic

Processing and seismic maps interpretation.

2000-2003: geophysical studies, major seismic, hydrocarbon and chemistry institute,

Geophysical department, Boumerdés University, Algeria

1998-2000 :Technologie core syllabus, Tizi ouzouuniversity.

June1998: baccalaureate mathematics diploma.

Languages (State Native, Fluent, Working or Basic)

Arabic: fluent.

French: fluent.

English: fluent



Contact this candidate