Post Job Free
Sign in

Power Plant Superintendent

Location:
Many, LA, 71449
Posted:
July 31, 2017

Contact this candidate

Resume:

Richard T Morrison

General Field Superintendent

+1-318-***-****

*******.********@*****.***

Summary: Over 30 years of supervisory experience in a heavy industrial construction environment. Responsible for key management assignments on multiple complex projects including oil and gas refinery, power boiler erection and demolition, cement plants, scrubber projects, mining, and extensive structural steel and heavy rigging responsibly. Set exemplary standards for corporate safety, quality and productivity by implementing and monitoring project control systems and providing on the job training.

Professional Registration:

Central Louisiana Technical College

Fluor University

Russian RTN Protocols

ASNT-SNT-TC-1A Qualified Welding Inspector

Advanced Rigging

Certified Plus Iron

Field Safety Training

TWIC

Specific Experience:

Rigging Superintendent Exxon Neftegas Limited

Fluor Sakhalin Island, Russian Federation

02/2014 – Present

Onshore Grass – roots Oil and Gas processing facility. Facility included frame 6 Gas Turbine Generators, Frame 5 Gas Turbine Injection Compressors, Crude Oil Separation and Stabilization, Vapor Recovery Compressors and Scrubbers as well as utility and support systems. Remote Island, Arctic frontier location required large scale modular design execution along with significant stick – built portion. Responsible for all Crane and Rigging activities including Critical lift Plan preparation, Rigger training, and daily site inspections. Over 500 Brown Field critical lifts were planned and executed without incident.

Rigging Superintendent Barrick Gold

Fluor Pascua-Lama gold/silver/copper mine project

02/2013 – 12/2013 Chile/Argentina, Chile

EPC services for a $5 billion, 45,000 TPD gold/silver/copper mine and process facilities involved high-altitude work building transport for gold-, silver- and copper-laden ore from Chile to Argentina, mostly underground. This project is considered one of the harshest working environments ever attempted for a construction project, temperatures in the winter reach -40C and wind speeds of 309k have been recorded at the top of the mountain. Responsible for all onsite crane activities lift plan preparation and approval, scheduling of cranes and riggers and heavy equipment inspections.

Structural/Rigging Superintendent

Black & Veatch Eskom Kusile Power Station

10/2011 - 02/2013 Witbank, South Africa

Duties include Field Supervision Inspections’ planning and coordination of contract employees. Approval of heavy lift plans and method statements of boiler erector. Also responsible for training and knowledge transfer to client employees, and ensuring quality and scheduling of (6) 800 MW coal fired generating units.

Rigging Superintendent

Jacobs Group Motiva Refinery Expansion

10/2009 - 10/2011 Port Arthur, Texas, United States

Responsible for 154 indirect riggers receiving and loading plant material to the erection sites. 1800 pieces of equipment, 24000 linear foot of pipe, and over 25,000 ton of structural steel was received. Managed the crane operator/rigger training and qualifications, also provided fundamental oversight to (50) crane operators. Planned cranes, manpower, and equipment to support the 600,000 barrel per day expansion, making it the largest refinery in the United States and one of the top 10 in the world.

General Superintendent

Zachry Entergy Plum Point Power

10/2007 - 10/2009 Osceola, Arkansas, United States

Responsible for erection of 14,000 ton of structural steel in the boiler and turbine areas; also responsible for the planning and execution of all critical lifts in the above areas, including steam drum, water walls, headers, reheat modules, back pass, air preheaters, and heat exchangers.

Site Superintendent

Shaw Group Cleco Power RPS-3

04/2004 - 10/2007 Lena, Louisiana, United States

Responsible for the erection of 11,000 ton of support steel; also responsible for lift plans and erection of Foster Wheeler supplied steam drums, water walls, cyclones, loop seals, and hot reheat modules for 2 x 330MW CFB.

Site Manager

Zachry EI DuPont

01/2000 - 04/2004 Starke, Florida, United States

Responsible for site management of two DuPont sites. Services provided included supplemental maintenance, lab and geologist services, heavy equipment operations, and warehousing. Several capital projects and outages with durations to three months were completed.

Rigging Superintendent

BE&K Southdown Cement

04/1999 - 11/1999 Kosmosdale, Kentucky, United States

(Outage) Responsible for structural and equipment demolition of an existing preheater tower, cement kiln, burner building, clinker cooler, heat exchanger and baghouse. After completion of the demolition phase, all areas above were reconstructed with multiple tie-ins to the existing plant. The expansion of the plant to 1.6 million tons created one of the largest and most efficient plants in the Midwest.

General Superintendent

TIC Rinker Cement

03/1997 - 11/1999 Miami, Florida, United States

Major systems in project scope included quarry/crushing area through material storage, including a new preheater tower and kiln area. Coal mill cement grinding/storage and truck and rail unloading facilities were also added.

Rigging Superintendent

TIC South Carolina Electric

06/1995 - 03/1997 Charleston, South Carolina, United States

Responsible for erection of an ABB-CE 40 boiler to supply steam for a 100MW turbine; also erected the flue gas cleaning system and baghouse.

Project Superintendent

TIC Mapco Petroleum

06/1994 - 04/1995 Memphis, Tennessee, United States

Responsible for the construction of a complete modularized saturated gas plant located in a petroleum refining facility; work included the erection and installation of (4) towers including an de-ethanizer absorber / stripper, de-butanizer, de-propanizer, and a de-isobutanizer in (2) sections each; (25) equipment modules consisting of exchangers, pumps, piping, instruments and electrical devices; (1) modularized 2000 HP compressor and (4) off modules vessels; concrete foundations, 10,000 lf of process piping, code vessel alterations and structural steel erection.

Rigging Superintendent

TIC Florida Power Teco

02/1992 - 06/1994 Mulberry, Florida, United States

250 MW Integrated Gasification Combine Cycle Plant. Responsible for installation of mechanical and piping associated with the gasification and hot gas clean up areas. Also provided start up and commissioning assistance as well as plant maintenance services for what is considered one of the nations cleanest, most efficient and economical power generation units.

Rigging Superintendent

TIC South Carolina Electric

01/1990 - 02/1992 Cope, South Carolina, United States

Responsible for lift plans and erection of all pressure parts in the furnace and back pass areas, including steam drum, economizer, super heater, reheater and air preheater.

Structural/Rigging General Foreman, Craft Superintendent

TIC/BE&K

01/1980 - 01/1990 Southeastern U.S, United States

Structural steel / heavy crane and rigging. Demolition of Boilers, Paper Machines and Cement Plants.



Contact this candidate