Kein Jordany Pino Lever

B.Sc. Mechanical Engineer

ac24be@r.postjobfree.com

+57-321*******

https://www.linkedin.com/in/kein-pino-lever-7559856b/

Barranquilla, Colombia

LANGUAGES:

CREOLE

ENGLISH

SPANISH

REFERENCES:

ac24be@r.postjobfree.com

+34-645-**-**-**

TECNICAS REUNIDAS S.A.

JESUS ALVAREZ / PLANNING AND PRODUCTION CONTROL MANAGER

ac24be@r.postjobfree.com

+1-832-***-***

CHICAGO BRIDGE & IRON (CB&I )

CARLOS BALLESTEROS / GENERAL PIPING SUPERINTENDENT

PROFESSIONAL PROFILE

Professional in construction for the oil & gas, and power generation industries. With 8 years of experience managing and supervising projects from USD 150K up to USD 8B. As Construction Engineer I have passed through different roles and phases, from planning, executing, monitoring & control, and closing, from supervising to Managing projects. Working closely with Managers, Superintendent, and Supervisors. I have had under my responsibility directly around 20 labors and indirectly 800 (as part of a supervision team). I count with technical skills mechanical and Piping disciplines (also civil, structures, and electrical), such as planning, scheduling, and monitoring progress (physically and with different software tools), deploying labor in the job site according to schedule priorities, Risk Analysis Management, requesting and delivering material (BOM), and preparing reports. Cost control(EVM), from preparing and monitoring plan cost and Man Power (scheduling and budgeting), up to certifications for the contractors (BOQ), contract provisions analysis with FIDIC approaches. Actually, I’m a consultant for Construction Management Services.

EDUCATION:

INSTITUTO TECNICO INDUSTRIAL

Technical High School Electrician / JAN 2003 – DEC 2005

UNIVERSIDAD AUTONOMA DEL CARIBE

M. Sc. POWER MANAGEMENT / AUG 2013 – DEC 2013

Postponed

UNIVERSIDAD AUTONOMA DEL CARIBE

B.Sc. MECHANICAL ENGINEER /AUG 2007 – MAR 2012

Transferred Student - GPA 3.88/5

CERTIFICATIONS:

Workshop for special welding, structural and mining

Welding Codes and Standards

Metallurgy: Properties and Classification of Major Metals

National Seminar mining machinery

Occupational Health: Risk factors and prevention of accidents

Occupational Health: Risk factors and prevention of accidents

Second International Congress of Materials, Energy and

Environment

SOFTWARE SKILLS:

Win PCS

Navis Works

Autocad 2D/3D

SitePro, from CB&I

PCA (Piping Control Application), from TR

Primavera P6

Microsoft Office Professional Package

EXPERIENCE:

PLANNING AND PROJECT CONTROL CONSULTANT

SELF-EMPLOYED / OCTOBER 2017 – ACTUALLY

The most recently project I have worked on has a USD 20M budget. It consisted in making the crude oil plant functional again and increase the production capacity of the refinery by 50,000 BPD. We removed and reinstalled non operating mechanical and electrical types of equipment and their interconnections, fabricated and installed new ones. Reinforced structures and civil works, remove and installed new ones. Some of our main mechanical equipment are pumps, heat exchangers, water treatment plants, distillation towers, slop and drum tanks, compressors, and others. The following are the main activities I performed:

* Checking contracts, technical specifications, standards, engineering, and design drawings.

* Estimating execution work quantities and work packages, including the prices for each activity (scope and budget).

* Elaborating the execution plan and control for the project.

* Material requesting plan and control.

* Establishing reports guidelines (man-hours, equipment, and different kind of production progress).

* Monthly bill of quantity for the company pays.

* Checking activities on site.

* Daily security talks.

I also have a portfolio for Project Management services in Primavera P6, revising more than 30 different ongoing and new projects. The following are some of the activities I develop:

* Creating new projects

* Contracts provisions revision for claims, estimating at to completion analysis, EOT, BOQ, and others.

* Cost Vs benefit analysis.

* Cost Control (EVM).

* Scheduling, estimating and budgeting, updating progress and generating reports (S-Curve and others).

* Risk Analysis Management: Identification, structure codification, quantitative and qualitative analysis, response, reports, and supervision.

* Assigning and leveling resources (material, labor, nonlabor).

TECNICAS REUNIDAS S.A. / MAY 2016 – OCTOBER 2017 / LIMA, PERU

PLANNING AND PRODUCTION CONTROL ENGINEER

Project: Talara Expansion Oil Refinery (4.2 billion USD)

Planning and monitoring the progress for the fabrication of the spools and supports, from the workshops in the city of Lima to the job site (refinery) in the city of Talara. With an approximate scope of 1,100,000 inches we fabricated 50,000 spools, from 2 to 24 inches in CS, SS, alloy and other special materials. With a performance of 300 spools / per week. The followings were the main activities performed:

PCA activities: Creating isometric in the system, spooling, take off (traceability between joints, supports, and materials), updating progress and new revisions of isometrics and P&IDs, welding, Qa/QC,testpacks, and others.

Reports: Daily, weekly, monthly, and forecast for 6 months ahead. All reports related to inches welded, tons of supports fabricated, square and linear meters painted, amount of spools fabricated and dispatched to the job site, updating work front, material status, engineering status, priorities, QA/QC reports, manpower (labor & non labor), and others.

Preparing the certifications (payments) for the contractors monthly, according to contract provisions and the approved production.

Evaluating our contractors offers, to adjudicate them scope (cost Vs benefits analysis).

Meetings and constant communication with our colleges in the workshop and job site, also client and

subcontratctors.

Another important function was to establish guidelines for the contractors, to obtain a final input in

PCA efficiently and at the same time a synchronized language in both databases.

ACP / JANUARY 2016 – MAY 2016 / DIFFERENT CITIES, COLOMBIA

PROJECT CONTROL ENGINEER

Responsible for all mechanical projects, such as storage tanks (fuel oil and gasoline), fire protection system,

KAESER air compressed systems using smart pipe (in mining, manufactures, and others), and maintenance for

gas station facilities. During my time is this company we performed the following works:

Engineering and calculations for different projects.

Preparing proposals for different projects (planning, scheduling, assigning resources and estimating

cost).

Supervising the execution in the job sites and final approvement with our clients.

Preparing the bill of quantities to request payments to our clients.

CHICAGO BRIDGE & IRON (CB&I) / MARCH 2014 – APRIL 2015 / CARTAGENA, COLOMBIA

PROJECT CONTROL ENGINEER

Project: Cartagena Expansion Oil Refinery (8.2 billion USD)

The work was performed in the Tank Farm of the job site: Units 141 and 146 (Green Field, Brown Field and

LPG areas, including the flare and the drums). For the interconnection between 72 cylindrical tanks, 18

spherical tanks, 14 large tanks (LPG) and 18 pumping stations (76 pumps). We erected (construction)

approximately 475 000 ft. Of pipe from 3/4 to 72 inches, of which 170 000 ft. were straight pipe and the

remaining were spools (9800 spools erected). Also, the hydro testing, reinstatements, and walkdowns with

the client. Please find below the list of my functions:

The Unit 141 (Greenfield tanks, drums, and the flare) was closing construction phase, so I was

assigned to play a role as Surveyor Quantity, to verify physically with the work packages (isometrics

and P&IDs) all the pending and requirements, also the real status of the erection in our scope of work,

including the advance of the other disciplines that could hold our production. At the same time,

double-checking the supervisor’s daily reports on site. Subsequently I was moved to the brownfield

and LPG areas with the same role (unit 146).

As a consequence of the above, we decided to create a parallel database (using Microsoft Office

Excel), to keep the detailed real progress and pending of our Works. Also, to not affect our financial

and other reports. After this, we received a group of 10 supervisors for Surveyor Quantities / Punch

List) to support us with this job, and to obtain a balance between CB&I database (SITEPRO) and our

new database. It was a strategy to control our work, we could add more detailed information about our

status in all the phases of the work and take better decisions.

Then I started to play a role as Project Control: Planning, monitoring and updating the progress,

generating reports, seeking work front on the job site (civil, structural, electrical, material, painting,

etc.), requesting and delivering materials, and deploying labors & non labors around the site.

After finishing the erection/construction phase we started to use the same approach for the hydrostatic

test, the reinstatements and the walkdowns with the client (using WinPCS software tool).

MONTECZ S.A. / NOVEMBER 2012 – FEBRUARY 2013 / BARRANQUILLA, COLOMBIA

PROJECT ENGINEER

Project: Expansion of Palomino Compressor Gas Station

Coordinate the fabrication of the spools for the gas station, from the workshop in the city of Barranquilla to the

job site in the city of Palomino. The main responsibilities were:

Coordinate the welder's test (preparing the job site properly conditions, verify energy available,

materials, consumables, equipment, cranes, ETC).

Planning and monitoring the progress according to the engineering and material available.

Requesting and delivering the material.

Dealing with subcontractors and clients about bills, contracts, procedures and progress.

Make sure to work with the HSE and QA/QC (DT & NDT) standards and controls, and participation

in daily security talks.

Dispatching the spools to the job site.

SOPESA S.A. / MARCH 2011 – NOVEMBER 2012 / SAN ANDRES ISLAND, COLOMBIA

PROJECT ENGINEER

I worked on three projects simultaneously: 1. Expansion of The Power Generation Plant (MAN DIESEL

Engines - 28.6 MW). 2. Power generation with garbage (RSU Plant) 3. Power generation with wind

Coordinate and supervise the activities in the job site (for piping, mechanical equipment, civil and structural

works, electrical, and instrumentation). Through all the different phases such as the procurement,

construction, tests (hydro, visual and pneumatic), pre-commissioning, commissioning and hand-over.

Also, the construction of the respective powerhouse and other facilities, including the fire protection system.

This Project includes the erection of compressors, pump stations, storage tanks and control panels, cable trays,

instruments, water treatment plant, oil separators, cooling system, heat exchangers, ETC. Some of my main

responsabilities were:

Attending meetings with the stakeholders of the Projects: Owners, contractors, subcontractors,

manager team, government supervision, community and others as per requirement.

Checking contracts, instructions, manuals, Isometrics, blueprints, P&IDs and progress reports.

Participation in the master plan (Schedule, Budget, Man Power and the activities necessary for

the objectives).

Supervising the progress on-site according to the design and their changes (for mechanical, civil,

structures, electrical and instrumentation Works). In many cases, it needed to modify the design for

engineering, financial, construction and operational reasons.

I also performed operational activities, such as overhaul (major maintenance) on two power generators diesel

engines (MIRRLESS BLACKSTONE 9.6 MW and EMD 2 .1 MW) for 8 months, including corrective,

preventive and predictive maintenance. On the other hand, the implementation of an integrated management

system for quality, safety, occupational health and environmental (ISO 9001 2008, OHSAS 18001 and

ISO 140**-****-****) in the power generation plant. This consisted of the characterization of the power

generation processes, reestablishing responsibilities and competencies for workers, booking procedures and

instructions and others.

ASSOCIATION MEMBERSHIPS:

ACIEM (COLOMBIAN MECHANICAL, ELECTRICAL, AND

OTHER ENGINERINGS ASSOCIATION) / 2012 – PRESENT

ASSOCIATION MEMBERSHIPS

IAMSP (INTERNATIONAL ASSOCIATION OF MARITIME AND

SHIPPING PROFESSIONALS) / 2019 – PRESENT



Contact this candidate