Post Job Free

Resume

Sign in

Engineer Test

Location:
Pontianak, West Kalimantan, Indonesia
Posted:
November 12, 2017

Contact this candidate

Resume:

Tias Setia

Specification *G RNO Engineer PT. SML

Time April 2017-October 2017

1. 2G RNO Telkomsel Swap EID to Nokia Borneo

Data Pribadi Perform radio network performance analysis and optimisation using Optima and RNO tools to achieve KPIs such as Call Setup Success Rate, TCH drop, Handover Success Rate and SDCCH, TBF DLSR, Completion SR Tmp, Tgl Lahir : Cianjur,06-05-1985 Worst cells analysis and troubleshooting Parameter tuning and modify the antenna parameter (tilt, orientation) Jenis Kelamin : Laki-laki ALARM Monitoring ( ZEOH,ZEOL, ZEEI...etc ) ND Analysis for Performed Cluster Optimization ( ND195,ND232,ND196,ND153 etc Agama : Islam Make Cut Over Hourly report, until cell have passed KPI lock value Warga Negara : Indonesia Optimization Drive test analysis using TEMS and Nemo. Status : Menikah Prepares QC network performance reports based on KPIs gathered Alamat : Jl. Komyos Sudarso, gg.suka pinang

no 31 pontianak

Make 2G Swap/Roll Out Report.

Make Customer Complaint Report

Kontak

Telepon : +62-812-****-****

Email : ac296z@r.postjobfree.com Specification 2G/3G RNO Engineer PT. Lexcorp Time September 2015 – April 2017

2. 2G/3G RNO Telkomsel Swap Nokia to EID kalimantan

Involved in post processing of DT Logs (Layer 3 Messages Analysis) Kemampuan Post Processing of Log files (Identifying and troubleshooting of Call Blocks, Call Drops, Hand Over Failure, etc.) Komputerisasi Investigation & Optimizing worst cells daily/weekly MS Word ALARM Monitoring for Performed Cluster Optimization MS Exel Make Cut Over Hourly report, until cell have passed KPI lock value MS Power Point Make 2G/3G Swap & Roll Out Report. Internet Make Customer Complaint Report

Photoshop Make a report cluster and QC report Kecakapan

Bhs Indonesia Specification 2G RNO Engineer PT. Immobi Solusi Prima Bhs Inggris Time Jun 2015 – September 2015

3. 2G RNO Telkomsel Truebex Jabodetabek

Perform radio network performance analysis and optimisation using Optima and RNO tools to achieve KPIs such as SDSR, TCH drop, Handover Success Rate,TBF ULSR, TBF DLSR, Completion SR & TCH Blocking

Worst cells analysis and troubleshooting Parameter tuning and modify the antenna parameter (tilt, orientation)

ALARM Monitoring ( ZEOH,ZEOL, ZEEI...etc ) ND Analysis for Performed Cluster Optimization

Make report Daily & Weekly degrade cluster for Costumer and plan action

Optimization Drive test analysis using TEMS and Nemo.

Bad spot analysis and clear bad spot

Make Costumer complaint report

Specification 2G PLO Engineer Work for PT Kencana Mandiri Sejahtera (KMS) Time May 2014 – May 2015

1. 2G PLO NSN Telkomsel RollOut South Sulawesi

Perform radio network performance analysis and optimisation using Optima and RNO tools to achieve KPIs such as Call Setup Success Rate, TCH drop, Handover Success Rate and SDCCH, TBF DLSR, Completion SR

Worst cells analysis and troubleshooting Parameter tuning and modify the antenna parameter (tilt, orientation)

ALARM Monitoring ( ZEOH,ZEOL, ZEEI...etc ) ND Analysis for Performed Cluster Optimization ( ND195,ND232,ND196,ND153 etc

Make Cut Over Hourly report, until cell have passed KPI lock value

Optimization Drive test analysis using TEMS and Nemo. Prepares QC network performance reports based on KPIs gathered

Make 2G Roll Out Report.

Make Customer Complaint Report

Specification 2G PLO/RNO Engineer Work for PT Universal Cellular Engineering (UCE) Time Sep 2013 – Apr 2014

1. 2G PLO Telkomsel Swap NSN to Huawe South Sumatra

Optimization Drive test analysis using TEMS

Involved in post processing of DT Logs (Layer 3 Messages Analysis)

Post Processing of Log files (Identifying and troubleshooting of Call Blocks, Call Drops, Hand Over Failure, etc.)

Make a report Cluster swap

Make Customer Complaint Report

Make Clear bad spot cluster with tuning parameter and tilting Time Jan 2013- Agustus 2013

2. 2G/3G RNO/PLO Indosat Project all Kalimantan

Perform radio network performance analysis and optimisation using Optima and RNO tools to achieve KPIs such as Call Setup Success Rate, TCH drop, Handover Success Rate and SDCCH drops

Worst cells analysis and troubleshooting Parameter tuning and modify the antenna parameter (tilt, orientation)

ALARM Monitoring ( ZEOH,ZEOL, ZEEI...etc ) ND Analysis for Performed Cluster Optimization ( ND195,ND232,ND196,ND153 etc

Make Cut Over Hourly report, until cell have passed KPI lock value

Optimization Drive test analysis using TEMS and Nemo. Prepares weekly and monthly network performance reports based on KPIs gathered CURRICULUM VITAE

Experience

Description

Description

Description

Description

Description

Description

Time July 2012– Des 2012

3. 2G RNO/PLO Indosat Project West Kalimantan

Perform radio network performance analysis and optimisation using Optima and RNO tools to achieve KPIs such as Call Setup Success Rate, TCH drop, Handover Success Rate and SDCCH drops

Worst cells analysis and troubleshooting Parameter tuning and modify the antenna parameter (tilt, orientation)

ALARM Monitoring ( ZEOH,ZEOL, ZEEI...etc ) ND Analysis for Performed Cluster Optimization ( ND195,ND232,ND196,ND153 etc

Make Cut Over Hourly report, until cell have passed KPI lock value

Optimization Drive test analysis using TEMS and Nemo

Interference troubleshooting in BTS sites using HP spectrum analyser Prepares weekly and monthly network performance reports based on KPIs gathered Time November 2010– July 2012

4. 2G NSN PLO indosat project area Kalimantan-Bali

Involved in post processing of DT Logs (Layer 3 Messages Analysis)

Post Processing of Log files (Identifying and troubleshooting of Call Blocks, Call Drops, Hand Over Failure, etc.)

Investigation & Optimizing worst cells based on DCR, CSSR, HOSR, Tch & SD Block,

SDDROP by monitoring TQM (hourly/daily) to meet KPI Acceptance Targets

ALARM Monitoring ( ZEOH,ZEOL, ZEEI...etc ) ND Analysis for Performed Cluster Optimization ( ND195,ND232,ND196,ND153 etc

Make Cut Over Hourly report, until cell have passed KPI lock value

Make 2G Roll Out Report.

Make Customer Complaint Report.

Specification Drivetest Engineer Work for PT Universal Cellular Engineering, Jakarta Time November 2009 – oktober 2010

1. 3G Swap Huawei-NSN HCPT Project for Jabodetabek area. Drive test long call and short call based on the route given or define own route based on field condition. FTP download and upload data collection, stationary or moving based on request. Single site verification(such as test call, GPRS, FTP, SMS, Voice and Video Call, Intra and Inter cell, Inter System Handover ) and make sure no swap feeder.

Drive test for VIP Complaint with Optim Engineer based on defined route and job request. Analyze logfile and create report to assist optimization process and consultate with optim engineer about parameter change. 2. 2G PLO NSN Telkomsel Project for Jabodetabek and West Java area.

Drivetest Pre Launch Optimization for new site and Hicap.

Work in idle mode and dedicated longcall mode based on Netact coverage prediction, also stationary GPRS test .

Re-homing test call with responsibility to check the voice call, data throughput, and handover intersite and intrasite funcionality of site after re-homing (change BSC), make sure that there are no dropped call and blocked call.

Analyze logfile and create Provisional Acceptance Certificate report. 3. 2G PLO NSN HCPT Project for Jabodetabek and West Java area.

Drivetest Pre Launch Optimization for swapped site and new site.

Work in idle mode and dedicated longcall mode based on Netact coverage prediction, also moving FTP download upload test .

Analyze logfile and create Provisional Acceptance Certificate report. 4. 2G swap Alcatel-NSN indosat project for area Kalimantan Barat Drive test short call based on the route given or define own route based on field condition. Drive test GPRS download, stationary or moving based on request. Single site verification(such as test call, GPRS, FTP, SMS, Voice, Intra and Inter cell, Inter System Handover ) and make sure no swap feeder.

Analyze logfile and create Provisional Acceptance Certificate report. 5. 2G and 3G NSN PLO indosat project area Bali

Drivetest Pre Launch Optimization for new site.

Work in idle mode and dedicated short call mode based on Netact coverage prediction, also stationary GPRS test Drive test GPRS download, stationary or moving based on request. Single site verification(such as test call, GPRS, FTP, SMS, Voice and Video Call, Intra and Inter cell, Inter System Handover ) and make sure no swap feeder.

Analyze logfile and create Provisional Acceptance Certificate report Specification Rigger Optimation 2G HCPT PT.UCE Area Jabar Time February 2009 – November 2009

Description Change Mecanical, Electrical, Azimuth antenna Specification Rigger PLO 2G Telkomsel PT. EFLAG area jabar Time 2008

Description Change Mecanical, Electrical, Azimuth antena Specification Garis merah Multimedia printing

Time May 2007- December 2008

Description Design grafis

Specification Rigger optimation 3G Excelindo PT LMT Area Jabar Time 2006

Description Change Mecanical, Electrical, Azimuth antenna Level Place-periode

College Universitas Pendidikan Indonesia, Bandung (2003-2007), Electrical Senior High School SMK N 1, Cianjur

Formal Education

Description

Description

Description

Description



Contact this candidate