NAME Haji Dhastagir

PERIOD (MN/YR) DESIGNATION / EMPLOYER'S NAME PROJECT NAME and DUTIES / RESPONSIBILITIES

POSITION and ADDRESS DESCRIPTION

FROM TO

February Present Head - Testing & Qatar Project Lusail CP4 Package Lead the Contractor with Consultant in pre

Commissioning Management, Doha, commissioning, final testing and

2016 Qatar The project comprises commissioning of the installed services.

of 6.8 km highway with Technical review and approval on

3 junctions and two submissions like MAR, MST, Testing

main interchanges and Commissioning Procedures, O&M Manuals,

water storm tunnel at final handing over dossier as per Client

variable depth and 5 and Authority compliance and requirements

substations and (QCS, LREDC and Contract Specifications).

drainage network. Direct, coordinate and ensure the

installation with Contractor to achieve the

Involved MEP System in best start of Testing and Commissioning

T&C and Handing Over: stage.

Foul Sewer Network. Initiate and follow up Authority

Strom Water Network. correspondences through Client (LREDC)

Deep Storm Water closely with Contractor in all of the

Network with Micro required approvals like O&M Manual,

Tunnel. Warranty certificates, Spare Parts, initial

Treated Sewage and final handing over dossier and

Effluent Network. inspection request to relevant Authorities

Free Standing 11KV like Kahramaa, Ashghal, QCDD, MOI and

Substations. Municipality etc.

Fire Alarm and Fire Monitor the Testing and commissioning track

Fighting System. report, deliverables and update the status

Street Lighting, to Client (LREDC).

underpass and High Conduct the required Testing and

Mast Lighting etc. Commissioning Meeting with Contractor and

ELV Dry Ducts. Consultant to ensure the timely completion

SSD, QAF, ITS and QTEL of the Project.

Ducts. Liaising with Contractor and Consultants on

District Cooling determining technical and troubleshooting

energization, etc. issues.

Identifying the areas of system failures

and suggest the necessary rectification as

required to Contractor/Consultant.

Present the status of the project to Client

and update the status on regular basis.

Lead and witnessing all of the MEP Systems

training with End user / Facility

Management Team and handover the overall

system on behalf of the Client.

Coordinate and control all matters of

March January Sr. Testing & Qatar Project Sheraton Park Project Testing and Commissioning activities on

2015 2016 Commissioning Management, Doha, (SPP) site.

Engineer Qatar Technical review and approval on

SPP consist an outdoor submissions like MAR, MST, Testing and

park and a 3 layer Commissioning Procedure, O&M etc., as per

parking. QPM is Client compliance, requirements etc,.

responsible for the Initiate and follow-up closely with

Design and Build Contractor in all of the required

including all submission and approval procedures of

Engineering, authorities like Kahramaa, Ashghal, QCDD,

Procurement, enabling, MOI, Municipality, etc.

structural & Manage, lead and coordinate all matters

architectural works, relating to Testing and Commissioning

External & Landscaping validation perspective.

works. This also Provide the technical assistance and advise

include provision for in all matters of MEP Testing and

66Kv shell & Provision Commissioning Management to ensure th

for MEP works, MSF execution as per the project and local

depot Shell & specification on behalf of the Client.

provision for MEP Direct, coordinate and ensure the

works installation with Project Contractor to

Involved MEP Systems achieve the best start of Testing and

in T&C and Handing Commissioning stage.

Over: Monitor the Commissioning progress with

Parking Management planned report and update the status with

System - Advanced. Client (Qatari Diar, KATARA).

Security System (CCTV, Discuss with Consultant on determining the

Access Control). technical issues and ensure the execution

LV System. to meet the Project technical specification

HVAC. and QCS.

Fire Alarm and Fire Witness and ensure the System final

Fighting System with demonstration, functional test to meet the

FM200. Project requirements.

Central Battery Lead the required training and handing

System. over procedures to the end user's

Emergency Lighting satisfaction with Project Contractor and

System. Consultant and ensure the system which meet

Lifts. the approved O&M Manual, technical

BMS System. specification, etc.,.

Potable Water. Support and approve the MEP claim of the

Drainage System. Contractor and advise the cost saving

Storm Water. possibilities to Client due to design

Car Park Smoke changes, etc.,

Ventilation System. Monitoring and reporting the status of

CO System. Schedules and budgets to Management and

Water Features. Client up to date.

Irrigation System, Conduct the Testing and Commissioning

etc. Meeting with Consultant and Contractor with

the presence of Client to ensure the

Project completion as on planned date.

Follow and response the Contractual and

technical letter correspondence at the

earliest requirements.

Relationship management with the Client for

the Project technical, commercial and

Project handing over etc.,

Sep 2012 Feb 2015 MEP Manager ETASTAR Hilton Riyadh Hotel Worked as MEP Manager Construction and

Construction Engineering and and Residence, Riyadh, reported to Senior Project Manager.

Contracting(Saudi KSA (2 towers, Podium, Responsibilities as follows:

) company LTD. Restaurants, Wedding Evaluating project cost/ benefits analysis

Riyadh, KSA Hall, Lounges etc). at project decision points.

Finalizing requirements and specifications

Involved MEP Systems in consultation with collaborators/

in installation, T&C promoters.

and Handing Over: Anchoring on-site activities to ensure

LV System. completion of project within the time &

GRMS - Guest Room cost parameters and effective resource

Management System. utilization to maximize the output.

Security System (CCTV, Participating in project review meetings

Access Control). for evaluating project progress providing

Wedding Hall (Well technical inputs

advanced with Video Ensuring that equipment/ materials received

wall and Music are in accordance with quantity & quality.

arrangements. Ensuring adherence to quality standards as

HVAC. per the area government standard

Fire Alarm and Fire requirements, Like Saudi Building Code of

Fighting System with KSA and also well knowledge in US, UK

NOVEC. standards, IEC & IEEE wiring regulation.

Central Battery Submitting and Carrying out inspection with

System. authority and energize the system by well

Lighting Control contact with Saudi Authorities SCECO (KSA).

System.

Emergency Lighting Practicing quality standards with key

System. emphasis on improving quality.

Lifts and Escalators. Leading cost reduction projects through

BMS System. design changes, quality improvement &

Hot and Cold Water outsourcing.

System. Keeping schedules and budgets up to date.

Drainage System. Preparing to report on status of projects

Storm Water. weekly to executive management team.

Car Park Smoke Liaising with consultants on determining

Ventilation System. technical and contractual matters.

CO System. Identifying areas of system failures and

Irrigation System, taking steps to rectify the system and

etc. bring the required in Testing and

Commissioning.

Relationship management with the employer

for project related issues.

Executing cost saving and energy saving

techniques/ measures and modifications to

achieve substantial reduction in O & M

expenditures and work within the budget.

Jan 2008 Feb 2012 MEP Project BlueSky with Imperial College of MEP Project Manager, Reporting to Project

Manager Brookfield Londan Diabetes centre Director and lead the project.

Multiplex, Al Ph II, Al Ain. Coordinate all activities within the

Futtaim Abu Dhabi Golf Club Engineering discipline stream for the

Carrillion and Al Eastern Mangroves, Abu Project.

Dar Laing dhabi Carry out detailed design, sizing and

O'rourke, Abu The City of lights, calculations and verify and check the

Dhabi, UAE. Abu dhabi design done by others.

Yas Marina Hotel, Abu To ensure coordination with other

Dhabi disciplines is effective for each Project.

Al Dar Head Quarters Review, check and approval of all

Mussafa Labour Camp Engineering deliverables produced by the

discipline stream.

Involved MEP Systems Check MTOs and ensure that requisition is

in installation, T&C, done with all required documents.

Handing over and Ensure appropriate Engineering methods are

Maintenance: by all within the Project discipline

LV System. stream.

Security System (CCTV, Prepare technical queries, RFI, MAR, MST,

Access Control). etc., and carry out the installation as

Fire Alarm and Fire approved by Consultant.

Fighting System. Ensure all documents and drawings are

Central Battery issued on time and site corrections are

System. captured in as builts.

Dimming Control Submit and follow the approval procedures

System. with authorities like ADDC, AADC, ADSSC,

Emergency Lighting Civil Defense, Municipality etc., for the

System. service requirements of the Project.

Lifts and Escalators. Provide needed guidance to all team within

BMS System. the Project.

Potable Water System. Preparing to report on status of projects

Solar Hot Water weekly to executive management team.

System. Practicing quality standards develop

Drainage System. methods and procedures with key emphasis on

Storm Water. improving quality and efficiency.

Irrigation System, Ensure latest rules and regulations are

etc. carried out by all within the discipline

Mechanical and stream.

Plumbing

(Coordination). Ensure the execution which compliance with

Health, Safety and Environmental (HSE)

responsibilities.

Dec 2005 Dec 2007 MEP Project BlueSky with Nasa The Index Building MEP Project Manager, Reporting to Project

Manager Multiplex, Dubai, Emirates Park Tower Director and lead the project.

UAE Hotel Review all the Electrical Engineering

deliverables for technical content, drawing

Involved MEP Systems quality and adherence to code/project

in installation: requirements.

LV System. Participate and lead discipline meetings

ELV System. and design reviews with Electrical

Fire Alarm and Fire personnel.

Fighting System. Establish the design standards and

Central Battery procedures to manage the work of staff as

System. well as the project teams by assisting in

Emergency Lighting the review of quality assurance and quality

System. control evaluations.

Lifts and Escalators. Lead the team to meet and exceed project,

BMS System. discipline, and business unit goals.

CO System etc. Ensuring that equipment/ materials received

Mechanical and are in accordance with quantity & quality.

Plumbing Anchoring on-site activities to ensure

(Coordination). completion of project within the time &

cost parameters and effective resource

utilization to maximize the output.

Preparing to report on status of projects

weekly to executive management team.

Liaising with consultants on determining

technical and contractual matters.

Identifying areas of system failures and

taking steps to rectify the system and

bring the required in Testing and

Commissioning.

Ensure the execution which compliance with

Health, Safety and Environmental (HSE)

July June Site Engineer BlueSky with Al Dubai Festival City Site Engineer, Reporting to Project Manager

2004 2005 Futtaim (Large area covered and lead the project.

Carillion, Dubai, and facilitated mall). Responsible for the implementations and

UAE monitoring of all electrical related works

at site.

Involved MEP Systems Estimates, prepares and assigns the

in installation: resources such as manpower, materials,

LV System. consumables, equipment, tools, etc.,

ELV System. required for all electrical and related

Fire Alarm and Fire works prior to execution.

Fighting System. Plan and analyze the possible construction

Central Battery methodologies and recommends the best

System. options to the Project Manager for approval

Emergency Lighting prior to execution at site.

System. Interprets the construction drawings and

Lifts and Escalators. study the contract documents and applicable

BMS System. standards or specifications prior to

CO System etc. execution of any jobs.

Mechanical and Manages directly and provide the

Plumbing engineering and technical supports to all

(Coordination). the electrical work groups at site.

Plan the execution of all electrical

related works and coordinates the works to

mechanical and civil groups.

Coordinates with Client / Consultant's

representatives for any site instructions

and inspection of works.

Assign the targets for accomplishments and

ensure targets are met on daily basis for

all electrical groups at site.

Submit the site daily reports, inspection

requests, estimates and all applicable

monitoring reports on regular basis or as

required.

Supports the Project Manager in

accomplishing all the goals and targets for

the electrical groups at site.

Ensures that all the works done are in

accordance with the approved construction

drawings, contract documents, project

specifications, and all applicable

standards whether local, national or

international standards.

Ensures that all site works are done

according to all applicable quality

standards.

Ensure that the execution which compliance

with Health, Safety and Environmental

(HSE).

Performs other related duties as may be

required by the Project Manager.

Nov 2001 Aug 2004 MEP Electrical Nasa Multiplex Dubai Marina Ph I & II Electrical Coordinator, Reporting to MEP

Co-ordinator and Al Futtaim (6 towers, Podium, 64 Manager about the progress and execute the

Carillion JV, villas etc.). project.

Dubai, UAE Plan, direct and coordinate all on-site

Involved MEP Systems electrical activities to comply with

in installation, T&C, specifications, requirements and codes.

Handing over and Provide direction during functional

Maintenance: performance testing of all electrical

LV System. systems.

Security System (CCTV, Assist MEP Manager in updating and

Access Control). achieving schedule requirements, mechanical

Fire Alarm and Fire and electrical RFI's and shop drawings and

Fighting System. administrate electrical project completion

Central Battery requirements.

System. Manage the change order processes,

Dimming Control including pricing, negotiating, processing

System. and assessing cost and schedule impact

Emergency Lighting prior to reviewing with the MEP Manager.

System. Administrating RFI and shop drawing

Lifts and Escalators. process.

BMS System. Handle the submittal/approval, order and

CO System etc. delivery of the Light fixtures for the

Mechanical and entire Project to the Contractor.

Plumbing Develop the performance status reports for

(Coordination). the MEP Manager regarding cost forecast,

schedule and safety.

Assist the MEP Manager with issuing

subcontracts and monitoring their progress.

Assist the MEP Manager with establishing

project safety & environment programs and

providing proactive leadership.

Enforce the contractual responsibilities

with subcontractors.

Involved in all facts of project closeout,

including archiving documents,

maintenance/warranty manuals, deficiencies

and warranty work.

DECLARATION:

I hereby declare that all the information given above is correct to the

best of my knowledge and belief. If appointed for Service for your concern,

I will abide the rules and regulations and will eagerly perform the

challenging tasks and responsibilities in an efficient way.

Place: Doha, Qatar.

Yours faithfully,

Date:

(Haji Dhastagir)

Haji Dhastagir Head - Testing & Commissioning

Doha, Qatar

+974-****-****

ac0a6x@r.postjobfree.com

Years of Experience

16

Education

Bachelor of Engineering in Electrical and Electronics Engineering, Madras

University, India, 2000

Memberships

Member in Saudi Council of Engineering -

Membership number - 112757

Training and Seminar Certificate

Fire Warden - QISC, Qatar.

Ref. No. 149888.

Computer Skills

MS office

Languages

English, Hindi, Tamil, Malayalam

Nationality

Indian

Date of Birth

13th June 1978

Marital Status

Married

Visa Status

Employment

Driving License

KSA/Qatar Valid Manual Driving Licencse

Availability

1 month

Mobilisation Notice

1 month

References

Available upon request

Profile

A highly experience MEP professional career has been built up in the Middle

East, very qualified and comfortable working on iconic projects in the

region.

Strong communication skills and technical expertise means makes a good

addition to any team works with.

Specialities

Lead the team with deep conceptual knowledge and executed projects like

hotel, high rise towers, commercial buildings, villas, hospital, highway

roads and infrastructures etc.

Lead the team in design, planning, man management, installation, testing,

commissioning and maintenance etc.

Involve and follow with authorities in inspections and handing over for all

MEP services as per the Project requirements.

Estimate the project in each individual service and execute it as per

standard.

Involve in the commercial aspects in billing, budgeting which requires till

completion of the project.

Present the Company standards, Project status and work style to Client.

Achievements

Successfully done the Authority approval procedures with Ashghal, QCDD,

Kahramaa, MOI and MMUP through proper correspondences, inspections and

achieved the Building permit, Building Completion Certificate approvals and

Substation Energization by proper follow ups - Lusail CP04B Packages,

Sheraton Park Project - Qatar.

Final Handover Dossier including O&M Manual, Spare Parts List, Warranties,

Training Manual and Testing Commissioning procedure etc., approval achieved

with Authorities very first in Lusail Development area - Qatar.

Identified and rectified the Project delays and handover the Project to end

user in tight deadline - Sheraton Park Project, Qatar.

Reviewed the submitted variation order and saved QAR. 28,000,986 to Client

in CP08A1, CP08A2 and Sheraton Park Project, Qatar.

SAR. 50,000,000 (approx saved and three months delay avoided

-Successfully determined the technical issues with Consultant,

Subcontractors and implemented the necessary rectification techniques in

MEP Coordination, Testing and Commissioning issues- Hilton Riyadh Hotel and

Residence, Riyadh KSA.

Successfully executed and commissioned with authority - Fire Alarm, Fire

Fighting including NOVEC System, GRMS, BMS System including WIFI type

Vingcard access control System etc. - Hilton Riyadh Hotel and Residence,

Riyadh KSA.