Phone 253-***-****
E- mail **********@***.***
Tacoma WA. 98446
Cell #253-***-****
Jerry Lee Cutright
Objective
Complete jobs on time and budget. I have been in the trades as a Carpenter sense 1967; Most of
that time I have been supervising work in cast in place concrete. I design gang forms that you can
use a number of times. I have designed and used flying deck forms. I know tilt and precast. The
largest job dollar wise was 200,000,000; the job is listed on my resume under Boecon construction.
Boecon ask me to take over the job because it was in trouble, I excepted and was able to smooth out
some of the problems. I enjoy my work and love a challenge. I like to travel; I use Prolog, Microsoft
Project, Sure trak, and a number of others.
Norcon Construction INC.
2010-2010 Superintendent
Glen Elder Kansas. Glen Elder Dam emergence spillway rebuild. Hydro blast bad
concrete from spillway and replace.
SGA Construction INC.
2006-2008 Superintendent
Seattle, Tacoma, WA. Industrial complex at FIFE WA. Build eleven offices and
warehouse building. Fuel depot for Richfield, Port of Seattle. Tl. Construction. Renton
WA.
Elder Jones Construction. Inc.
2004- 2006 Superintendent
Yuma AZ. Circuit City. Concrete stem and retaining walls, Exterior block walls, Steel
columns and girders. Q decking with insulation and EPDM roofing. Finish interior, Site
utilities, Parking lot and landscaping.
Milwaukee Wl. Discovery Channel store in a Mall. Circuit city, From start to turn
key. REI store remodels in a number of States.
Norcon Construction Inc. 2003-2004
Superintendent Schofield WI .
Duluth MN. Federal Building. Renovate Front of building and bring into handicap compliance. Budget 1.2
million.
ARCO Construction
2001-2003 Superintendent ST. Louis MO.
• Tl Job, Turn 150000 Sf. Warehouse into cold
storage for Coors distribution. Ontario CA
•Tl Job, Turn l00000 Sf. Warehouse into a distribution center for
McKesson drugs. Ontario CA.
« Tl Job, Remodel 50000 Sf. Warehouse to a technical center for Gates. Rochester Hills Ml.
Turner Construction Co. Inc.
1995-2001 Superintendent Seattle WA
•AT&T Switch Facility. Tacoma WA
•Refit Woolworth building by filling holes in the floors, Build grouted block
walls in front of existing windows for security. One sided forms
and shotcrete walls between columns for seismic. Install new
electrical service. Install new fiber optic. Install Iwo generators, Finish
interior.
Circuit City. Richland WA.
Superintendent
Concrete stem and retaining walls, Exterior block walls, Steel columns and girders. Q decking with
insulation and EPDM roofing. Finish interior, Site utilities, Parking lot and landscaping.
Puget Sound Hospital boiler room. Tacoma WA.
Superintendent
Concrete stem and retaining walls. Block exterior walls, steel columns and girders. Trusses, Bar joist
and Q decking. Insulation and EPDM roofing. Precast tunnel from new boiler room to existing hospital.
Rosen South Building Seattle WA.
General Forman
Consisted of demo of old elevator, Penthouse, Interior and exterior block walls, Build new switch
building, Cut concrete window sills to loosen building, Add steel cross bridging for seismic upgrade.
Place shotcrete wall between columns at exterior and interior walls for seismic upgrade. Install new
hydraulic elevator, finish interior, Site utilities and parking, New face on exterior of building.
Pike Street office and condos. Seattle WA.
Superintendent
Demo all but fifteen inch brick walls. The North wall had to be shored up and new spread footings poured
under the existing footings. Soldier piles auger cast along South property line to hold existing building
while two story parking garage built Stick frame condos on top commercial space. Cast in place concrete
walls on South, West and thou the center of the first floor.
3
Circuit City Spokane WA.
Superintendent
Build two stores at the same time. One on the North side and one on the East Buildings consisting of
block walls, Steel columns, Bar joist, Q decking and EPEM roofing.
Circuit City Springfield OR.
Superintendent
Retail Store built on time and budget.
Circuit City
Superintendent Portland OR.
Take over store not meeting schedule, Complete on time and budget.
Circuit City
Superintendent Olympia WA.
Retail store with tilt up walls, Steel columns, Wood beams and joist Plywood sheeting with insulation and
single ply roofing.
Circuit City
Superintendent
Take a Safeway store and make it into a Circuit City. Store was in progress and behind schedule when I
took it over and completed it on time and budget
Circuit City Beaverton OR.
Superintendent
Retail store completed on time and budget.
Received bonus from Circuit City for completing job in record time.
1993 -1995 Berschauer Philips const. Co. Olympia WA.
Superintendent
Remodel middle school. Build gable roof on existing flat roof. Build addition to North end of school. Do
seismic upgrade. Add windows to building.
1990 -1993 Turner Construction Co. Inc. Seattle WA
General Foreman
Build six new cell blocks at Mc Neil Island state prison. Concrete stem walls, Precast walls, steel columns,
Q decking with concrete slab, insulation with EPDM roofing.
1989 -1990 Liberty Bell construction Seattle WA.
Superintendent/Project manager
Estimate and supervise all projects. Jobs consisted of subcontracting small commercial buildings.
Excavating and backfilling.
1987 -1990 Lease Crutcher Lewis Co. Redmond WA
Field Engineer
Establish and maintain grades and control line. Monitor work being done by subcontractors as for
grade and location. Supervise excavation and back filling operations. Write request for information
and change orders. Verify planes and specifications.
South Hill Mall Puyallup WA.
Continues and spread footings Slab on grade, Tilt up panels, Steel columns, Wide flange beams, Bar
joist with Q decking.
Fairchild chip plant Puyallup WA.
Refit building with new clean rooms, Computer access flooring, Mechanical refit. New halon fire
system.
Seattle University Lab Seattle WA.
Cast in place footings, walls and roof structure. We dug a hole, Built the lab and covered it with earth,
Concrete walkways, Grass and plants, When complete you didn't know it was there.
Pike Street Parking Garage Seattle WA.
Cast in place concrete parking garage.
1986 -1987 Burkley Const. Co. Seattle WA.
Assistant Superintendent
Advanced Tactical Fighter
Three fast track tilt ups for Boeing Co. Jobs consisted of offices and one manufacturing,
Constructed on piling and concrete pile caps. We built these buildings without building permits, With
planning department approval and special inspection.
1982 -1986 Cutright Const. Co. Tacoma WA.
Owner
Self employed. Subcontract commercial buildings, Concrete footing, walls and roofs
5
1986 -1987 Burkley Const. Co. Seattle WA.
Assistant Superintendent
Supervise carpenters, Labors, Cement finishers. Schedule subcontractors. Hold weekly safety
meetings. Advance tactical fighter.
1982 -1986 Cutright Const, Co. Tacoma WA
Owner
Self employed. Subcontract commercial Concrete footing, walls and roof structures. Interior
finish outs. Subcontract framing apartments and Condos. Build spec. Housing.
1979 -1982 Boecon Construction Co. Inc. Seattle WA.
Superintendent
Co-ordinate all phases of projects. Scheduling sup contractors, Order material and equipment
Computer building, Anchoic chamber for Ford motor co and Nuclear rod recycle center.
1972-1979 Cutright construction Co. Tacoma WA.
Owner
Manage contracts and supervise work. Obtain building permit for housing. Build Foundations,
Frame houses and apply siding.