M.SRINIVASAN

Contact No. : +919*********; E mail: ac2bae@r.postjobfree.com

~ HIGH-PERFORMANCE CONSTRUCTION PROJECTS MANAGEMENT EXECUTIVE ~

Catalyst for Construction Projects Execution Quality Assurance Manpower Leadership Project Expediting Health & Safety Compliances Project Cost Optimization

Highly accomplished senior project management professional and visionary, seeking to leverage 24+years of enriched experience in giving professional direction to large scale construction projects as…

CIVIL ENGINEER

Quality management expert, offering a hallmark career manifested by vertical and horizontal movements with success in planning, managing, leading and directing large-scale project operations by steering a team of field engineers for project controls, quality assurance, material expediting, health and safety programs, and purchase agreements.

PROFILE SYNOPSIS

In-depth expertise inspearheading high quality construction projects from detailed design, construction supervision and contract management to hand over stage.

Recognized for having managed and worked with complex competitive challenging projects and implementing them successfully with efficiency and quality within difficult terrains.

Instrumental in effective analysis of project operations for profitability improvement and efficient utilization of resources.

Successfully developed staffing plans, work schedules, budgets, and time lines for all assigned projects.

Hands-on exposure to successful simultaneous development of several projects.

Skillfully negotiated contracts that ensured quality and met standards.

MILESTONES SO FAR

Successfully handed over guest rooms to the consultants within stipulated time schedules

Key role in tracking of site security agencies and tracking of insurance for the works,machineries and euipments

Significantly contributed to work site evaluation with quantity survey and submitting for certificates.

Actively involved in planning amd implementation of the activities as per targeted schedules.

Provided and documented RFI, RFA and MAS.

Meticulouly followed up and maintained work site permit registration with city council apart from handling work site machineries and equipment for inspection with inspection agencies.

Executed the works as per consultants site instructions,variation orders and monitored for the incorporation of the QS monthly valuation.

Skilled in ordering and tracking of the materials,machineries,euipments with procurement and stores dept as per site requirements without wastage and minimising the time span of the machineries and equipments.

AREAS OF EXPERTISE

Construction Project Administration

Project and Construction Planning

Material Procurement

Quality Assurance

Project Cost Estimation

Project Site Responsibilities

Contractor Management

Quantity Surveys

Project Procurements

HSE Implementation

Project Documentations/Evaluations

Budget and Schedule Control

Work Flow Optimization

Team Leadership and Management

Liaising and Inter-personal Skills

PROFESSIONAL EXPERIENCE

Parbat Siyani Construction Ltd., Nairobi, Kenya

Construction Manager

DURATION FROM FEB-2014 TO JANUARY - 2016

Project : Radisson Blu-5 Star Hotel Project;

Responsibilities

Entrusted with the responsibilities of planning,executing & monitoring the project activitiesas per targeted schedule

Planning material resources, coordinating with subcontractors and with inspection agencies at the time of inspection for machineries and equipments.

Monitoring compliance with building and safety codes and as per local laws and regulations through inspection and evaluation.

Holding key negotiations for revision changes and additions to contract agreement with sub-contractors.

Scope of responsibility also included scheduling the projects in logical steps, obtaining all necessary permits and licenses, directing and supervising the works and workers, reviewing project specifications to determine appropriate construction methods.

Ensuring project valuations with QS and submission for certificates and dealing with sub-contractors payment as per monthly project valuation.

Monitoring project progress, tracking of project site security agencies and taking corrective actions in case of delays and emergencies in project activities.

Conducting sub-contractors co-ordination meeting (MEP&others) to resolve the issuesobstructing the progress (with nominated &domestic sub-contractors).

Coordinating seamlessly with architects,consultants and clients apart from other internal departments like planning,procurement,stores and accounts.

Executed and monitored the variation and additional works as per the instruction from the architect and monitoring the same for QS valuation.

L &T Electromech LLC, SOHAR, OMAN

QA/QC Engineer, 2008 to 2013

Key Result Areas:

Responsible for planning, programming and implementing as per the targeted schedule for procurement and site activities.

Accountable for implementing special safety training for all dept workers

Conducting safety awareness meeting and weekly sub-contractors(MEP&others) meeting to resolve bottlenecks and achieve targets.

Project Managed:

Oil Storage and terminal Facility Sohar Port Sohar port, in Oman; Client: Oil Tanking Odfjell Terminal & L.L.C, Oman: This project comprises Engineering Procurement construction of oil storage tank foundations and R.C.C Dyke wall, Bund wall, pump House Manifolds, Main Substation, Consumer Substation, Fire water pump house, pipe sleepers, Pipe Rack Foundations, OWS (Oil water sewage) system, Overall Storm Water system, etc.

Responsibility Outline:

Site Preparation, Excavation, Fill placement and compaction and Back Filling Inspection

Inspection of received materials and storage of materials and Pipe supports & pipe rack Erection,

Inspection of Cast -in-place concrete, Epoxy grout for Machinery support and Cement based non-shrink grouting and Asphalt paving and Structural steel for buildings.

Hydrostatic Testing of Tank Foundation. Settlement of Tank foundations

Inspection of overall civil & construction activities.

Verification of IFC civil drawings with the O.O.T (Odfjell Oil Tanking) and Engineering Standards.

Overall project QA/QC activities

Client/Sub Contractor Liaison

Preparation and compilation of quality records/reports.

L &T and Arun Excello, Chennai, India

Senior Project Engineer, July to October 2008

Project Managed:

Estancia-Model Township.

Responsibility Outline:

Responsible for reviewing all preliminary drawings, reports, proposals, including advance planning for the project conferring with the Management.

Controlled project plans by reviewing design drawings. Specification, plan and schedule changes.

Controlled Project costs by approving expenditures controlling contractor contracts.

Responsible for indentifying project phase and elements and assigning persons, machinery and equipments to phases and elements.

Responsible for conducting lab test for materials and site test to ensure the quality of works and materials.

Carried out the works as per project schedule, plan and project specifications for calculating the time and for sequencing.

Maintained project schedule by monitoring. Project progress and co-ordinating the activities.

Carried out Measurements and Valuations.

Day – to – Day Management of the site, including supervising and monitoring of materials, equipments, machineries and sub – contractors.

Co-ordinated bill of materials issuance for construction.

Provided datas in respect of variation orders and site instructions.

Good communication with clients, consultants and internal supporting departments.

Preparation of site diary.

Negotiated with sub- cons for the minimizing the project cost.

Resolved the site issues through weekly progress review meetings.

Executed the projects in a cost and time effective manner.

S. V. Projects, Hyedrabad

Senior Project Engineer, Jan to May 2007

Project Managed:

India Cements Ltd.

Responsibility Outline:

Responsible for reviewing all preliminary drawings, reports, proposals, including advance planning for the project conferring with the Management.

Controlled project plans by reviewing design drawings. Specification, plan and schedule changes.

Controlled Project costs by approving expenditures controlling contractor contracts.

Responsible for indentifying project phase and elements and assigning persons, machinery and equipments to phases and elements.

Responsible for conducting lab test for materials and site test to ensure the quality of works and materials.

Carried out the works as per project schedule, plan and project specifications for calculating the time and for sequencing.

Maintained project schedule by monitoring. Project progress and co-ordinating the activities.

Carried out Measurements and Valuations.

Day – to – Day Management of the site, including supervising and monitoring of materials, equipments, machineries and sub – contractors.

Co-ordinated bill of materials issuance for construction.

Provided datas in respect of variation orders and site instructions.

Good communication with clients, consultants and internal supporting departments.

Preparation of site diary.

Negotiated with sub- cons for the minimizing the project cost.

Resolved the site issues through weekly progress review meetings.

Executed the projects in a cost and time effective manner.

Bharath Constructions, Trichy

Site Engineer, 2002 to 2007

Project Managed:

Individual Residential Buildings, Row Houses, Marriage Halls, Twin Bungalows, Duplex Bungalows and Hotels

Responsibility Outline:

Responsible for setting out the works in accordance with the drawings and project specifications.

Carried out effective implementation of planned design and schedule.

Managed Monitored, translated the design into works on the Project Site in an effective way.

Planning the work activities and efficiently. Organizing the work force, materials, plant and site facilities in order to meet agreed deed lines.

Responsible for calculating the estimate of working day works and work force.

Driving the work force with still of good leadership.

Responsible to check the materials according to the standards and specifications and execute the work smoothly.

Quality control in accordance with procedures, method statements, quality plants and ITP.

Liasing with procurement and other supporting departments.

PREVIOUS ASSIGNMENTS

Sabaree Constructions, Trichy, Site Engineer, 1996 to 2002

MIS S.K.V Construction, Trichy, Civil Engineer, 1989 to 1995

PWD special Buildings -Kumbakonam Sub- Division, Tamil Nadu, Technical Assistant ( N.M.R), 1988 to 1989

EDUCATIONAL QUALIFICATIONS

PROJECT MANAGEMENT PROFESSIONAL (PMP)– COMPLETED TRAINING CONTACT CLASSES - AWAITING FOR EXAMS

SOFTWARE SKILLS

PRIMAVERA –P6

MICROSOFT PROJECTS ( MSP-2010 )

Diploma in Civil Engineering, Seshasayee Institute of Technology, Trichy, 1985 to 1988

Date of birth:20th June 1969

Languages Known: English, Tamil and Hindi

Permanent Address: Plot No-85, N.G.O.Nagar, N.K.Road Thanjavur

Passport Number: H0401816

REFERENCE:

MR. SRINIVASA VEDULA

GENERAL MANAGER

PARBAT SIYANI CONSTRUCTION LTD- NAIROBI.

CONTACT - +254*********.



Contact this candidate