CURRICULUM VITAE

I. Personal Details

Name : K.RAJKUMAR

Father’s Name : R.KRISHNAN

Date of Birth : 21.05.1975

Address : **, *.*.*.******,

: Vadasery,

: Nagercoil – 629001.

: Kanyakumeri District,

: TamilNadu.

Mobile No : 944*******

Passport No : H 1223364

II. Educational Qualification

Academic : SSLC

Technical : Diploma in Electrical and Electronics Engineering Elective : Industrial Electronics

Additional Qualification : Competency Certificate for Electrical Supervisor,

(‘C’ License No - 24412)

: Computer Language in DCA.

III. Experience

1) In M/s.Nagammal Spinning Mills Ltd., Nagercoil ( 4 Months ) 2) In M/s. Wescare (India) Ltd. (10 Years)

3) In M/s. Indo – Wind Energy Ltd. (4 Months)

4) In M/s. SreeSairam Wind Tech Pvt Ltd; (5 Years) 5) At present working in M/s. Sri Ganesh Wind Power Engineers Pvt Ltd; Since 27.07.2012

Details of Experience

In Nagammal Spinning Mills Ltd, I was undergone training in the Electrical Department for Motors Generators and Breakers. In Sree Sairam Wind Tech Private Ltd. Nature of My Works.

Erection, operation, Maintenance activates of DLWL 250KW, 80KW, AWT 250KW, LITENER 1500KW Wind Electric

Generators. (Siemens, ABB Generators) EB Licensing and Commissioning for New Services. And Safety follows for New Services.

Designation: Assistant Manager

Responsibilities:

HT Side

Commissioning and Maintenance of 315 KVA, 1700 KVA Power Transformers over 11 KV, 22 KV, 33 KV Line Break Down, Maintenance and doing operation and Maintenance of 2 pole / 4 pole / 8 pole / 10 pole structure.

Laying HT/ LT, UG Cables and their termination work.

HT – QC works follow – up with incoming spares and Materials.

Erection and Commissioning of OH Transmission lines of 11KV, 22 KV, 33 KV systems.

Erection, Supervision and Commissioning of 11 KV, 22 KV, 33 KV DP Structures and Maintenance work.

Erection, Commissioning and Maintenance of VCB, OCB, OLTs.

Right to necessary Line Clearance from TNEB attending the 11 KV, 22 KV, 33 KV Line break down and maintenance.

Prepare the connected load details of HT installations like generators, Transformers, Motors and Co ordinate with officials of Electrical Inspectorate for Rule 46 Inspection.

HT Service EB Meter, CT/PT failure at the time new EB Meter, CT/PT fixing purpose Meter Box wiring and EB follow up works.

Inspection and Supervision of HV installations like Power Transformers, Insulators, LAS, Cables, Switchgears, Conductors, Bus bars, Structure at Site.

Co ordinate with TNEB officials for taking monthly readings at various divisions of Tirunelveli, Tuticorin Electricity Distribution Circles.

Collection of Wind Power generation Statements at Superintending Engineer offices of Tirunelveli and Tuticorin Electricity Distribution Circles.

Co ordinate with TNEB officials for metering equipments maintenance and break downs follow up.

Prepare the returns of Electricity Tax on Consumption on behalf of our Clients and submit to Electrical Inspector Office of Tirunelveli.

Prepare and submit the invoices for sale of power generation to TNEB and also follow up with our clients for Payment.

Taking Corrective and Preventive Actions (CPA) on customer complaints to prevent occurrence of such complaints.

Maintenance of MIS data on Invoice details of sale of wind power generation.

EB Liasoning Works:

Preparation of getting NOC of wind mills installation and liasoning with State Electricity Board.

Getting CEIG approvals and Safety Certificate for WEG installation and their corresponding Rule 3 inspection.

Preparation of getting Name Transfer for HT Service all paper works in local Distribution area and Tirunelveli SE office.

All Documentation works for New HT Services Commissioning and New HT Service Number taken work.

New Services taken purpose Estimation, Form II and All Papers preparation work.

Auto Card drawing in New Line route for Estimation Purpose.

Site Inspection Purpose Co-Ordinate with Wind Farm EE, AD,AE.

After Commissioning Test Report closing the same service.

All Documentation works for Old HT Services Bifurcation purpose.

LT Side

Trouble shooting of WEGS like DLWL 250KW, 80KW, AWT 250KW

Attending all the critical break down of WEGS.

Monitoring Performance of WEGS by analyzing generation and Reactive Power Consumption.

Execution of Controller Modifications, Panel Wiring and Commissioning of AWT WEGS Vs WP 2000 Controller.

Identification and rectification of faults in electrical equipment like WP 2000 Controller, WP 2040, Trigger Module; Mutator PCB

(Micro Process Based) power Control Panel Conversion of AC – DC – AC System includes 200,310,700,900 AMPS thyristers, Diodes, contractors, MCCB & other accessories.

Inter site co ordination for WEGS Routine Maintenance, Preventive Maintenance and Restart work activates.

Take precautions for avoiding break down and KVARH Consumption by observing the WEGS.

Updating the documents of quality management system periodically.

Suggesting Technical Feasibility and modification regarding.

Ensure the reduction of breakdowns, and site overheads. Civil Side

Getting Land patta, chitta and Land Tax follow up work with concem officials.

Land issues follow up from company side.

Handling of all kinds of Technical Papers Regarding WEGS troubleshooting.

New WEGs erection purpose Concrete Cubic test and Soil test Work follow up.

In Sri Ganesh Wind Power Engineers Private Ltd. Nature of My Works Designation: Liaisoning Officer

Responsibilities:

.

TNEB Coordination and ‘A’ Grade licenses issue processing work for Tamilnadu & Karnataka state.

Tender Prepared work, Quotation and Material rate finalized.

EB Licensing and Commissioning for New Services. And Safety follows for New Services.

Dedicated feeder Commissioning purpose all documents follow–up to TNEB (Rajapalyam, Erode circle)

Known and adopt the ISO procedure and document.

Yours Faithfully

(K.Rajkumar)



Contact this candidate