Resume

Sign in

Engineer Project

Location:
Madhya Pradesh, India
Posted:
May 19, 2017
Email:
ac0d05@r.postjobfree.com

Contact this candidate

Sushant Shegaonkar Contact No. 822*******; 947*******

Anchaleshwar Ward, Nr. Shiwaji Sq. Email: ac0d05@r.postjobfree.com

Chandrapur, Maharashtra -442402 ac0d05@r.postjobfree.com

Skype ID: svs.sushant07

Objective:

To manage and supervise execution of the assigned domain for a project in line with overall project plan and requirement of user as per organizational guidelines and internal / statutory requirements to ensure completion of assigned domain/ package as per performance parameters of time, cost and quality.

Contact. No.

Mob: +91-822*******;

+91-947*******

Present Address:

C/O Mr. R. R. Gupta

LIG-123,R. P. Nagar Phase-II,

Korba, Chhattisgarh

Personal Data:

DOB: 12 .07.1980 Sex: Male

Marital Status: Married

Nationality: India

Passport No. J9785567

Interests & Activities:

Music

Playing cricket.

Professional Experience: 12 years

Lanco Infratech Limited

From Feb16, 2010 onwards as an Assistant Manager Mechanical

Petron Engineering Construction Limited- (P.E.C.L )

From MAY 29, 2008 To 14th Feb. 2010 as a Fabrication & Erection Engineer

Sunil Hi-Tech Engineers Ltd.

From OCT 20,2006 To APR 20,2008 as a Project Engineer

Grind well Nortan Ltd.

From Oct20,2005 To Sept 19,2006 As a Production Engineer

Rasayantrik Udyog

From June 01,2003 To May 30,2004 As a Production Engineer

Education:

Diploma in Mechanical Engineering May 2003

B-Tech-Mechanical from Institute of Mechanical Engineering 2014

IT Skill

Competent in Microsoft Outlook, Word, Excel, Access, Visio, and PowerPoint

Areas of Interest/strength:

Erection and Alignment of Boiler, LP piping, Pressure part.TG auxiliary.

Erection and Alignment of ESP, Flue Gas Ducting.

Ability to focus on customer’s needs and deliver them consistently

Commitment to output of high quality and Safety perfect work.

Coordination with client and contractors agency.

Project Exposure:

2 X 660 MW Lanco Amarkantak Power Project Ltd. at Korba, Chhattisgarh,

From 15 Sept 2016 to till date.

This is my ongoing job I am working as an Assistant Manager Mechanical in the field of TG auxiliary for 2 x 660MW Lanco Amarkantak Thermal Power Project. My area of involvement for installation and placement of TG auxiliary. Erection work is awarded to M/S Power Mech Engg. Ltd. M/S HTC is equipment supplier for this Project.

Job Responsibilities:

Reporting to the GM- Mechanical and involved in erection of 2X660 MW in installation and placement of TG auxiliary.(CEP, MDBFP, TDBFP Booster Pump, Vacuum Pump, LP/HP Heaters, Seal Oil Unit, Stator water Unit Etc)

Responsible for day to day site work of domain engineering as per plan.

Assist in quality & safety audits at sites.

Ensure adherence to all systems & processes as required by the organization.

Making Protocols and billing.

Review weekly & monthly reports of package assigned, escalate issues and drive corrective actions

Co-ordinate with Engineers / consultants to finalize layouts and statutory drawings

Submit schedule of domain engineering work packages (mechanical/ civil / electrical domain)

Programming (timelines) for projects.

Attend site meetings.

2 X 600 MW Moserbear Power (M.P) Ltd.Jaithari, Dist- Anuppur Madhya Pradesh,

From 15 May 2013 to 14 Sept 2016.

I am worked here as an Assistant Manager Mechanical in the field of Boiler for 2x600 MW MBPL. My area of involvement encircles Erection for the Boiler; erection work was awarded to M/s Power Mech Engineers Ltd. M/s HARBIN (Chinese Company) is the Equipment supplier for this project for BTG, & M/s Lanco Infratech Ltd. is the main EPC contractor. In addition to this assignment I am also involved in erection and commissioning of LP piping, TG integral Piping.

Job Responsibilities:

Reporting to the GM- Mechanical and involved in erection of 2X600 MW in Boiler supplied by M/s Harbin Ltd., China.

Reporting to the DGM- Mechanical and involved in erection of 2X600 MW and LP Piping. in TG integral piping

Review and ensure availability of correct, consistent and comprehensive drawings and specification with the contractor.

Monitor the delivery and work quality of consultants, PMG, Drive efficiency, review periodically, escalate issues and ensure corrective actions.

Responsible for day to day site work of domain engineering as per plan.

Review weekly & monthly reports of package assigned, escalate issues and drive corrective actions

Co-ordinate with Engineers / consultants to finalize layouts and statutory drawings

Submit schedule of domain engineering work packages (mechanical/ civil / electrical domain).

Evaluate BOQ / tender drawings submitted by consultants.

Prepare and review Level 3 plans for domain engineering work packages.

Forecast the amount of work to executed and hence plan the cash flows at site.

Collaborate and co-ordinate with Contracts & Purchase Team for BOQs, tenders and contracts related issue.

Monitor milestones against project plan.

Review and approve first-level sign off on the measurement sheets, payments.

Ensure implementation of construction QA/ QC processes.

Assist in quality & safety audits at sites.

Ensure adherence to all systems & processes as required by the organization.

Making Protocols and billing.

Achievement: Successful completion of COD of both Unit 2x600MW

2 X 660 MW Lanco Amarkantak Power Project Ltd. at Korba, Chhattisgarh,

From 16 Feb 2010 to 14 May 2013.

I am worked here as a Sr.Engineer (Mechanical) in the field of Boiler for 2x660MW LAPPL Korba. My area of involvement encircles Erection for the Boiler; erection work was awarded to M/s Power Mech Engineers Ltd. M/s DEC (Chinese Company) is the Equipment supplier for this project for BTG, & M/s Lanco Infratech Ltd. is the main EPC contractor.

Job Responsibilities:

Erection & Execution of Boiler Structure and Pressure part.

Complete material procurement schedules.

Correspond with consultant engineer, PM & sub contractor during project to ensure correct mechanical installation.

Programming (timelines) for projects.

Attend site meetings.

Co-ordinate labour / manpower resources to meet program critical dates.

Oversee correct installation by sub – contractors.

Operate to quality assurance requirements.

Co-ordinate installation of mechanical services with other trade.

Ensure the adherence to Safety and Quality standards.

3X 660 MW Adani Maharashtra Ltd,Tiroda,Dist-Gondia,Maharashtra from 20Sept 2009 to 14 Feb 2010.

Worked as an Fabrication and Erection Engineer in the Field of Boiler

Erection and Planning of Boiler Structure

Erection of boiler pressure part

Mobilization of Site and contractor

Attend Site Meeting.

Operate to Quality assurance Requirement

Ensure the adherence to safety and Quality Standards

4 X 300 MW Rosa Thermal Power Project (RTPP) at Rosa, Shahjahanpur, (U.P.)-242001 from 29May2008 to 19 Sept 2009

Worked as an Fabrication and Erection Engineer in the field Boiler 2x300 MW supplied by M/s Shanghai Electricals Ltd. China

Erection and Execution of Boiler Structure, Pressure Parts

Alignment of Boiler structure, Boiler Drum, Pressure part

Erection and Planning of Air Gas Ducting

Ensure implementation of construction QA/ QC processes

Attend Site Meeting

Co-ordinate Site contractor for correct Installation and timely Complete the Task.

Ensure the adherence to Safety and Quality standards.

Achievement: - Record Hydro test in five month thirteen days.

2X300 MW Deenbandhu Chhoturam Thermal Power Project (Reliance Infrastructure) at Yamuna Nagar From 20 Oct 2005 to 20 Apr 2008

Worked as an Project Engineer in the field of ESP (Electrostatic Precipitator), And Flue gas Ducting supplied by M/s Shanghai Electricals Ltd. China

Erection and Execution for ESP.

Erection and Planning of Flue Gas Ducting.

Site Billing and contractor billing,Making Protocol.

Operate to quality assurance requirements.

Co-ordinate labour / manpower resources to meet program critical dates.

Achievement: - Best performance Award for 2006-2007 for Erection & commissioning of ESP & Ducting for2 x 300 MW, DCRTPP site, Yamuna Nagar, Haryana

Grind well Nortan Ltd. MIDC,Butibori,Nagpur, Maharashtra From 20 Oct 2004 to 19 Sept 2005

Worked As an Production Engineer

Manpower planning for the Schedule task.

Power Press Planning and Programming.

Maintains of Power Press.

Maintain Dispatched list of Product.

Rasayantrik Udyog,Industrial Area,Chandrapur,Maharashtra From 01 June 2003 to 30 May2004

Worked As an Production Engineer

Manpower Planning for Fabrication Task of Tank, Shielding, Pipe and Sleeves.

List out Incoming and Outgoing Material.

Maintain Reports for new task.

Costing of Product for Fabrication.

Give instruction to Worker for Fabrication and Bottleneck Of drawing.

Accountabilities:

Conversant in Erection & planning co-ordination,

Preparation of project activity as per contract agreement.

Implementation and timely reporting to higher management.

Identification and organizing material/manpower requirement for erection works.

Tracking project activities with particular emphasis on quality, safety conformity to drawing, specification, standards and codes and periodically reviewed schedule

Present CTC: 9.63 lacks

Declaration: I, hereby, solemnly declare that all the statements made in the above are true and

Correct to the best of my knowledge and belief.

Thanking you,

Sushant Shegaonkar

Place: Anuppur, Madhya Pradesh



Contact this candidate