Robert J. Stillman

** *. ********** **. *******, New York 14843 Phone-607-***-****

Cell-607-***-**** ac2f28@r.postjobfree.com

OBJECTIVE: Mechanical Designer/ Project or Construction Manager

SUMMARY OF QUALIFICATIONS

Over 30 years experience as a Mechanical Designer/Drafter as well as

Project/Construction Manager in the fields of Industrial, Bio-Pharmaceutical,

Waste Water Treatment, Pulp & Paper, Civil,, Commercial Construction, Prisons & Hospitals.

Senior Mechanical Designer with extensive

project leadership experience in process design, process piping, machine and process

equipment design. Experience in Project/Construction Management in all fields

listed including scheduling, project costs estimation, field walk-downs, change orders, punch lists, documentation, bi–weekly contractor meetings, information bulletins, request for information, daily reports and reviewing contractors bids, liaison with contractors & customer.

Able to work well with clients, to resolve issues, perform planning and ensure satisfaction and SAFETY

OSHA 30 Hour Occupational Safety & Health Training Course

PROFESSIONAL EXPERIENCE

Jacob Engineering, New York City 212-***-**** 2016 to Present

New York State Office of General Services, Wallkill Correctional Facility

Project Locations: Wallkill, New York

Mechanical/Plumbing/Electrical/ConstructionSuperintentent/Inspector and CADD Coordinator

Installing 2 Security Fence Around Wallkill Correctional Facility

Construction Of A New Guard Tower

Enlarging Of Facility Parking Lot With New Black Top And New Striping

Building New Salt Shed

New Memorial Flag Pole Pad

Remodeling For a More Secure Arsenal

Civil, New Patrol Road, New Parking Lot, w/ Road & Helicopter Pad

LiRo Engineering

M.E.P.C Superintentent/Inspector 2015 to June 2016

Project: M.C.C. Downtown Campus (Remodeling Old Kodak Building To A College Campus)

Project Locations: Rochester, New York

Project: 56 Million Dollars

Total Demo of Building

Supervisor All Construction & Inspection Of Same

New Concrete, Block Walls, Electrical, Plumbing, H.V.A.C. Duct And Water Lines And All Mechanical Equipment

Handling All And Answering All In The Field

CAD Coordinator

So Much More To List

Capitol Construction Services Feb. to June-2015

Superintendent

11051 Village Lane Square, Fishers, Indiana

Project: DXL Men’s Store

Project Locations: Albany, New York

Project Superintendent $770,000 Project

Complete Demo of Store

New Plumping, Electrical & HVAC

New Sheet Rock & Painting

Installing New Carpeting & Furniture Assembly

Electrical, Fire, Plumping & Installation with County Inspectors

Capitol Construction Services Oct. to Dec.-2014

Superintendent

11051 Village Lane Square, Fishers, Indiana

Project: HH Gregg Store

Project Locations: Wilmington, Delaware

Project Superintendent $650,000 Project

Demo floors, walls & old electric.

Laying new floors, sealing & waxing

Building new walls, electric for 7 new Kitchenettes (high end appliances show cases)

Painting, installing kitchen cabinets

Scheduling, construction & electrical inspector.

Jacob Engineering, New York City 212-***-**** 2012-2014

New York State Office of General Services, New York State Troopers Troup “F”

Project Locations: Middletown, New York

Mechanical/Plumbing/Electrical/Construction Inspector and CADD Coordinator

LEEDS Silver

Inspector for new Forensic Investigation Unit Building/New Communication and Training Building also Renovation on Existing Main Building. $15 Million Project

Inspecting all work done by contractors, subs and vendors to see if their work matches all drawings, spec’s and safety.

Inspecting work site daily for safety and OSHA regulations.

Reviewing Contractors changes.

Holding bi-monthly update meetings.

Civil, New Parking Lot, w/ Road, Helicopter Pad & Prepping Site for New Forensic Building

Jacob Engineering, New York City 212-***-**** 2008-2011

Georgia Pacific, Jacksonville Fla,

Project Locations: Crossett, Arkansas & Baton Rouge, Louisiana

Project/Construction/Manager

Construction estimating of projects.

Direct all phases of construction for a two pulp and paper mills remodels, $300 Million Project.

Directing management team.

Reviewing all Contractors bids and change orders.

Approving payments for contractors and their subs.

Working out of the design build office in Jacksonville Fl., to review all documents and paper work involving the two projects.

Hired and supervised Contractors and vendors.

Civil, New Parking Lot, w/ Road, Prepping Site for New Warehouse Buildings

Jacob Engineering, New York City 212-***-**** 2008-2011

New York State Office of General Services, Five Points Correctional Facility

Project Locations: Ovid, New York

Mechanical/Plumbing/HVAC Inspector and CADD Coordinator

LEEDS Gold

Inspector for new Mental Health Facility $45 Million Project.

Inspecting all work done by contractors, subs and vendors to see if their work matches all drawings, spec’s and safety.

Inspecting work site daily for safety and OSHA regulations.

Reviewing Contractors changes.

Holding bi-monthly update meetings.

Civil, New Parking Lot, w/ Road, Prepping Site For New Hospital Building

PraxAi r, Buffalo, New York 2008

Sr. Mechanical/Piping Designer

Cold Box Design

3D & 2D Design Piping & Mechanical Structures for Cold Box’s

Complete Model Drawing, Detail Drawings, Section Drawings & Bill of Materials

Holding bi-monthly update meetings.

Optination Technical Inc. 585-***-**** 2007-2008

Rush, New York

Mechanical/Piping Designer

Created and designed computer aided drawings for Mechanical/Process Piping.

Updating as-built drawings.

Final documentation over to customer(s).

PraxAi r, Buffalo, New York 2007

Sr. Mechanical/Piping Designer

Cold Box Design

3D & 2D Design Piping & Mechanical Structures for Cold Box’s

Complete Model Drawing, Detail Drawings, Section Drawings & Bill of Materials

Thermal/Kinectics Buffalo, New York 716-***-**** 2005-2007

Sr. Mechanical/Piping Designer

Lead Mechanical & Piping designer for new Ethanol production plant. $5 Million Project

Supervising Mechanical design & drafting team in sizing pumps, layout of plant, vessel (separators) design, pipe sizing, steel design, building design.

Supervisor of construction in Hurford, Texas of Ethanol Plant. Overseen all trades, mechanical, electrical, plumping. Bi-weekly construction meetings, daily safety meetings.

Jacobs Engineering (Kodak Park) Rochester, New York 585-***-**** 2003-2005

Project Manager/Sr. Mechanical/Piping Designer

Lead mechanical designer on process piping. HVAC & equipment installations projects.

Working with Kodak Engineering on budgets, schedules & designs.

Supervising Mechanical design & drafting team & supervising construction.

Pulling together existing drawings, creating new drawings, checking drawings, field verifications of existing and new conditions.

Design review meetings and updates with customer(s).

Updating as-built drawings.

Final documentation over to customer(s).

Sear-Brown, Elmira, New York 607-***-**** 2001-2003 Project/Construction/Manager

Construction estimating of projects.

Direct all phases of construction for a pharmaceutical company.

Oversaw plan selections, site development & scheduling for new buildings & office/laboratories renovations.

Managed company budgets and projects as high as $33 Million Project, as well as smaller projects.

Monitored construction site ensuring compliance with specifications and safety.

Reviewed costs and purchases to maintain constant cost control.

Hired and supervised contractors and vendors.

Worked closely with customer regarding specification and issue changes.

Civil, Prepping Site For New Water Plant Building, Parking Lot w/Road

Sear-Brown, Elmira, New York 2000-2001

Mechanical Designer

Created and designed computer aided drawings for Mechanical Department.

Process Piping design drawings and HVAC drawings.

Changed drawings to reflect the “as-built”.

Cameron Fabricating Corp., Horseheads, New York 1999-2000

Project Manager

Construction estimating of project.

Working with customer to help understand their needs for the project.

Coming up with a design for the customer within their budget.

Following the project from beginning to the end.

Customer needs for machine designs.

Education

Associate of Occupational Studies New York State B.O.C.E.S.

Computer Aided Design/Drafting Building Construction

New York State University at Alfred, New York 1992-1994 1970-1972

Advance Professional Construction & Project Management 2011

Military

U.S. Air Force 1972 to 1976

Computer Skills

AutoCAD 2011 (2D or 3D) Micro-Station (2D or 3D)

Auto-PLANT

Professional Experience

Mr. Stillman worked on projects at two locations for Wyeth Pharmaceutical, Rouses Point and Chazy New York plants. His duties as Project/Construction Manager, issuing specifications and drawings for bids, hiring contractors for the projects, monitored all contractors and project work on a daily basis. Construction weekly construction and safety meetings with contractors, advised customer on all phases of work (daily and monthly reports. Followed required codes and proper safety regulations imposed by Wyeth Pharmaceutical, Federal Drug Administration and OSHA.

Relevant projects Mr. Stillman has been involved include:

Project/Construction Manager-Town of Troupsburg, Steuben County, New York-Wastewater Collection and Treatment Facility-this project includes preparation of preliminary engineering report and design of a new wastewater collection system would serve approximately 100EDU’s, Jasper-Troupsburg Elementary School, and various government customers in the Hamlet. The study evaluated the existing sewage conditions and possible alternatives for a new system. Alternatives included conventional gravity system vs. septic tank effluent gravity as well as various wastewater treatment methods. Based on costs and non-monetary criteria, a conventional system and Rotating Biological Contractor (RBC) treatment plant with intermittent tertiary filter was selected. Design was completed and reviewed by DEC. The project was financed by HUD, ARC, USDA rural Development and the NYS CWSF. The project cost was 1.96 million.

Wyeth Animal Research, Chazy, New York-Project/Construction Manager-Compared existing drawings of hot and water domestic water to existing piping conditions in the plant. Hot and cold lines were changed out from PVC to Orbital welded stainless steel piping and upgrades on valves and fittings. Replaced piping in ceiling, walls and floors, new fire suppression system installed. Worked with company supervisors within prescribed time frame to have work done on time, adhered to strict schedule that required days, evenings and weekend for timely completion. Bio-hazard safety training required and use of personal protection equipment were required in much of the areas for the work. Project cost $245,000

Wyeth Pharmaceutical Chemical Development Building, Rouses Point, New York-Project/Construction Manager for (4) new and refurbished laboratories. Worked with designer, engineers and scientists employed both by Sear-Brown-Sikorski and Wyeth Pharmaceutical to create new and remodeling of existing offices and laboratories. Process piping (natural gas, nitrogen, helium, compressed air, and vacuum lines) emergency shower/eyewash stations, fire suppression, new and relocated floor drains. Electrical serve, lighting, air handler unit the duct work, inline duct heaters with exhaust fans, masonry work and acid brick. Ordering and installing special equipment and furniture, scale hoods fume hoods, etc. Project cost $85,000 to $300,000 per project.

Wyeth Pharmaceutical, Rouses Point, New York-Project/Construction Manager for 100’X120’building for Water for Injection (WFI) building and custom equipment, issuing notice for bid’s, awarding of bid’s, coordinating with engineering/design and support team’s to issue 3D AutoCAD drawings and specification’s building, plumbing, process piping and electrical systems to serve all of Wyeth Pharmaceutical Manufacturing Plant in three distribution phases. Contacting and meeting with business that could produce custom equipment as needed. Excavating of ground for new building, installation of sanitary lines, floor drains, fire suppression systems, pouring concrete pad. Construction of structural steel building, with metal skin and masonry exterior. Installation of air Handles with duct work, ceiling heaters. Electrical installation of motor control center (MCC), ceiling lights. Variable Frequency Drives (FVD’s). Process piping, installation for (2) water metering skid’s, (2) carbon filter skid’s, (2) multi-media skid’s. (2) reverse-osmoses skids, (2) ambient stills, (2) 20,000 gallon storage tanks, all piped with orbital welded stainless steel. Project cost $33 million.

Robert Abraham’s & Associates, Middletown, New York-Project/Construction Manager for complete renovation of a 110.000 sq. ft. mini mall (strip mall) demo electrical serves for new, changing out all windows, reworked all masonry walls and floor (poured new floor if needed) installed all new restroom (handicapped accessible), Sheet rock all, complete paint and paper interior as well as exterior, added new restaurant with all utilities, repaved parking lot, new roof (shingles, rubber membrane), floor covering (carpeting, vinyl and ceramic tiles), fire suppression and alarm system’s. Project cost $350,000.

Corning Incorporated. Corning New York-worked on a number of projects involving process piping for equipment installation, machine design, plumbing.



Contact this candidate