CURRICULUM VITAE
OF
BIYELA PERCY LINDOKUHLE
PERSONAL DETAILS
SURNAME : BIYELA
FIRST NAME : PERCY LINDOKUHLE
DATE OF BIRTH : 16 JULY 1977
ID NUMBER : 770-***-**** 081
GENDER : MALE
MARITAL STATUS : SINGLE
NATIONALITY : SOUTH AFRICAN
CRIMINAL RECORD : NONE
HEALTH : GOOD
HOME LANGUAGE : ISZULU
OTHER LANGUAGE : ENGLISH
HOBBIES : MUSIC &SOCCER
RESIDENTIAL ADDRESS : ENSIMBINI RESERVE WARD 22
ESIKHAWINI
3887
CONTACT DETAILS : 072-***-****
E-MAIL : ac0y72@r.postjobfree.com
EDUCATION QUALIFICATIONS
LAST SCHOOL ATTENDED : TISAND TECHNICAL HIGH SCHOOL
HIGHEST GRADE PASSED : MATRIC (GRADE 12)
YEAR OBTAINED : 1996
SUBJECTS : ISIZULU
ENGLISH
PHYSICAL SCIENCE
WELDING
TECHNICAL DRAWING
MATHEMATICS
TERTIARY QUALIFICATIONS
NAME OF INSTITUTION : NEWCASTLE TECHNICAL COLLEGE
CERTIFICATE OBTAINED : NATIONAL N2 CERTIFICATE
COURSE PASSED : MATHEMATICS, ENGINEERING SCIENCE AND
STRUCTURE STEEL DRAWING &PLATES THEORY
YEAR : 2002
WORK EXPERIENCE
1. NAME OF COMPANY : SVK HOLDINGS
POSITION HELD : BOILERMARKER
YEAR : 2016/09/19 TO 2017/03/03
DUTIES
MODIFY AND INSTALLING HAND RAILS
MODIFY AND INSTALLING GRATINGS
2. NAME OF COMPANY : TONGAT HULLET
POSITION HELD : BOILERMARKER
YEAR : 2016/02/08 TO 2016/04/30
REASON FOR LEAVING : CONTACT ENDED
DUTIES
REFURBISHMENT OF CENTIFIGAL FLOOR BIMES
REPAIR SUGAR DRIERS
REPAIR JUICE TANKS
3. NAME OF COMPANY : GROUP FIVE PROJECT
POSITION HELD : BOILERMAKER
YEAR : 25/11/2014 TO 27/08/2015
REASON FOR LEAVING : CONTACT ENDED
DUTIES
FABRICATION OF TANKS
FABRICATION AND INSTALLATION OF TANKS
4. NAME OF COMPANY : MORECARE ENGINEERING SERVICE(PTY)LTY
POSITION HELD : BOILERMAKER
YEAR : 01/10/2014 TO 01/11/2014
REASON FOR LEAVING : SHUTDOWN
DUTIES
REPARING CHUTES
REPAIR CONVEYER STRUCTURE
5. NAME OF COMPANY : YANDISA TONYS CONTRUCTION
POSITION HELD : BOILERMAKER
YEAR : 24/06/2014 TO 04/07/2014
REASON FOR LEAVING : SHUTDOWN
DUTIES
REMOVING OF OLD LINER PLATES AND PUTTING NEW LINER PLATES
INSTALLING NEW RAIL GUIDES
6.
6. NAME OF COMPANY : LAFARGE
POSITION HELD : BOILERMAKER
YEAR : 24/02/2014 TO 09/05/2015
REASON FOR LEAVING : END OF CONTRACT
DUTIES
CHUTE AND PLATFORM FABRICATION
CRUSHER REPAIR AND DOING GENERAL MAINTENANCE
7. NAME OF COMPANY : EI ELECTRICAL AND GS ELECTRICAL
POSITION HELD : BOILERMAKER
YEAR : 05/09/2013 TO 18/11/2013
REASON FOR LEAVING : END OF CONTRACT
DUTIES
CABLE RACK FABRICATION AND INSTALLATION
8. NAME OF COMPANY : TONYS STEEL CONTRUCTION
POSITION HELD : BOILERMAKER
YEAR : 14/02/2013 TO 15/04/2013
REASON FOR LEAVING : END OF CONTRACT
DUTIES
PIPE REPAIR, CHUTE REPAIR
SCREW CONVEYER FABRICATION
CONE DEVELOPMENT AND FABRICATION
GENERAL PLANT MAINTENANCE
9. NAME OF COMPANY : MAJUBA POWER STATION
POSITION HELD : BOILERMAKER
YEAR : 01/03/2011 TO 15/03/2013
REASON FOR LEAVING : END OF CONTRACT
DUTIES
LINING BUNKERS WITH STIMLESS 16MM LINER PLANT
NEW BERMS FRABRICATION AND MODIFICATION ACCORDING TO THE SITE INSTRUCTION AND SPECIFICATION
DRAWING AND ASSEMBLING BOILER FRAMES TANKS ETS
ASSEMBILING FLUE GAS SYSTEM 7.1
ASSEMBLING MILL DUCTING HOT 6.1 AND 6.2 (COLD AIR /HOT AIR DUCTS)
ASSEMBLING OF OVER FIRE DUCTS
DID PRE ASSEMBLING AND CONSOLIDOTION ON ALL THE SYSTEMS MEINTENED
10. NAME OF COMPANY : UNITEK ENGINEERS
POSITION HELD : BOILERMAKER
YEAR : 01/04/2009 TO 16/12/2010
REASON FOR LEAVING : END OF CONTRACT
DUTIES
STRUCTURE FABRICATION
STEEL CONVEYER FABRICATION
PLATFORM FABRICATION
MANUFACTURING PUMP BASE STANDS
HANDRAIL AND STEEL STRINGERS
11. NAME OF COMPANY : RICHARDS BAY MINERAL
POSITION HELD : BOILERMAKER
YEAR : 2004 TO 2008
REASON FOR LEAVING : RESIGNED
DUTIES
STEEL DEVELOPMENT
STELL FABRICATION CONE, SQUARE TO AROUND, PIPE DEVELOPENT AND PIPE FABRICATION
REFERENCES
1. CONTACT NAME : SHABALALA
CONTACT NUMBER : 082-***-****
NAME OF COMPANY : TONGAT HULLET
2. CONTACT NAME : ATIE
POSITION : SUPERVISOR
CONTACT NUMBER : 081-****-***
NAME OF COMPANY : GROUP FIVE PROJECT
3. CONTACT NAME : ISSAC
POSITION : SUPERVISOR
CONTACT NUMBER : 078-****-***
NAME OF COMPANY : MAJUBA POWER STATION