JUAN V. CURBELO, PMP, PMI-SP

United States Phone: 787-***-**** E-mail: ********@****.***

Project Controls/Planning & Scheduling/Construction Manager CORE COMPETENCIES

Scheduling / Primavera P6 / Project Management / Earned Value / Estimates / Specifications / Cost Control / Safety / Regulatory / Risk Management / Quality Control / Procurement / Change Control / Budgets / C&Q / CAD & Drafting / Contracts / Reporting / Construction / Process & Instrumentation Diagrams / SUMMARY

Over twenty years of experience working on industrial projects. Proficient in facilitating team integration between construction, automation, C&Q and operations. Exposed to Capital & Infrastructure projects with budgets in a range from 3M to 850M. All-rounded performer with expertise in scheduling with Primavera P6, Process & Instrument Diagrams (P&ID), Construction Management and C&Q. Certified Project Manager Professional (PMP) and Scheduling Professional (PMI-SP).

RELEVANT EXPERIENCE

Senior Project Scheduler: (Consultant) March 2016 – Present Eli Lilly, Lilly del Caribe Inc., Carolina, PR

• Work closely with program managers to develop and maintain detailed resource loaded and activities schedules of projects using Primavera P6.

• Integrate multiple schedules into a master project schedule, base lining, status updates, and performance measurement, baseline Budget at Completion (BAC), Cost Performance Index (CPI), Schedule Performance Index (SPI), Estimate at Completion (EAC), and Estimate to Complete (ETC).

• Develop and maintain summary level schedule reports, Gantt charts, milestone charts, and other program management tools used to support critical path analysis, near-term tasks work authorizations, priority based resource allocations, performance variances, and to support cost/schedule integration.

• Supports the project team in the planning, tracking, analysis, and reporting of projects/programs, including dashboard maintenance.

• Develop schedule version control processes, policies, and procedures and ensures that they are followed on product development schedules.

• Work in collaboration with Project Management team to drive consistency of the project scheduling approach to facilitate accuracy in project execution and reporting.

• Schedule update through field progress validation, stakeholder’s meetings, contractor estimations, updated actuals and remaining work.

JUAN V. CURBELO, PMP, PMI-SP

United States Phone: 787-***-**** E-mail: ********@****.*** RELEVANT EXPERIENCE (cont.)

Project Controls Consultant: February 2013 – March 2016 Abbott Healthcare Ltd., Barceloneta, PR

• Responsible for the management of the controlled drawings program across the plant.

• Developed, monitor and update integrated project plans and schedules for construction and validation.

• Designed an application capable to create loop diagrams for the RS3 Migration to Delta V project.

• Assisted in the execution of Decommissioning Protocols. Abbvie Ltd., Barceloneta, PR

• Prepared process & instrumentation diagrams applying ISA standards.

• Responsible for the management of the controlled drawings program across the plant.

• Assisted in several facilities projects including HVAC, clean rooms and process controls.

• Employed knowledge of relational database concepts in the execution of pharmaceutical projects.

• Provided project management and control services for construction projects. Johnson and Johnson, Lifescan, Aguadilla, PR

• Site Construction Manager for the implementation of a new clean room facility.

• Developed scope, schedule, WBS, estimates, managed cost and analyzed risk, ensuring project success.

• Responsible for creating and maintaining project documentation.

• Responsible for the entire project procurement and sub-contract management. Johnson and Johnson, Mentor, Leiden, Netherlands

• Overall plant facilities and utilities drawings as-built. Edwards Lifesciences, Añasco, PR

• Utilities drawings as-build’s, (compressed air, electrical one line and purified water. Master Scheduler: Puerto Rico Infrastructure Financing Authority - August 2011 – February 2013

• Contributed in the control of schedules in a program with more than 100 projects and 850M dollars.

• Create and revise cost loaded schedules, audit other schedulers work and produce evaluation documents.

• Evaluated construction progress and provided regular schedule updates using Primavera P6.

• Interfaced with contractors to discuss time impacts and negotiated the proper resolutions.

• Served as technical advisor for the solution of difficult production problems.

• Assisted in the creation of short-term schedules and monitored them to determine impacts

• Provided information as needed on the content, modification, or presentation of project schedules. Construction Project Manager II: Mar-Land Industrial Contractors, Inc. - October 2010 – August 2011

• Responsible for the planning and overseeing of pharmaceuticals and industrial projects.

• Managed the construction budget to ensure that cost-effective strategies were implemented and executed.

• Conducted the hiring and termination process, the required safety training and performed the payroll.

• Prepared the required project documents such as; certifications, estimates, change orders, RFI's and submittals.

• Developed and maintained a resource and cost loaded P6 schedule for each project.

• Supervised crew of up to 40 resources including subcontractors on multiple concurrent projects.

• Negotiated the procurement with suppliers and sub-contractors maximizing the authorized budget. JUAN V. CURBELO, PMP, PMI-SP

United States Phone: 787-***-**** E-mail: ********@****.*** RELEVANT EXPERIENCE (cont.)

Project Superintendent: Caribbean Project Management, San Juan, PR - November 2007 – October 2010

• Key team member in the demolition and eventual construction of a new large sport complex.

• Responsible for overseeing and inspecting construction quality compliance in the overall project.

• Performed P6 schedule review, identified project schedule trends and lead weekly progress meetings.

• Participated in value engineering efforts, made estimates and negotiated changes with the contractors.

• Assisted in the commissioning and documentation of all mechanical and electrical systems for new facilities.

• Conducted daily inspections, gathered field data and reported using Primavera Contract Manager.

• Reviewed procurement and supplier submittal documents for acceptability and conformance. Planner/Scheduler : Bristol-Myers Squibb, Mayagüez, PR - March 2007 – October 2007

• Assisted in the implementation of cost control procedures and the coordination of construction activities.

• Managed project meetings to evaluate stakeholder’s needs and recommend implementation strategies.

• Developed project schedules, performed schedule reviews, conducted progress meetings and reporting.

• Planned and performed factory acceptance test for some major equipments for the facility.

• Prepared and executed commissioning protocols for assigned project in regulated areas.

• Implemented commissioning activities such PM’s, calibrations, spare parts, cleanings and testing's.

• Generated and updated process and instrument diagrams for new equipment installed. Engineering Technician II: Abbott Pharmaceuticals Ltd., Barceloneta, PR - March 1998 – January 2007

• Duties included producing construction drawings and maintain regulatory diagrams for our facility.

• Facilitated training in the applicable drafting standards and drawing control procedures.

• Prepared pre-construction documents, estimates, preliminary schedules, RFP's, bids and contracts.

• Responsible for planning, scheduling, and coordinating of pharmaceutical construction projects.

• Controlled construction cost/budget expenditures and document control for assigned projects

• Evaluated and inspected safety and enforced the proper usage of protection equipment.

• Coordinated work permits, hot work, disassemblies, Log/Tag Out, confined space with manufacturing.

• Performed equipment, facilities and utilities qualifications and commissioning for designated projects.

• Documented as-built drawings on the CAD System in all disciplines and updated the hard copy records.

• Validated that the proper welding methods, piping tests and documentation were provided. Engineering Technician I: Abbott Fermentation Products Inc., Barceloneta, PR – June 1992 – March 1998

• Prepared design drawings using AutoCAD or Microstation for all engineering disciplines.

• Developed and enforced applicable drafting standards and guidelines in the design process.

• Performed process & instrumentation diagrams applying ISA standards in a high regulated facility.

• Designed, implemented and maintained the Controlled Drawings Program for regulated documents.

• Responsible for the completion of material take-off from drawings and performed accurate cost estimates.

• Assisted in the planning and scheduling process for projects.

• Coordinated and supervised contractors work during turnaround and/or shutdown activities.

• Prepared documentation and performed commissioning activities for assigned projects.

• Assured that safety measures were implemented and followed by contractors during projects. JUAN V. CURBELO, PMP, PMI-SP

United States Phone: 787-***-**** E-mail: ********@****.*** Education

Civil Engineering – Polytechnic University of Puerto Rico, Hato Rey, PR (Some credits) Computer Aided Design & Drafting - Liceo de Arte y Tecnología, Hato Rey, PR Mechanical Drafting - Coastal Training Institute, Aguadilla, PR Chemical Engineering Technology - University of Puerto Rico, Arecibo, PR (Some credits) Technical Drafting - Pablo Avila High School

Trainings/Certificates

USACE Quality Control for Contractors Certified

OSHA Construction Safety Training 30 Hours

CM & PI Construction Management and Planning

UNO Project Management Principles and Practices

PMI Certified PMP # 1278502

PMI-SP Certified # 2037619

APDC Equipment Qualification training

AAA - Arbitrator

Employers/Clients List

- Flexible & Integrated Technical

- Eli Lilly, Carolina, PR

- AbbVie, Jayuya, PR

- AbbVie, Ltd., Barceloneta, PR

- Abbott Healthcare Ltd., PR

- Johnson & Johnson, Lifescan

- Edwards Lifesciences

- GSA - General Service Administration

- CROM Engineering Services

- Johnson & Johnson, Netherlands

- Infrastructure Financing Authority, PR

- Mar-Land Industrial Contractors

- Abbott Vascular, Barceloneta, PR

- Baxter, Guayama, PR

- Caribbean Project Management

- Aqueducts and Sewer Authority

- Bristol-Myers Squibb

- Abbott Pharmaceuticals Ltd.

- Abbott Fermentation Products Inc.

- Abbott Chemicals Inc.

Member of:

PMI – Project Management Institute

AACE – Association for the Advancement of Cost Engineering CSI – Construction Specification Institute

PMCOS – Project Management College of Scheduling

CPM – College of Performance Management

Planning Planet

JUAN V. CURBELO, PMP, PMI-SP

United States Phone: 787-***-**** E-mail: ********@****.*** Software

Primavera

MS Project

MS Access

QuickBooks

AutoCAD

Intools

MS Office Suite

Microstation

Timberline

Oracle Latista

Primavera Unifier

Projects

Eli-Lilly Freezers & Solvent Shed Facilities 22M

Eli-Lilly ACN Recovery Project 20M

Eli-Lilly UREA Waste Project 23M

J&J Calibra Clean Room Project, 3M

Schools for the 21th Century Program, Puerto Rico 850M 2010 Central American and Caribbean Games, Mayagüez, PR 230M STS Water Quality Project, Puerto Rico 8M

Glatt Fluid Bed Dryer Overhaul 2M

Siemens Water Purification system 1.6M

AquaChem Water Still Project 1.2M

IPA/IPAC Still 3M

MeCL Stripper Column Project 2M

Above Ground Chemical Sewer System 8M

Fermentors Soy Bean Oil Addition 3M

Nitrogen System Validation .5M

Fermentation Building Vent Sys. Replacement 1.5M

Calibra Clean Room 1.5M