Post Job Free

Resume

Sign in

Test Technician

Location:
Palmdale, CA
Salary:
40/hr
Posted:
September 14, 2017

Contact this candidate

Resume:

RESUME of CESAR SONGCUAN

POSITION DESIRED : Cable Technician

Address : ***** ********* ***** ********* **. 93534

Mobile : 661-***-****

Email : ac2a6n@r.postjobfree.com

Experience : July 2016 – Present

POSITION - TESTER / INSTALLER WIRELESS (Contractor)

AMATEL: AT&T / T-Mobile 4G LTE Project

1.Integration of 1st/2nd/3rd /4th/5th/ Carrier LTE RBS 6601 DUL / DUS (DAS) and 5216 Baseband LTE Equipment

2.Install Rectifier Cabinet, Batteries, Purcell Cabinet, Power Cables as per Ericsson Standards

3.Migration of LTE AT&T / T-Mobile L700/L1900, Call Testing and Power Upgrades

4.Perform LTE (PSAP/SRS) Testing (VOLTE) Voice over LTE, E911 Call Testing, Data Test and NEA Testing

5.Install and Re-Configure Microwave and Antenna’s Azimuth and tilting as per Configuration .

6.Migration of DUL – DUS To 5216 Baseband using FTP file tranfers

7.Troubleshooting ALU-Alcatel Lucent Router/ CISCO SIAD Router and coordinates to MSNnetwork and SIAD Bridge as per IP Designation to certain Site

8.Terminate and Install CAT5/CAT6 / Fiber Optic /Trunk Fiber from CISCO Router and to LTE

9.Install and Terminate RRU Fiber from Antenna to LTE Unit Equipment

10.Performed Troubleshooting in VSWR/RSSI and making sure all

11. E911 Call Testing 700Mhz,1900Mhz,2100Mhz,2300Mhz,850Mhz

12.Performed Troubleshooting of Trunk Fiber and Loop back Test

Nov. 30, 2015 to June 24,2016

POSITION - Telecommunication Specialist (I.T) Construction (SCE)

Edison International - Southern California Edison Electric Co.

1. Build New Communication Room including 19’/23’ Rack, Fiber Tray and Cable Ladder.

2. Installation of DMX Modules, ZHONE Channel Banks, TSS 5 Modules and Circuit Protection (SCADA).

3. Installation of NETGUARDIAN Modules and Termination of Alarms to

Main Distribution Frame (MDF)

4. Termination of Single/Dual Mode Fiber Optic Cables, Voice/Data Cables.

5. Installation of CISCO Routers, Jungle Mux Multiplexer, Sonet.

6. Power Upgrade including Installation and Termination of Power Cables and Circuit Breakers to the Power Board.

7. Termination of Cat5/Cat6 Data Cables to the Patch Panels at IDF Room.

8. Testing of Ring Circuits using OTDR, JDSU, Shoot Lights Test and

Troubleshooting Fiber connectivity

9. DS3/T1 Circuit Connect/Disconnect patch cable to the DS3 Modules.

10. Site Walks and Final Preparation of Circuit Test prior for PMR Schedule.

June 23, 2015 to Nov. 27, 2015

POSITION - CABLE TECHNICIAN (I.T) TEKSystem Contractor-LOCKHEAD MARTIN AERONAUTICS

. Installation of Data /Voice Cable to Switches/Routers/PBX System

. Terminate Data Cable and Fiber Optic Cable from Main Feeder to

Distribution panel

. Termination of Data Cable CAT6/CAT5/CAT3/Fiber Optics at Patch

Panel/IDF

. Fabricate Connectors Fiber Optics (Single Mode,Multi Mode,Unicam)

. Installation of LAN/WAN- Cisco Equipment

. Data Cabling for Routers,Swicthes, Computer Room, KVM Room

. Knowledge in TCP/IP Voice over IP Telephony

. Knowledge in Configuration and Activation of CISCO Data Ports

June 2012 – Dec 2012

POSITION - TESTER / INSTALLER WIRELESS BROADBAND NETWORK

Huawei/Clearwire/Nextgen 4G LTE Project

1.Install additional WiMax LMPT Card for Backhaul

2.Install additional LBBP LTE card for antenna configuration Install and run additional power cables Re-configure GPS antenna and add splitter to accommodate the new LTE

3.Maintain and operation CDMA (Code Deviation Multiple Code)

4.Maintain and Operation iDEN (Integrated Digital Enhance Network) for Motorolla

5.Drive Test/Handover ATPTest for all LTE Sectors

6.Site Complete by filling out Closeout Package including Site Pictures with a new Upgrade kit

7.Installed in DDB 54", Nu-WAY 66, AGG POP and Indoor Shelter 84

8.Troubleshooting RRU Fiber Connection and Isolation test from Antenna to RBS Cabinet

May 2010 – December 2011

POSITION - TESTER / INSTALLER WIRELESS BROADBAND NETWORK

Amatel/ORIN USA: T-Mobile 4G LTE Project

. Add and Install additional Raxboard/TX Board in UMTS Cabinet

. Installation and Integration of NEW LTE 4G Network for AT@T

. Add TX Board in UMTS Cabinet and Enable for RNC to Activate

. Laying and termination Of Fiber Optic cables from Transmission to Radio Base Station (RBS)

February 2009 – January 2010

DatalogixTexas T-Mobile 3G Project

POSITION - SWITCHING INTALLER / TESTER

1. Installation of RBS UMTS Cabinet Site Survey for New Sites builds and Sites Upgrade Verify Nortel Radio Base Station with its Existing radio Configuration for future

2. Upgrade Take the Azimuth reading of existing Antenna in each sectors Measure how much Feeders and sizes from Antenna to RBS to be use.

3. Make a floor plan layout of RBS cabinet and Antenna Layout T1 testing and install additional T1 cables to NIU(Loopback Test)

4.Installation of Power Cables, Circuit Breakers and Grounding cables.

5.Fabricate and Install Jumper Cables from UMTS Cabinet to Antenna

October 2008 – February 2009

POSITION - TESTER / INSTALLER WIRELESS BROADBAND NETWORK

Datalogix Texas EXI - AT&T 3G Project

1.Installation and Testing of Radio Base Station (UMTS) Broadband wireless for mobile

2.Troubleshooting and repair certain radio frequency and adjusting to maximum rate

3.Checking data rate as per requirement and maintaining everything is under normal condition

4.Power Cable Installation and grounding of wire cables of UMTS 5.Cabinet T1 Testing and loop back test to Switching (RNC)

October 2007 – February 2008

POSITION - TESTER / INSTALLER

AMATEL - T –Mobile 3G Project

1.Repair and maintenance of radio base station

2.Installation of T1 Cables to NIU and verify its connectivity using loopback test

3.Troubleshooting and isolation test of bad RRU

4.Call Testing and handover Test for all antenna sector

July 2006 – August 2006

POSITION - Tester / Installer

Ericsson –Exi/Cingular 3G Project

1. Termination of T1 Cable and troubleshooting if problem occurred at NIU Unit

2. Integration and testing and Loading Scripts Files to RBS

3. Installation of UMTS RBS Cabinet 3106,3206.3303 micro cell

4. Installation of DC Filter and termination of AC cable grounding cable

5. Termination of RF Jumpers to Antenna and troubleshooting bad cross conection to Antenna

6. Troubleshooting RU and FU CardPerformed Test Calls and Data Test via Internet Access to check for Data Speed Performed Sectoral Handover Test

May 2005 – July 2006

POSITION - GSM Installer /Tester

Ericsson - Exi /Cingular GSM Project

.Installation of RBS 2106, 2206, 2250 indoor and outdoor HCHC Cabinet .Installation of IDB and prepare site prior to cut over Troubleshooting and repair faulty CDU, DTRU, ASU, HCU and components of RBS

.Re Building and re- configuration of DTRU radios in RBS cabinet .Testing and Commissioning

.Drive Testing and perform a Test Call and Diversity Test in all Sectors

.Sweep Test for RF Jumpers Channel Upgrade and Add DTRU Radio

September 2001 – April 2003

POSITION –Switching Technician GSM

Exi Telecom

.Checking the Plant specification in the installation binder and confirming that all materials listed are delivered at site.

. Placing the RBS, TRM, battery rack and rectifier in their positions according to the Floor Plan Drawing.

. Installation RBS 2202 Radio Base Station.

. Installation of TMR 9202 Transmission Equipment.

. Laying and Termination of Fiber Optic Cables to (M1) 1800 to Extension 1800 (E1) Master(MI) 900 to Extension (E1) 900.

. Termination of (DF) Distribution Frame to B.A.T.B. Alarm Panel.

. Connecting the PCM cable to the master cabinet according to the Cable Distribution Diagram (RBS signals) and running it to new DF.

. Installing the DF according to the Floor Plan Drawing.

. Running the alarm cable on top of the cable ladder to RBS.

. Connecting the Jumper Cable to RBS Cabinet as shown in the . . . . Antenna System Drawing.

. Performing a feeder system test to verify that the feeder system meets the requirement.

. Earthing of the new equipment will be connected to the earthing system.

. Termination from RBS cabinet toHuawei Transmission Cabinet.

. External alarms will be connected from RBS to DF panel.

Sept 1998 – Dec 2000

POSITION - Switching GSM Installer

Lucent Technologies International Inc.

. Installation of BTS Base Transceiver Station.

. Installation and termination Of fiber Optic cables from Switch Module to Transmission Modules

. Laying Power Cable from BTS to Rectifier Cabinet.

. Laying of external alarms from BTS to Alarm Panel.

. Rebuilding and configuration of TRUs. Installing all types of Lucent 5ESS-2000 Digital Switching System including erection and positioning of SM, LPT, CM, AM, GPDF, SPDF, cabinets.

. Assembly of Cable Rack and ladder, brackets, crossover, vertical and horizontal ducts.

. Fabricate, install and plug in intra/inter modules cable such as PICB, PIDP, DPIDB, MTB, NCT, fiber optic and other alarm cables.

. Laying of power and grounding cables from GPDF to the Rectifier Room, 128 pair/AIU cables from LPT to MDF.

. Laying and termination of 8 fold 120 ohm coaxial cables from DLTU tothe DDF frame, I0 AWG Black and Blue power cable from each cabinet

July 1994 – Sept 1998

POSITION - Telecommunication Switching Technician

Digital Telecommunications Phils.Inc

. Telecommunication Switching Technician 1994-1998DIGITEL (Digital Telecommunications Phils.

. Operation and Maintenance of Ericson Axe 10 Commissioning and installation of telecommunication equipment such as line circuit module, digital trunk module, power card module, C7 signaling module and Ericsson Per Gain system.

. Perform acceptance test on newly opened switching network system.

. Conduct feasibility study on networking performance and availability.

. Make recommendation on layout design for future expansion and forecast of total number of line required.

. Operation and maintenance of NEC NEAX 61 E multi/single and remote, K toll exchanges and S local exchanges.

. Perform Acceptance test for PABX Phone system such Uniden/AVAYA/NORTEL

. Updating of hardware equipment and files of switching system.

. Make switching trouble and facility report.

. Commissioning and installation of CARDPHONE unit.

June 1991 – July 1994

POSITION - Switching Technician

FILPHONE TELECOMMUNICATION PHILIPPINES

. Operation and maintenance of NEC NEAX 61 K Toll Exchange, 61 S . Local Exchange and 61 R Remote Exchange.

Operation and maintenance of power and rectifier and power generator.

. Locate and isolate subscriber line fault.

. Jumper subscriber lines at main distribution frame (MDF).

. Perform diagnostic test.

. Implement service order.

. Updating of hardware equipment.

. Installation of Telephone such as PANASONIC, MITEL, TOSHIBA, UNIDEN, NEC phone system

. Installation and repair of telephone PABX, KEYTEL, key telephone and . ASC automatic system console used by operators.

CERTIFICATIONS

. Telecom Switch GSM Technician 3

. Telecom SwitchTester UMTS - level 3

. Telecom SwitchTester LTE - Level 3

TRAININGS

SCE - SOUTHERN CALIFORNIA EDISON TRAININGS

. NERC CIP1

. NERC CIP Electronics Access

. NERC CIP Physical Access

. Workplace Violence Prevention

. Records Management

. CYBERSECURITY Awareness 2015

. NERC CIP Physical Security

. NERC CIP Foudational

. Hazardous Material & Release Awareness

. NERC CIP General Access

AT&T / T-Mobile Trainings

. T-Mobile L700 Integration/Intallation Course

. Ericsson EAMS Training

. SIAD Fiber Installation Training

. 4G LTE Basic Installation Technique

. Smart Laptop Overview Training

. DUL / DUS Migration

. AT&T DUL/DUS Modernization

. Ericsson P37 Mobile CEM

. AT&T DUG / DUW Modernization

. T-Mobile Multi Standard DUG/DUW/DUL

. UMTS 3G Broadband System

. GSM Essentials

. Communication Engineering

. DSL PerGain Ericsson Commissioning

. NEAX NEC ISUP Training

EDUCATION

BACHELOR OF SCIENCE MAJOR IN ELECTRICAL ENGINEERING (BSEE)

Luzon Colleges (Philippines)

REFERENCES

Superintendent Edison - Electric I.T Construction – Todd Cromelin

Cell- 714-***-****

Supervisor - Edison Electric I.T Dept. – Benjamin Villanueva

Cell- 714-***-****

Supervisor – Edison Electric I.T Dept -Florante Mercado

Cell 714-***-****

Superintendent Edison Electric I.T - Mark Rothenburg

Cell 626-***-****



Contact this candidate