CAREER OBJECTIVE

To work at an organization, where I can put to use the skills I have learnt in my academic and project career, solve practical technological challenges, as well as contribute to meet the organization’s needs and set goals.

SKILLS

*ERECTION,COMMISSIONING AND OVERHAULING OF TURBINE,TURBOGENERATOR BOILER FEED PUMP,P.A FAN.FD FAN.OILPUMP,CEP,VERTICAL PUMPS,HORRIZONTAL PUMP,SCANNER FAN,HIGH PRESSURE VALVE,HIGH PRESURE PUMPS, ETC.

*CONDENSER, STATIC EQUPMENTS OF THERMAL POWER STATIONS ERECTION AND OVERHAULING

*PIPING OF OIL LINE, INTEGRAL LINE, INTER CONNECTING LINE, WATER LINE, SPRAY LINE, SEAL STEAM LINES ETC.

*EXECUTION OF RCC CHIMNEY (275M), STELL FABRICATED CHIMNEY.

*FABRICATION OF BEAMS, GIRDERS INTERNALS

QUALIFICATION

MBA in finance and POM

Completed BTech from B.I.E.T Bhadrak, in mechanical engineering under Biju Pattnaik University of Technology in 2011 and secured 7.06CGPA

Passed 12th from Regional college, Rambag, Jajpur in 2007 and secured 58.5%

Passed 10th from BhadrakzillaSchool,Bhadrak,Orissa in 2004 and secured 69%

WORK EXPERIENCE

O&M SOUTIONS LTD (INDIA)(8.5.2016 TILL DATE)

SITE-TATA POWER (3X67.5)

DEG-SR ENGINEER MAINTENANCE (MECHANICAL)

WORKING AREA-BOILER AREA AND STG AREA,PUMP HOUSE,COMPRESSOR HOUSE

PE ERECTORS PVT LTD

Deg-siteincharge

Specialized area -stg, all rotating equipment such as bfp,cep,mop,aop,lop,jop,control oil pump,idfan,pafan,seal air fan,scanner fan and static equipments.

##AT OTPC(ONGC)TRIPURA,UDAYPUR (726 mw)(till2.5.2016)

TURBINE RECTIFICATION JOB

Combine cycle powerplant (unit 2)

MAKE-STG-BHEL,INDIA

GT GE,GERMANY

PROB-vacuum not increased,steam losses etc (stg area)

Rectification-re fining at lp gland area,refining at rotor and machining as per required dimension

De coupling of rotor s alignment check,re alignment of rotors and box up, vacume pump decoupling,pump gland seal replace and re alignment,

##ERECTION JOB ATHINDALCOUNIT 5 (14.4.15-1.9.15)

Project –hindalco 6 x150 mw

Make-BHEL

Alignment of rotors,alignment of bfp,cep,motpumps,dmcw pumps etc

##Over hauling job- hindalco20.2.15-13.4.15

Make-BHEL

Unit 3

Replace of generator rotor

Rollcheck of lp

Hpip centering check

Box up

Unit -4

Replacement of lp rotor,disassembly of hpip generator

Realignment of rotor train

Box up

##overhauling job –wbpdcl 17.1.15-19-2.15

machine –fuji electric ltd japan 210 mw

Disassembly of hpiplp generator& assy.

Realignment and boxup

##overhauling job at hindalco, adityaaluminium,lapanga,sambalpur (odisha)

Make-BHEL

Unit -150 mw,turbine- bhel<20.1.15-15.2.15>

-lp rotor replacement,re alignment of ip-lp and lp- gen, and box up,re alignment of exciter

## Overhauling job at TATA POWER LTD jojobera,jamsedpur<15.12.14-16.1.15>

Machine –BHEL,unit -120mw

-hp –ip combine module and lp two cylinder turbine and air cooled generator

-it’s a major overhauling hp-ip,lp and generator ---Hip outer casing removal,inner inner casing removal, balancing piston removal,hip rotor removalRotor sand blasting,bottom inner casing removal,ms and hrh valve removal,lp outer casing removal,inner inner casing removal,glandremoval,Lp rotor removal with compansetor, removal of compansetor,lp rotor sand blasting,gen cooler cleaning hydro,thread out of generator rotor,removal of exciter.alignment of hip with respect to rotor box up,all valve laping and re fitted,alignment of rotors hip-lp-gen .

Auxiliaries-Bearing change of motor,boosterpump,overhauling of hydraulic coupling, catridge of bfp as same as of 3 sets of mdbfp, servicing of ejector,mot oil cooler,aop,jop,lop,cleaning of hrh,ms strainer etc

##erection of unit 5 at lapanga,hindalco<11.10.14-14.12.14>

Unit-150 mw turbine- BHEL

Erection and alignment of hpip,lp,generator

Alignment of rotor train,barring gear

##Erection job atNTPC,muzafarpur,kanti(13.8.14 9.10.14)

Make-BHEL

Unit-1

Capacity-250mw

Job-speed up the project for barring gear and steam blowing

Integral piping,final alignment,deck floating,condenser hydro,mdbfp,cw pumps etc.it was a great project for handle and even one day was not delayed .

##A M Cat bakreswar thermal power<WBPDCL> WEST BENGAL<17.2.14-011.8.14>

Unit 210mw,turbine-FUJI ELECTIC LTD JAPAN,BHEL-INDIA

-ALL valve s of power house,tg,bfp,lub oil system control oil system,static auxiliaries and rotating auxiliaries etc.

## HINDALCO erection project

Deg- s r engineer (turbine)

make: BHEL(steam turbine)

erection,From 03.08.2012 to 13.12.14 in the erection of

STG and Auxiliaries up to 150MW.

Site: 6 x 150 MW Hindalco site, Lapanga, Orissa.

Turbine alignment of turbo generator,pumps,bfp,cep,dosing system etc

Erection of heavy equipment such as dearator,fst,cst,hpheater,lpheater,stator,hp turbine etc.. with proper erection planning

Preparing Commissioning Checklists and planning and execution of Commissioning within the Scheduled period

RCC CHIMNEY PROJECT(19.6.2011-1.8.2012)

Working comp-gammon india ltd

Deg.-engineer

Client- Hindalco

Chimney 2 x275 mtr

Exp-erection of slipform,hydraulic system,plant machinery,batching plant,fabrication and erection of steel structures in 275 m rcc chimney

ROLE

.Executionof turbo generator,all rotating equipment,condenser, static equipment and piping

. Planning of work program

.billing according to work program

.site management

.Resource Management

.ACHIEVEMENT completion of project work of 2 units in 21 month instead of 2 years with safe work of satisfaction .

Responsibilities: -

Project execution and coordination with vendors regarding for requirement, readiness of Civil/ Mech. Structures and Other Utilities.

Thorough inspection of civil drawings, steel reinforcements, castings comparing with the mechanical drawings including openings, inserts, pockets.

Planning of erection and commissioning Schedules

Preparing Commissioning Checklists and planning and execution of Commissioning within the Scheduled period.

Studying the drawing and solving the problems itself at site

Daily attending the meetings explain work status to customers

Hands of experience in the alignment of various pumps like BFP, CEP, Oil pumps etc,

Hands of experience in alignment of turbine generator and condenser,all pumps,vertical horizontal pumps,id fan,fd fan,seal air fan,scanner fan etc..,bop maintenance,overhauling,……

Also kwnlodge inslipformerection,fabrication and execution of rcc chimney 2 x 275mtr .

TRAINING ATTENDED

Auto cad – 2D & 3D, Version-2007.

ADD.TECHNICAL INFORMATION

Knowledge in MS Office word & Excel

Knowledge in C & C++

Knowledge in Auto cad

HOBBY

READING POSITIVE BOOKS

CONVERSATING ABOUT POSITIVITY

MUSIC LISTENING

GIVING COMPANION

ACCEPT CHALLENGES IF NEEDED

# -- BELIEVE ON

“WINNER S ARE NOT DIFFERENT,THEY DO THETHINGS DIFFERENTLY”.

IMPOSSIBLE SAYS-I M POSSIBLE.

PERSONAL DETAIL

FATHER’S NAME : Mr.Raj kishorechoudhury

NATIONALITY : Indian

RELIGION : Hindu

DOB : 06th July, 1989

GENDER : Male

MARITAL STATUS : Unmarried

LANGUAGE KNOWN: English, Hindi,Sanskrit bengoli and Oriya

DECLARATION

I hereby declare that the above statements made are true and complete to the best of my knowledge and belief.

Chinmay kumar choudhury



Contact this candidate