Resume

Sign in

Manager Quality Control

Location:
Allentown, Pennsylvania, United States
Salary:
80k / year
Posted:
May 31, 2017

Contact this candidate

Harry L. Ahlum Jr. Page *

**** ******* *****, *********, **. 18103

ac0k2v@r.postjobfree.com 610/***-**** Home 484/***-**** Cell Objective

To apply my managerial, supervisory and technical experience in a challenging and creative environment. The desired position will utilize my experience and offer continued growth and advancement. Summary of Qualifications

: 30 years increasing responsibility in the pre-cast / pre-stress concrete & construction industry.

: Resourceful innovator of new production techniques, procedures, equipment and materials.

: Skilled in the interpretation and application of blueprints and project specifications.

: Able to work with the Estimating Department during the bidding process to complete labor & material take-off’s and breakdowns.

: Effective at motivating employee’s and subcontractors to perform to the best of their abilities.

: Strong background in trucking and erection of large pre-cast components & heavy equipment.

: Detailed understanding of Quality Control programs, audits and inspections in the construction industry.

: Detailed understanding of the newest concrete admixtures used in high performance concrete.

: PCI level I & II, ACI grade I and Flatwork certified.

: Comfortable working with today’s computers and software. (including AutoCAD & MS Office)

: Experienced in new facility setup & existing plant modifications & retooling.

: Osha 10 & 30 hour certified.

Professional History

4/16 To Present Universal Concrete Products

Quality Control Manager

Upgrade & manage a new Quality Control program to meet PCI standards, design & install new lab, hire & train new Quality Control staff, manage & oversee the inspection of materials.

Test and guide the development of high performance concrete mixes to be used in architectural concrete panels.

Helped install & take control of new Liebherr pan mixer, with Command Alkon controls. 4/07 To 10/15 Rotondo Weirich 215/***-**** / 681Harleysville Pike - Lederach, Pa. 19450 Quality Control Director (4/07-3/13) Head-up R&D Department

Test and guide the development of high performance concrete mixes to be supplied by local ready mixers for use in prison cell modules prior to module production.

Developed & managed a new Quality Control program spanning as many as 4 project sites running simultaneously around the country, including Tapachula Mexico each consisting of its own Quality Control staff.

Managed & guided project based Quality Control staffs through unannounced PCI and other outside entity inspections with passing scores.

Directly oversaw and trained personnel to oversee the erection of modules at the secure housing facility.

Corporate Asset Director (3/13-10/15) Head-up R&D Department

Direct and control major assets to be used on project sites around the country, including but not limited to logistics, maintenance, certifications, and equipment erection.

Design and oversee the project specific modification of existing molds by both in house field crews and/or outsourced steel fabrication subcontractors.

Worked with & traveled to mold manufacturers in Venice Italy to supply molds for Samawa, Iraq and Brisbane Australia for a project in Melbourne, Australia.

Design new manufacturing facilities and monitor site development through our local Superintendents.

10/06 To 4/07 Fabcon 610/***-**** / 1500 Tilghman St. - Allentown, Pa. 18103 Field Supervisor

Managed and supervised up to seven individual field crews through different stages of completion at building erection sites in my territory including PA., NY. & NJ. o Included scheduling equipment & cranes at each site while sharing Fabcon’s erection, weld out, and repair crews between two other Field Supervisors and their territories. o Worked hand in hand with the Project Managers on each project maximizing profit by controlling schedules, erection rates and repairs. Harry L. Ahlum Jr. resume Page 2

7/03 To 10/06 M.A.R.S. 267/***-**** / 1 Switzgable Dr. - Effort, Pa. 18322 Operations Manager

Design and develop excel based bid tab program including all project costs including margin, insurance and projected project duration to arrive at a per ton material cost.

Assist owner with day to day operations of a mobile aggregate recycling service spanning from NY. to VA. Including safety, maintenance, logistics and manpower. 6/99 To 7/03 Eastern Pre-stress / Oldcastle Precast 215/***-**** / 3030 Unionville Pike - Hatfield, Pa. 19440 Production Scheduler

Schedule bed production of a 250 cubic yard per day structural pre-cast pre-stress facility maintaining a production friendly schedule while meeting erection dates. Assistant Plant Manager

Assist Plant Manager with day to day operation in a structural plant consisting mainly of parking garages & pre-stressed bridge beams including safety, manpower, maintenance and inventory. 2/96 To 6/99 Rotondo Weirich 215/***-**** / 681 Harleysville Pike - Lederach, Pa. 19450 Production Manager (2/96-8/96)

Relocated to Florida producing the first pre-cast quad cell housing modules for the Florida Department of Corrections.

During this project I oversaw up to thirty men producing four quad modules per day managing man hours, inventory, and schedule.

Project Manager (8/96-7/97)

During the Corrections Corporation of America (CCA) Youngstown & Delaware County Prison projects I Managed the projects subcontracts, budgets and schedules. Superintendent (7/97-6/99)

During the CCA California City prison project I managed the site work from initial production site development to shipping of the last module to the CCA erection site. 10/95 To 2/96 Mack Industries 216/***-**** / 2207 Sodom-Hutchings Rd. - Vienna, Oh. 44473 Production Scheduler / Assistant Plant Manager

Schedule casting production of a 100 cubic yard per day pre-cast plant consisting custom man holes, inlet boxes and miscellaneous stock products.

Assist Plant Manager with day to day operation of the same facility including safety, manpower, maintenance and inventory.

2/91 To 10/95 Rotondo/Penn-cast / Pittsburgh, Pa.

Production Supervisor (2/91-6/93)

Relocated to Pittsburgh to open a satellite casting facility producing box culvert for the Pittsburgh International Airport & two expansions of the Pennsylvania Turnpike later producing two large and three smaller prison cell projects.

Supervised 20-40 men in daily production of box culverts including mold stripping, set up, pouring and finishing.

Plant Manager (6/93-10/95)

Managed the facility employing 40-70 men through five Supervisors including reinforcing, production, finish, yard and mold setup.

9/86 To 2/91 Rotondo/Penn-cast 215/***-**** / 514 Township Line Rd. - Telford, Pa. 18969 Laborer

References

Letters of recommendation and other references available upon request.



Contact this candidate